ERP A MANUFACTURING PERSPECTIVE

Slides:



Advertisements
Similar presentations
Inventory Systems for Dependent Demand
Advertisements

Lean Manufacturing.
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
© Pearson Prentice Hall Using MIS 2e Chapter 7 Information Systems within Organizations David Kroenke 10/16 – 5:30AM.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Managing Production across the Supply Chain
Omercan Barut Dokuz Eylul University Industrial Engineering.
Distribution Requirements Planning
Supply Chain Management
The Fundamentals of Enterprise Resource Planning Olayele Adelakun (Ph.D) Assistant Professor CTI Office: Room 735 CTI 7th Floor Phone: Fax:
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
INDUSTRIAL & SYSTEMS ENGINEERING
Principles of Information Systems, Seventh Edition2 An organization’s TPS must support the routine, day-to- day activities that occur in the normal course.
Chapter 7 Functional and Enterprise Systems. Chapter 7Slide 2 Customer Relationship Management  Customer Relationship Management The philosophy that.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
MANAGING INVENTORY, MRP AND JIT.  Inventory management is a system used to oversee the flow of products and services in and out of an organization. A.
ERP Benefits.
Material Requirements Planning
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Designing Goods and Services and Process Selection
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Aggregate Planning and Resource Planning Chapters 13 and 14.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 Prentice Hall, Inc. All rights reserved. Operations Management.
So What? Operations Management EMBA Summer TARGET You are, aspire to be, or need to communicate with an executive that does not have direct responsibility.
Operations Management Material Requirements Planning
CAD CAM CADMAT A2 Graphics. CADMAT We will look at … We will look at … CADMAT CADMAT –Computer aided design, manufacture and Testing PDM PDM –Project.
Lecture Outline 5 Manufacturing Systems (Production and Operations Management) p. 304+
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Concepts in Enterprise Resource Planning 4th Edition Chapter three Production and Supply Chain Management Information Systems 1Concepts in Enterprise Resource.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Designing Goods and Services and Process Selection
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
Chapter 20 Managing inventory and quality. The importance of inventory management §Cope with uncertainties in customer demand and in production processes.
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Production management Content – Core work process – 6 W – Production classification – EOQ – Lean Manufacturing – Systems of Management production.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
Inventory control and recent trends in PPC
Functional and Enterprise Systems
Supply Chain Management
Definition of CIM “CIM is the integration of the total manufacturing enterprise through the use of integrated systems and data communications coupled.
Facility Inventory Old Facilities Modern Facilities Classroom Size
Integrated MPC Systems
Chapter 7 The Conversion Cycle 1.
BUAD306 MRP/ERP.
Functional and Enterprise Systems
MRP and ERP.
CHAPTER 14 MRP and ERP.
MODERN TRENDS IN PRODUCTION ENGINEERING
Inventory control and recent trends in PPC
Operations Management
14 MRP and ERP.
Operations Management
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

ERP A MANUFACTURING PERSPECTIVE Chapter-4

COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING (CAD / CAM) Computer Aided Design (CAD) is a popular tool for product design and is major focus area for manufacturing sector. CAD systems are computer programs or integrated packages for work station hardware and software that allow the user to draw and easily modify product designs on a computer screen. Eg-aerospace & automotive are largest user of CAD/CAM. Like M&M Advanced CAD systems provide designers with at least three major benefits: -

A. GRAPHICS CAPABILITIES: CAD systems allow the designer to view a product from different perspectives, including three-dimensional rotations, and various cross-sections. The designer can also make proportional changes in scale, or change the angle of an arc with the click of a computer mouse rather than having to redraw the entire product.

B. DESIGN, STORAGE & RETRIEVAL: Some CAD systems can store the design characteristics of existing products & components. Example, if a company needs a gear for a new product, the designer can enter relevant information about the gear, such as it diameter, tooth pattern and required hardness, into the CAD system . The CAD system determines whether the company is already using an identical or sufficiently similar gear, in which case a new one in unnecessary, if not, then use the design of this similar gear as a starting point for the new gear. This capability not only promotes the use of common components but also reduces design time.

C. AUTOMATIC EVALUATION OF SPECIFICATIONS: 1. One of the most time-consuming aspects of design for highly technical products is calculating whether or not product specifications, such as strength, heat resistance or aerodynamic drag, are satisfied. 2. These calculations can be programmed into some CAD systems so that whenever the designer changes the design (by altering the shape or material to be used) these performance characteristics are recalculated automatically and compared to the product requirements. 3. This is sometimes called Computer-Aided-Engineering (CAE) The overall benefits of CAD systems can be substantial. The features described above reduce the development time and cost, and they improve product quality because more design options can be evaluated in greater detail more quickly

MATERIALS REQUIREMENT PLANNING(MRP) MRP is a method for ordering components than the independent demand inventory models MRP : It is a phase in the development of computerized methods for planning the use of company resources , including scheduling raw materials, vendors, production equipments and processes. MRP evolved into a comprehensive priority planning system. MRP provides a method that helps keep order due dates valid even after the orders have been released to the shop floor or outside vendor. MRP systems can detect when the due date of an order – the date the order is scheduled to arrive- is out of alignment with its need date , the date the order is actually required.

The expanded MRP system became known as closed loop MRP, because it provided feedback from the execution function to the planning functions, so manufactures could change plans if necessary. The new system, which was called manufacturing resource planning (MRP-II), was a comprehensive approach for the effective planning of all resources of a manufacturing organization. Production & materials planning is critical to the success of a manufacturing company. A company can have the best product design, the newest manufacturing facilities, the latest equipment & all the latest production technologies like CAD/CAM, robotics , automated guided vehicles (AGVs) etc. but not the ability to compete.

An MRP system requires 3 types of information: MRP has proved to be an effective production & inventory planning system in a wide variety of environments. An MRP system requires 3 types of information: Master Production schedule (MSP) Bill of Material (BOM) Inventory Records (IR) The MSP is detailed production schedule for finished gods or end items that provides the major input to materials requirement planning process. Associated with each finished product is BOM , which describes the dependent demand relationships that exist among the various components materials, parts, subassemblies , etc.- comprising the finished product.

The entire set of BOMs for the company finished products is called BOM file. Inventory status data for each product or component such as stock-in –hand, stock-on order, etc, .are provided by the inventory records, which also contains planning factors like lead time, safety stock, re order, and so on. MRP logic uses the MPS, the BOM file & the inventory records to determine the following for the components: Planned order quantities Planned order release dates (to shop floor/suppliers) Planned order due dates The MRP system calculates the release dates & due date taking into consideration the lead times required to produce or procure the components and by recognizing the order in which they are assembled into the finished product. If the MRP process is carried out in conjunction with the capacity planning, the production facility should have to complete the orders on time.

BILL OF MATERIAL (BOM) A BOM defines the relationship of components to end items. The BOM identifies all components used in the production of an item, the ordered quantity & the order in which components are assembled. A BOM can define products as they are designed (engineering bill of materials), as they are ordered (sales bill of materials), as they are built (manufacturing bill of materials), or as they are maintained (service bill odf materials .

Fig : Bill of material for a office chair BACK CUSHION CHAIR FRAME SEAT CUSHION FASTENERS ADJUSTTNER Mechanism BASE UNIT Wheels Fasteners. Fig : Bill of material for a office chair

Closed Loop MRP Closed loop MRP uses capacity planning & feedback to improve the ability of the production system to complete work as planned. To determine how well the planning factors & tools are working ,MRP planners need feedback from the shopkeeper and purchasing department. With effective feedback MRP planner can revise the planning factors and techniques so that better materials can be developed for future.

DISTRIBUTION REQUIRMENT PLANNING DRP is having same logic as of MRP into Physical distribution System. DRP assist companies that maintain distribution inventories in fields warehouse, distribution centers by improving the linkage between marketplace requirements & manufacturing activities. It helps mgmt to anticipate future requirements which closely match the supply of products to the demand for them. A DRP system also improves savings through improved planning of transportation capacity needs , vehicle dispatching & warehouse receipt planning. DPR has a central role in phsical dist. system., similar to MRP’s role in coordinating material in manufac. system.

MANUFACTURING RESOURCE PLANNING (MRP – II) 1. MRP was originally developed as a computer system that was limited to materials planning. 2. MRP –II is an expansion of closed loop MRP for managing an entire manufacturing company. 3. MRP II system provides information that is useful to all functional areas & encourages cross- functional interaction. 4. MRP II supports sales & marketing by providing and orders- promising capability. MRP-II is expansion of closed loop . 5. Order promising is a method of tying customer’s orders to finished goods in the MPS.

6. This allow sales personnel to have accurate information on product available & gives them the ability to give customers accurate delivery dates 7.MRP II supports financial planning by converting materials schedules into capital requirement. 8. A company can use MRP II to simulate the effects of different master production schedules on material usage, labor, & capital requirement. MRP II provides the purchasing department with information for developing long range buying plans .

9. It is common for suppliers to directly access a customers MRP system to receive up to date information on the customers planned materials needs. 10. Information in the MRPII system is used to provide accounting with information on materials receipts to determine accounts payable. Shop floor control information is used to track workers hrs for payroll purposes. 11. MRP II system increases a company’s efficiency by providing a central source of management information.

Just In Time (JIT)/KANBAN : JIT means to produce goods & services when needed, not too late or not too early. It is time Based & often has quality and efficiency targets. The JIT is a production philosophy. It is also known as zero defects & synchronous production. The JIT system also uses the method of scheduling material flow (KANBAN). A JIT system aims to make goods available just in time, and these can be parts, products or sub-assemblies.

The benefits are as follows: i. Increase Flexibility ii. Reduction of Cost iii. Increased Quality iv. Simplicity of System The increased flexibility allows the company to react to the changing needs i.e. change in the customer orders or design modification. Increased Productivity means that the shortest time and minimum of resources are required to make the product. To achieve the objectives of the JIT three principles are applies to the organization i. Elimination of waste ii. Total Quality Management iii. Total Employee Environment

TOTAL QUALITY MANAGEMENT ELIMINATION OF WASTE It means that all the activities which do not add any values and do not increase product value and are costly to the company should be eliminated. For Eg: the traditional production method. TOTAL QUALITY MANAGEMENT Total quality management eliminates the defects in a JIT environment. The aim is to prevent defects from occurring and this can be achieved by detecting the problem at their source. TOTAL EMPLOYEE ENVIORNMENT It means that the management must provide the leadership which result in the employees to be more participative in the process, continuous education & training is provided.

KANBAN 1. The manufacturing organization considers the making of a product as continuous activity from design, manufacturing, distribution, sales and customer services. 2. For many companies the heart of this process is KANBAN. It is a Japanese term which means “Visual Record”. It was developed at Toyota in 1950 and it was considered to manage the material flow on the assembly line. 3. It is a highly efficient and effective production system, which has an optimum manufacturing environment, which leads to global competitiveness. 4. The KANBAN process involves more than fine tuning production and supplier scheduling system, where inventories are minimized by supplying the components only when required in production & work in progress is monitored.

It also encourages industrial re-engineering & group production techniques & employees are encouraged to participate continuously. 6. The Japanese refer to KANBAN as a simple parts - movement system that depends upon the cards & boxes to take part from one station to another. 7. The essence of KANBAN concept is that the supplier or the ware house should only deliver components to the production line as & when they are required so that there is no storage in the production areas. 8. It also limits in the amount of inventory. 9. KANBAN is a chain process in which orders flow from one process to another, the production or deliver of components is made to the production line.

The advantages of KANBAN are as follows:- 1. It is a simple & understandable process 2. Provides quick and precise information 3. Results in low cost 4. Provides quick response to the changes 5. Limits of over-capacity in processes. 6. Avoids over production 7. Minimizes waste 8. Maintains control 9. Delegates responsibility to the line workers.

Benefits of JIT Increased Quality: The benefits of a properly implemented JIT system are: Increased Flexibility: i. This can be achieved through small batch sizes which achieves faster throughput. ii. A flexible workforce means that the operators must be multi-skilled which is done through training. iii. The worker should be free to move from low demand to high demand areas. Increased Quality: i. When operating a JIT system, disruption has a major impact, so quality problems need to be eliminated. ii. Benchmarking, Quality function deployment and service design can be used for service operations. iii. Service employees need to learn the value of providing defect free services.

Parts Reduction: i. It seeks to continuously reduce inventory levels of raw material, work in process and finished goods. ii. Lower inventory means less space and less chance of the product being obsolete, damaged or spoilt. iii. Inventories can be reduced if products are produced, purchased, and delivered in small lots. Simplicity of Systems: i. product mix or volume changes as planned by the master production schedule (MPS), can be accomplished by adjusting the number of cards in the system. ii. Production orders are prioritized by the cards on post. iii. Production orders for parts that are running low are moved in front of parts that have more supply.

POTENTIAL PITFALLS OF JIT 1. Companies fail to understand what JIT is and what it can mean to them because they fail to implement it properly. 2. The system requires the full backing of the top management so that they are aware of the tasks, resources, time scale and costs. 3. The system will fail if an adequate education program is not provided. 4. If careful planning process and control movements are not strictly followed, they will result in JIT not being realized.

5. The planning stage requires dedication and time and also the assistance of an external consultant. 6. All of the above must be integrated with moves towards JIT purchasing. 7. The JIT system should not be viewed as a one off scheme but as an ongoing continuous process.

PRODUCT DATA MANAGEMENT (PDM) 1. One of the major manufacturing challenges is to maximize the time-to-market benefits of concurrent engineering while maintaining control of the data, and distributing it automatically to the people who need it, when they need it. 2. The way PDM systems cope with this challenge is that the master data is secured once in a secure ‘vault’, where its integrity can be assured as all changes to it monitored, controlled and recorded. 3. Duplicate reference copies of the master data, on the other hand, can be distributed freely, to users in various departments for design, analysis and approval. 4. The new data is then released back into the vault. When a ‘change’ is made to the data, signed and dated, is stored in the vault alongside the old data which remains in its original form as a permanent record.

PROCESS MANAGEMENT Process management is about controlling the way people create and modify data-active procedures. This may sound like a new name for ‘project management’, but it is not. Project management concerns itself only with the delegation of tasks; process management addresses the impact of tasks on data. Process management systems normally have three broad functions: They manage what happens to the data when someone works on it (Work Management). They manage the flow of data between people (Workflow Management). They keep track of all the events and movements that happen in functions 1 and 2 during the history of a project (Work History Management).

MAKE-TO-ORDER (MTO) and MAKE-TO-STOCK (MTS) One way to classify the manufacturing operations is by the amount of processing the product requires, after the company receives an order from a customer. At one end of the processing spectrum is the make-to-order (MTO) company. This company does not begin processing the material for the component or product until it has received an order from the customer. In some cases, the company may not even procure the material and components until after it receives the order. This type of manufacturing operations is practiced when the company competes on the basis of production planning on firm customer orders.

Following figure shows the relation between the output variety (degree of customization) and the type of manufacturing operation. As is evident from the graph, the output variety is highest when the company is operating in the make-to-order mode, as the companies can serve each & every individual customer in the way he/she wants. But the cycle time will be more and the cost of the product will also be more. But in the case of a MTS company, the products are already made and kept in the inventory for the customer to pick up. Here, the customer won’t get any individual attention or customization; he can buy what is available with the company.

At the opposite end of the spectrum is the make-to-stock (MTS) company, which manufactures products and places them in inventory before it receives customer orders. Either the customer purchases the products directly from the inventory at a retail outlet, or the company ships the product ‘off-the-shelf’ from the finished goods inventory at the factory or at a distribution centre. MTS companies rely heavily on market analysis and demand forecasting in planning the production of their products with respect to the product mix and volume.