Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
1 Background: Use of TKR Trigger One-Shots individual TKR strip channels “true” when analog shaped pulse is above threshold. strips in a plane are OR’d.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
9/23/2005 Inst. Ana. MeetingTKR trigger efficiency with ACD&CAL 1 Study of TKR trigger efficiency with ACD and CAL Mutsumi Sugizaki, Hiro Tajima SLAC.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Trending ACD performance Parameters of interest Online tests (CPTs) TCI (charge injection) -> PHA TCI -> Veto mapping Timing PHA Pedestals Offline tests.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
ACD Calibrations in L&EO Needed Calibrations Pedestals (low and high range) Low range gains via MIP peak positions Veto and HLD discriminator set points.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ACD G3 Talks - 1 March, Gamma-ray Large Area Space Telescope GLAST Large Area Telescope GASU Based Trigger Systems Jim Panetta.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope:
Acd Veto Latching The Acd front end electronics generate a veto primitive when a discriminator goes above threshold. But. The signal is split: One path.
Background Rejection Prep Work
I&T&C Organization Chart
LAT System Verification Issues
GLAST Large Area Telescope:
Mini-Tower test results
GLAST Large Area Telescope
GLAST Large Area Telescope Instrument Science Operations Center
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Overview Goal Study GEM variables in SVAC ntuple
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
Eduardo do Couto e Silva Feb 28, 2006
Integration & Test Instrument Operations Coordination
SVAC Configuration Verification
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong

Sep/26/05Trigger test plan Test Reorganization ACD test STRs reorganized and are now all part of standard trigger tests. Tests are classified into two categories: –Early ACD trigger tests with ACD+GASU alone (some with muon telescope) using LATTE 4, which can be performed in the tent. These are necessary to establish basic ACD trigger configuration as a base to facilitate development of LAT level tests later. –Full LAT trigger tests, include some ACD related tests. Tests will be modular for LICOS/FSW and LATTE 4 compatibility (in most cases). They are also designed to be usable as far as it could for the remaining journey of the LAT after shipped out of SLAC.

Sep/26/05Trigger test plan Documentation Status Full LAT test prelim plan revised and first draft update incorporated into the perf & ops test plan doc by Eric. The early ACD test descriptions are also created based on the original STRs: to be incoporated into the perf & ops plan doc. Summary of the test scripts will be documented in MD by Martin and prelim version is at:

Sep/26/05Trigger test plan Early Trigger ACD Tests These are essential pre-requisite for establishing basic ACD settings for other trigger tests. Can be performed with ACD+GASU (some with muon telescope) in the tent before LAT integration. Scripts based on LATTE 4 Need modern version of GASU with all ACD connectors and firmware include GEM arrival time. Delay these tests until after full LAT integration could miss opportunities for finding potential problems early and significantly delay overall schedule.

Sep/26/05Trigger test plan Early trigger ACD tests ACD channel uniformity map –Charge injection tests: GEM veto list map, arrival time uniformity and ROI&CNO triggers. ACD TREQ timing resolution –TREQ tests with muon telescope as reference for a few tiles. ACD hit latching control parameter tuning –ACD hit delay & stretch effects and buffer boundary. ACD standalone TACK scan. ACD trigger rate for each tile.

Sep/26/05Trigger test plan Early ACD test preparation Test scripts validated in the testbed lab.with MiniLAT by Martin. Some worrisome effects observed on the MiniLAT which should be verified with full ACD asap.

Sep/26/05Trigger test plan LAT Level Tests TREQ tests simultaneously for all towers/tiles and using ACD ROI trigger as timing reference. TACK scan for TKR/CAL/ACD simultaneously using TKR triggers (need to see if sufficient for ACD). Trigger efficiency tests (TRK/CAL/ACD triggers). ACD veto test (CAL trigger, check TKR+ROI veto) ACD trigger rate tests (ACD ROI trigger) GEM self integrity tests (mainly data monitoring to check consistency)