277a_W00OCT03_CM FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Presentation GNSS 7.3 by Hank Cabler Co-Chairman, SOIT.

Slides:



Advertisements
Similar presentations
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Advertisements

Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Have you ever wondered how an aircraft can find a specific airport in a highly populated airspace?
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Government/Industry Aeronautical Charting Forum (ACF) Meeting ~ May 1 - 2, 2002 New Charting Topic WAAS LPV Charting Requirements Hank.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
METIS First Master Training & Seminar
Wide Area Augmentation System (WAAS)
Performance-based Navigation Honeywell SmartPathTM
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
GAGAN USER GROUP INTERACTION PROGRAM WITH HELICOPTER OPERATORS 10 th July 2014 Airports Authority of India New Delhi Airports Authority of India- FPD section1.
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
Increasing The Relevance Of AVS Within The NAS 9 January 2007 Nominated for Flight International’s “Aerospace Industry Awards” 2005.
WAAS it all about? New capabilities with your enhanced-accuracy GPS Navigator Ed Williams SMXGIG 2007.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Federal Aviation Administration Navigation Services Overview Briefing to Air Traffic Management Bureau of the Civil Aviation Administration of China (CAAC)
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002 PROCEDURES FOR AIR NAVIGATION SERVICES- OPERATIONS (PANS OPS ICAO DOC. 8168) Barry Billmann Federal.
Larry Oliver FAA Flight Standards (AFS-430) Advanced Management Technology, Inc. Federal Aviation Administration GPS/WAAS.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS Presentation GNSS 1.1 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
Status of Operational GNSS Augmentations in United States
Federal Aviation Administration GPS Augmentation Systems Status Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) September 2009.
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
Performance Based Navigation
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Presented to: PNT Advisory Board By: JC Johns, Director Navigation Services Date: May 14, 2009 Federal Aviation Administration GNSS Program Status WAAS,
VDA – Vertical Descent Angle
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Satellite Navigation Program Federal Aviation Administration.
GNSS Aviation Applications
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
ADVANCED AVIATION TECHNOLOGIES RELATED TO AVIATION CAPACITY IMPROVEMENTS Prepared for: MTC Prepared By: Don Crisp ATAC February 23, 2007.
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
Wide Area Augmentation System Steve Jackson TERPs Standards Development Specialist Flight Procedure Standards Branch AFS-420 Oklahoma City, OK.
1 IATA / Airline Views on Performance Based Navigation Theo van de Ven/KLMAnthony van der Veldt/IATA Senior Manager Strategy & User ChargesAsst Dir Safety.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
Larry Oliver FAA Flight Standards (AFS-430) GPS Technical Assistance Contract Federal Aviation Administration Everything You Wanted to Know About GPS and.
Federal Aviation Administration 0 GPS, WAAS, GBAS Overview March 8, GPS Integrity RAIM, WAAS, and GBAS: Concepts and Status Federal Aviation Administration.
Jimmy R. Snow COMMISSIONING THE WIDE AREA AUGMENTATION SYSTEM.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 Operational Integration Team Complex Procedure Presentation Alaska October 2-4, 2002 Dave Peterson.
Overview of FAA Satellite Navigation Transition and Backup Strategies Int’l Loran Association October 28, 2002.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Space-Based Navigation Systems
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
2003 FRP User Conferences 1 FAA’s Transition Strategy for Navigation and Landing Services Dave Olsen Navigation System Engineer Architecture and Systems.
Satellite Navigation Program
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Performance Based Navigation Today & Tomorrow An FAA Perspective
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Developing a Low Level IFR Helicopter Infrastructure
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Association of California Airports Instrument Flight Procedures
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002
Wide Area Augmentation System (WAAS)
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
WAAS LPV Charting Requirements
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

277a_W00OCT03_CM FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Presentation GNSS 7.3 by Hank Cabler Co-Chairman, SOIT

277a_W00OCT03_CM History  1993 GPS Approved for use in multi-sensor applications (FMS)  also Phase 1 overlays  1994 GPS Approved for IFR use  Enroute Domestic--same as other RNAV systems Oceanic--used only with dissimilar LRNS  Terminal--SIDS & STARS  Approach--overlays & stand-alone  1995 GPS “Primary-means” approval for oceanic & remote  1999 GPS SCAT-1 approval  2001 WAAS approved for VFR

277a_W00OCT03_CM Current Status  GPS Approaches ~3500  New RNAV approach chart  Designed to support WAAS, GPS, RNP 0.3, FMS Baro-VNAV  WAAS (SBAS) LNAV/VNAV Commissioning Scheduled in 2003  LPV - new approach concept  LAAS CAT I in 2004  LAAS CAT II & III later  RNP/RNAV standards development underway

277a_W00OCT03_CM GPS Docs  GPS IFR  AC GPS operational guidance  TSO C-129A--equipment standard  AC & installation standard  Oceanic & Remote  HBAT operational guidance  N equipment standard 

277a_W00OCT03_CM New RNAV SIAPs

277a_W00OCT03_CM New RNAV Approach Plate  Approach and landing operations with vertical guidance (APV) - An instrument approach and landing which utilizes lateral and vertical guidance but does not meet the requirements established for precision approach and landing operations.  LPV - a new line of minima using the Wide Area Augmentation System (WAAS). This approach combines the lateral precision of a localizer with the vertical performance of APV-1. Provides significant operational benefits as compared to LNAV/VNAV approaches.  LNAV/VNAV - A vertically guided approach with a decision altitude down to 350 feet above the runway touchdown point (HAT). Requires a WAAS-certified receiver (or certain Flight Management Systems with barometric VNAV). Visibility requirements are generally one mile at airports without approach lighting systems.  LNAV - A nonprecision approach (no vertical guidance) with a minimum descent altitude (MDA) of 250 feet above obstacles along the flight path. At many airports, LNAV approaches will have lower minimums than existing VOR or NDB approaches. LNAV approaches can be conducted today with approach-certified (TSO-129) GPS receivers.

277a_W00OCT03_CM WAAS Status  WAAS Prime Contract Development Is Ahead Of Schedule  Contractor Acceptance Is Expected In Second Quarter Of FY 03  Commissioning Expected By Dec 03  WAAS Hardware Is Fielded And Software Development Completed To Provide A Signal-In-Space  Software Integrity Monitors And Safety Analyses Are Being Revised To Insure System Certification For IFR Use  WAAS Is Being Developed Using An Incremental Strategy To Provide Benefits As They Become Available  GEO Satellite Acquisition Activities Underway  System Is Broadcasting 24/7 And Is Providing A Robust And Reliable Signal-In-Space To A Variety Of Users

277a_W00OCT03_CM LAAS Status  Government Industry Partnership (GIP) to develop non-Fed CAT I system under FAA Type Acceptance process (Honeywell, Raytheon, Thales)  Honeywell - “Beta LAAS” at ORD, MDW, MEM, SEA  Raytheon prototype (SCAT conversion) at SLC  Thales prototype planned at New Century Airport, KS  First LAAS CAT I commissioned December 2004  CAT II & III later  User Requirements: CAT I with advanced procedures ASAP!

277a_W00OCT03_CM Questions??  