DE03XC109 20500 W 13 Mile Road, Birmingham, MI 48024 42.51773, -83.24728 Access: Gate Code 0721 5/11/12 Walked by; C&S Engineers – Alan MacPherson,

Slides:



Advertisements
Similar presentations
1 Fortune Metal Inc. Cable Mining Program Asset Recovery Through Utilities Extraction Engineering Team Central Office Team Cable Removal Team Trimming.
Advertisements

Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
UNIT 31 HOME ELECTRICAL SYSTEM
New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
43 VILLA ROAD HANDSWORTH BIRMINGHAM B19 1BH 9 The Square 111 Broad Street Birmingham B15 1AS Tel: TO LET Offices NIA.
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Outside plant (OSP) cabling
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
South Portion of Reroute North Portion of Reroute.
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
Partial Underground Analysis– TRTP Project Project Segment 8A Corridor October 29, 2011.
1 System Upgrades. This module reviews DIRECTV system upgrade instructions System Upgrades.
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
Electrical Power Systems
CONSTRUCTION BLUEPRINT READING
How to build a small inexpensive low-tunnel hoop house.
Master Examination Practice Drill # (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.
Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/1 Issue 1.3 SGB LEAK PREVENTION SYSTEM SGB GmbH.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
INSTALL THE TRANSMISSION LINE By Mohd Nasir bin Said.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
CUSTOMER ACCESS NETWORK BY Mohd Nasir bin Said ADTEC Kulim.
TTS 171 : PART 1: 2002 ANNEX E PRESENTER WINSTON THOMAS ELECTRICALINSPECTOR 1 ELECTRICAL INSPECTOR 1.
BIS Internship Summary Powerpoint Created by BIS Student Cylor Morgan (used with permission)
Procedure of Connecting Coil Unit In series with Capacitor 10 April 14 Product: Fully Automatic Washing Machine.
Pythagorean Theorem Two sides of a right triangle measure 6 feet and 8 feet. What is the length of the hypotenuse?
Fiber Optic Data Network Project Tuscaloosa County School System 2006.
Project Oasis West Des Moines, Iowa Presentation January 30, 2013.
Site Construction & Installation Services
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
1 Air Conditioning Breaker Panels and Disconnects.
How many wires can safety be installed in a junction box
By Tanya Bankston.  Current Version of the manual was prepared by Neel-Schaffer in 2002  The Traffic Signal Manual is currently being updated by DOTD.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Voltage Tester Used for testing voltage on electrical outlets, fuse clips, and circuit breakers will test voltage from 120 to 600 volts.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
MnDOT Intelligent Transportation Systems Project Management Design Course Section 6: Discussion.
AT&T Managed Internet Service (MIS) with Ethernet Customer Site Preparation Document This document addresses Customer sites that do not have AT&T fiber.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
ELECTRICAL General Industry Standards Examination, Installation and Use of Equipment Electrical equipment shall be free from recognized hazards that.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
May “In-kind” vs. Site Development Replacing 73.5-ft. wood utility pole with 88.5-ft steel monopole tower Attaching antenna array Re-grading the.
Asset Management Asset ID Tags. RFID Tag location Guide An RFID tag should be attached so it is visible when the device is placed in its final location.
RFID/GIS Technology Hampton Roads ITS Communication Infrastructure Neil Reed Hampton Roads TOC 5/17/2013.
Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA AA-0017 Photos by Anthony TorresPage 1 of 3 June 26, 2013 The Volkswagen.
How to build a small inexpensive low-tunnel hoop house
Smitty’s Two Minute Drill Grounding
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
Inspection Davenport IA
In-Building Northwestern University
Chain survey
2011 Changes Two Minute Drill
Plan for the installation of the TAMU screen
Surviving the OSHA Audit!
Engineering Team Central Office Team Trimming & Splicing Team
Fiber Installation Preliminary Design Review
INDOOR BASEBALL / SOFTBALL FACILITY
ANNEX E PRESENTER WINSTON THOMAS
RV Solar Panel Installation
Pump House wall before installation.
Chain survey By :- Parveen Kumar.
Smitty’s Two Minute Drill Grounding and Bonding
Question 1. Question 1 What is 10 x 40? A 40 B 400 C 4000 D 4.0.
Presentation transcript:

DE03XC W 13 Mile Road, Birmingham, MI , Access: Gate Code /11/12 Walked by; C&S Engineers – Alan MacPherson, AT&T – Jeff Davis,

Aerial Photo DE03XC , “Meet Me Point”

Site Sketch T T P P 2” BURIED TELCO CONDUIT 2” BURIED POWER CONDUIT

Site Survey

6

SOW summary ASP to install 2” conduit (hand trenched) with mule tape from the “Meet Me Point” to the proposed Ciena location. Total run of the new conduit is 18’ and will be installed at the depth of 3’. Photos showing the trench depth are required. ASP to install 380’ of mule tape in existing conduit from 13 Mile Road to the site for AT&T to pull fiber to site. AT&T to mount proposed NID (Ciena 3911) to new PPC H-frame east of existing Sprint platform. ASP to install (2) 2” conduits (hand trenched) from proposed Ciena location to existing steel equipment platform each for power and telco. ASP to install (2) new 1¼” flexible conduits attached to perimeter beam of existing steel platform for power and telco connection to the proposed NID. – Power conduit will be installed between battery cabinet and the proposed Ciena with a junction box and whip capable of connecting temporarily to the existing +24VDC Power Plant during the interim phase and then connecting to the proposed -48VDC Power Plant upon completion of the equipment upgrade. Approximate length of the power conduit is 17ft. – Telco conduit will run from proposed MMBS to proposed Ciena. Approximate length of telco conduit is 10 ft. ASP to run 17 ft of 12 AWG power cables from the power plant to the proposed location of the Ciena (installed by AT&T). ASP to run #6 ground wire from the proposed MMBS and proposed power plant to the existing equipment platform and from the proposed Ciena to the new H-frame to tie new equipment into the site grounding system. Approximate ground wire length is 12 ft. ASP to restore all work areas to the pre-construction condition.

ASP to install mule tape 380ft from existing AT&T handhole in 13 Mile Road R.O.W. to the site. AT&T to pull fiber through conduit to site ASP to install mule tape in existing conduit from fiber hand hole to site. 380 ft Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise)

ASP to install mule tape 380ft from existing AT&T handhole in 13 Mile Road R.O.W. to the site. AT&T to pull fiber through conduit to site ASP to install mule tape in existing conduit from fiber hand hole to site. 380 ft Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise)

ASP to install mule tape 380ft from existing AT&T handhole in 13 Mile Road R.O.W. to the site. AT&T to pull fiber through conduit to site Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise) 2” conduit from “Meet Me Point” to Ciena “Meet Me Point” (new pull box on existing H-frame) 8’ 380’ Proposed AT&T OFDT ASP to install mule tape in existing conduit from fiber hand hole to site. 11’

ASP to install 18ft of 2” conduit (hand trenched) with fiber from the Ciena to the “Meet Me Point”. and install Ciena on new H-frame located east of the existing Sprint platform. ASP to install MMBS on existing platform in the northwest corner and connect to Ciena with 17ft of 2” conduit (hand trenched). AT&T to install new junction box (2’x2’x8”) on the west face of existing H-frame located 5’ north of the existing telco pedestal which will be the “Meet Me Point”. Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise) 2” conduit with fiber from Ciena to MMBS 8’ Proposed MMBS on existing steel platform 5’ 3’ Proposed -48VDC Power Plant location 8’ 2” conduit with 12 AWG power cable from power plant to Ciena Proposed Ciena 3911 on new H-frame 5’ 8’ “Meet me point” 12’ 2” conduit from “Meet Me Point” to Ciena

ASP to install 18ft of 2” conduit (hand trenched) with fiber from the Ciena to the “Meet Me Point”. and install Ciena on new H-frame located east of the existing Sprint platform. ASP to install MMBS on existing platform in the northwest corner and connect to Ciena with 17ft of 2” conduit (hand trenched). AT&T to install new junction box (2’x2’x8”) on the west face of existing H-frame located 5’ north of the existing telco pedestal which will be the “Meet Me Point”. Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise) 2” conduit with fiber from Ciena to MMBS Proposed MMBS on existing steel platform Proposed -48VDC Power Plant location 8’ 2” conduit with 12 AWG power cable from power plant to Ciena Proposed Ciena 3911 on new H-frame 5’ 12’ 6’ 3’

Notes No fiber at site. Need to install 380’ of mule tape from 13 Mile Rd. R.O.W through existing conduit.