R A I L T R A C K Presentation to Liability Underwriters Group Conference 4 September 2002 Ian Thompson Head of Insurance & Risk Management Railtrack PLC.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
[Organisation’s Title] Environmental Management System
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
IMFO Audit & Risk Indaba June 2012
Development of internal control: methodology and responsibility
October 2008 International Rail Safety Conference 2008 Denver, Colorado, USA.
ISO General Awareness Training
Getting Your EMS Started: Policy Statements EPA Regions 9 & 10 and The Federal Network for Sustainability.
The Australian/New Zealand Standard on Risk Management
BASIC PRINCIPLES IN OCCUPATIONAL HYGIENE Day CAREERS IN OCCUPATIONAL HYGIENE.
Session 3 – Information Security Policies
1 CS38010 Professional Issues Health and Safety at Work.
1 Strategy for risk based health and safety regulation Richard Price IRSC Conference.
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
TERRORISM / POLITICAL VIOLENCE SOLUTIONS FAIR International Insurance Conference on "Political Violence" April 2010 – Karachi Daniel O’Connell
Crisis Management Planning Employee Health Safety and Security Expertise Panel · Presenter Name · 2008.
Railtrack PLC Safety & Standards Directorate Railway Safety: Analysing Risks and Causes Sally Brearley Railtrack Safety and Standards Directorate 8 December.
INTRODUCTION. Department Policy The Department of Environmental Protection recognizes that it has the obligation to provide for the health and safety.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 2 - Who, What Why?
1 CHCOHS312A Follow safety procedures for direct care work.
ASSESSMENT OF CATASTROPHE RISK IN INDUSTRY Paul Kleindorfer Technology and Operations Management, INSEAD Ulku Oktem Risk Management and Decision Processes.
Assessing the efficient cost of sustaining Britain’s rail network: perspectives based on Zonal comparisons. First Conference on Railroad Industry Structure,
Ship Recycling Facility Management System IMO Guideline A.962
OECD Guidelines on Insurer Governance
Occupational Health and Safety
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
International Rail Safety Conference Goa 1 October 2007 – 3 October 2007 GB Experience 10 years after privatisation Anson Jack Deputy Chief Executive Director.
Title: Rail Safety Survey Presenter’s Name: DAISY P. JACOBO Economy: Philippines 33rd APEC Transportation Working Group Tokyo, Japan October
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
CDS Operational Risk Management - October 28, 2005 Existing Methodologies for Operational Risk Mitigation - CDS’s ERM Program ACSDA Seminar - October 26.
Roles and Responsibilities
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
Supporting European Rail Accident Investigation Inter national Rail Safety Conference Sweden 29th September 2009 Dr Jane Rajan Head of sector : safety.
Health and Safety Policy
FLEET MANAGEMENT – A CONTINUING CHALLENGE Nigel Trotman, Business Relationship Manager, Whitbread Plc.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
DriveCam ® Program March 15, Outline Overview of DriveCam Fleet Overview Chronology of Program Coaching Outcomes Financial Outcomes Case Studies.
Nuclear Security Culture William Tobey Workshop on Strengthening the Culture of Nuclear Safety and Security, Sao Paulo, Brazil August 25-26, 2014.
WEC MADRID 18 TH MARCH 2004 ASTRAZENECA’S APPROACH TO SUPPLIER RISK MANAGEMENT.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
An Overview of the Smart Metering Programme in GB.
OPERATIONS AND MAINTENANCE OUTSOURCING IN THE UK 27 th April 2010 Mike Levery MCL Consultancy Ltd © MCL Consultancy Ltd 2010.
International Railway Safety Conference 2008 A regulator’s challenge – inspecting the right things Allan Spence HM Deputy Chief Inspector (Operations)
Human Factors and Signals Passed at Danger Dr Huw Gibson Dr Ann Mills RSSB.
Tom Lenart & John Field CT DEMHS Region 2.  Department of Emergency Services and Public Protection (DESPP)  Commission on Fire Prevention and Control.
SARCC Budget and Strategic Plan 2007/08 Portfolio Committee on Transport 28 February 2007 Presented by SARCC CEO: TL Montana.
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
Leading Nottingham Programme update to ACOS 7 September 2010 Angela Probert Director of HR and Organisational Transformation Contributions from Lisa Sharples.
Leading health & safety on Britain’s railway A strategy for working together Presented by.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
CBIZ RISK & ADVISORY SERVICES BUSINESS CONTINUITY PLANNING Developing a Readiness Strategy that Mitigates Risk and is Actionable and Easy to Implement.
DESTination RAIL Decision Support Tool for Rail Infrastructure EU Project No Railway Pro Investment Summit Building the New CEE Railway Economy.
Emergency Preparedness of Estonia Case Study of Performance Audit National Audit Office of Estonia Alina Undrits.
Provisional view of the Procurement Strategy Phil Bennett Commercial Director.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
RESOURCES AND CORPORATE DEVELOPMENT SCRUTINY COMMITTEE Tuesday 17 th June 2003 RESOURCES DIRECTORATE Julie Alderson Executive Director Resources.
Welcome to the ICT Department Unit 3_5 Security Policies.
1 Address: UIC Safety Database (SDB) System and Results.
ABN: Measuring Safety Performance Senior Managers’ Briefing.
Office of Rail Regulation
Rail Baltica procurement organisation and regulations
Accident investigations: developments and roles
Track circuit reliability assessment for preventing railway accidents
Environmental Health and Safety (EH&S) Supplier Awareness Training
Ian Brooks Assistant Director, PricewaterhouseCoopers
Quick Facts Health & Safety Management
RSSB Board SLT/RSSB Director RSSB Technical Director
Presentation transcript:

R A I L T R A C K Presentation to Liability Underwriters Group Conference 4 September 2002 Ian Thompson Head of Insurance & Risk Management Railtrack PLC (In Railway Administration)

R A I L T R A C K Summary Overview of industry structure/Railtrack Risk Management processes Key risk statistics Why has there been incidents? Industry insurance arrangements Claims Management Conclusion Discussion / Q&A

R A I L T R A C K Rail Regulator SRA Freight operators Passenger train operating co.s (TOCs) Open access operators e.g. Eurostar Britain’s New Railway Industry RAILTRACK owns the railway infrastructure Other service providers e.g. telecoms Infrastructure maintenance companies (IMCs) Track renewal companies (TRCs) Rolling stock companies ROSCOs Heavy maintenance suppliers

R A I L T R A C K The heart of the railway

R A I L T R A C K Railtrack Owns 20,000 miles of track, signalling and electrification 2,500 stations 90 depots 40,000 bridges, viaducts and tunnels 9,000 level crossings

R A I L T R A C K Railtrack’s Objectives Maintain/improve safety Improve network operation/reliability Maintenance & renewal of infrastructure Plan & execute major capital programmes Heavily regulated Currently in administration

R A I L T R A C K Risk Management Process Corporate Governance Safety risk Management Insurance modelling

R A I L T R A C K Goals/Objectives/Standards Response to crisis Monitor & Control Evaluate & improve plan Assess & identify risks Risk Review Group Corporate Governance (Continuous Process)

R A I L T R A C K Railtrack Has Commitment from board level Risk policy statement A senior level risk review group Framework for risk assessment Top down risks culture initiative

R A I L T R A C K Key Risks Regulatory/political Reputation/finance Multi-fatality accident Failure of suppliers Strategy Key people Operational risks

R A I L T R A C K Safety Role of Infrastructure Controller Railway Safety Case Duty Holder Proactive management of risk to the National Network (including imported risk) Monitoring and review of TOC and FOC Safety Cases Management of capacity, safety & performance Contribution to Railway Group Safety Plan

SAFEX ZONE COMMITTEES ENVIRONMENT CATASTROPHY RISK EFFECTIVENESS PEOPLE SAFETY DEVELOP CAPABILITY IMPLEMENT STANDARDS SYSTEM SAFETY SAFETY MEETINGS CONTINUOUS IMPROVEMENT SAFETY TRAINING COMMUNICATIONS PRODUCTION AREA CO-ORDINATORS MANAGEMENT ALL EMPLOYEES CONCEPT PRIORITIES STRATEGY RESOURCES COORDINATION AUDIT EVALUATE EXPERTISE DESIGN COMMUNICATION LEADERSHIP BOARD ORGANISATION FOR SAFETY

Contractor Assurance LinkU p Assuranc e Case H&S Plan Monitoring and Audit Programm e of Audit Database of informatio n Key Performance Indicators Analysis on Contractor Performanc e Action by C&S on Contracto r RAILTRACK

Insurance Modelling Modelling of Key insurable exposures Risk Management Surveys EMLs- Property £375m -Business Interruption £200m -Liability £140m

R A I L T R A C K Key Risk Statistics Train Accident Precursor Indicator SPADs TPWS risk reduction and rollout Track Quality Broken Rails Maintenance and Renewal Spend Train Delays

Train Accident Precursor indicator. Accident Precursor Data 2001/2002 PrecursorRisk weightingP1P2P3P4P5P6P7P8P9P10 Category A SPADs 32.84% Level Crossing Misuse22.84% Broken Rails12.86% Irregular Working8.31% Rolling Stock Failures8.00% Environmental Factors6.07% Total90.92%

R A I L T R A C K Annual Category ‘A’ SPADs

R A I L T R A C K TPWS Scope TPWS is designed to reduce the consequences of a signal passed at danger (SPAD) and will be fitted at vulnerable locations on the network in accordance with the Railway Safety Regulations, This will involve fitting: Around 11,000 signals Over 700 buffer stops Approximately 2,700 permanent speed restrictions Signals complete and operational by end of 2002 All fitments complete and operational by 1 January 2004

R A I L T R A C K TPWS Benefits TPWS will prevent over 70% of accidents due to signals passed at danger. TPWS will also reduce the risk of: -Derailment due to train over speeding -Collision with buffer stops TPWS will save an average of 1.6 lives per year

R A I L T R A C K TPWS Implementation 8298 signals commissioned (77% complete) 446 buffer stops commissioned (66% complete) TOC progress on their fleet installation 65-70% complete TPWS is being successfully delivered to programme

R A I L T R A C K Absolute Track Quality

R A I L T R A C K Number of Broken Rails on the National Rail Network per Year

R A I L T R A C K Railtrack Spend on Maintenance & Renewals

R A I L T R A C K Railtrack Delays by Week 2001/02

R A I L T R A C K Summary Lowest SPADs on record SPAD risk will reduce further with TPWS rollout Track quality 50% improvement Reduced broken rails Increased maintenance & renewal spend –ALL DURING A PERIOD OF SUBSTANTIAL GROWTH IN TRAFFIC

R A I L T R A C K Why has there been incidents? The incidents Comments

R A I L T R A C K Recent Railway Incidents Watford8 August 1996 Southall19 September 1997 Ladbroke Grove5 October 1999 Hatfield17 October 2000 Heck28 February 2001 Potter’s Bar10 May 2002

R A I L T R A C K Comments A “risk free” railway is not possible Assets/Structure inherited at privatisation/change Incident frequency has not increased Incident costs have increased – inter- industry costs Reputation/litigation risk SRA 10 year plan / Network Rail

R A I L T R A C K Industry Insurance Arrangements SRA requires £155m liability cover TOCs/Contractors buy through industry facility Railtrack buy stand-alone cover Is there a better way? Long term relationships? Management of Contractors

R A I L T R A C K Current Difficult Areas Small Contractors Employers Liability Professional Indemnity Good claims record – a problem of perception rather than reality

R A I L T R A C K Railway Claims Management (1) Claims Allocation and Handling Agreement (CAHA) CAHA objectives - Ensure claimants not prejudiced by disaggregation - minimise industry costs CAHA principles- pre-allocated liability for TP &EL claims below threshold - inter-industry claims restricted for property damage and consequential loss. CAHA process- early appointment of “Lead Party” to manage incident /claims - Strategy /authority agreed with “Potentially Liable Parties” - Allocation of liability agreed later through internal industry dispute mechanism or court

R A I L T R A C K Railway Claims Management (2) CAHA Benefits:- Pro-active response Industry cohesion Single point of contact Reduce industry claims handling / legal costs Dirty linen not washed in public

R A I L T R A C K Overall Conclusions Extensive industry effort to manage risk Improving key risk statistics Incident frequency no worse Consider alternative insurance structures Address poor perception of railways Pro-active management of claims Now is a good time to underwrite rail