Triton Lining Systems LLC. The City of Sac City, Sac City Iowa, Water Distribution Pipe In-Situ Rehabilitation July 2012.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Barhale Procedure for Site Establishment
Watermain Rehabilitation Eliminating the need for temporary bypass Derrick Horsman, P.Eng. Alltech Solutions INC.
WASH Cluster – Groundwater Pumping GWP GWP4 1 Groundwater Pumping Session 4 Water Distribution.
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
Permanent Head Gasket & Block Repair w/Nanotechnology, 32 Fl Oz
Innovative solutions for the rehabilitation of lead service connection lines and adjacent water mains.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Grinder pumps are selected, instead of gravity sewers, when you need more freedom to run sewer up hills, through isolated flat lands, or in areas with.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
1 Computer Technician Computer Trouble Shooting & Repair Process Copyright © Texas Education Agency, All rights reserved.
WP Inc: spray nozzle blues
Pigs Unlimited, Inc. Introduces….
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
December 4, 2014 Macon, Georgia Georgia Mountains Regional Commission.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Leak Detection at C.C.W.A.. History of C.C.W.A. CCWA produces up to 39 million gallons a day of potable water. We have a potable water storage capacity.
Introduction Leak Detection Sam Godfrey SAMCO Leak Detection Services 1308 Daytona Dr. Austin, TX
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
© Goodheart-Willcox Co., Inc.  Cooling system diagnosis  Cooling system problems  Thermostat service  Cooling system hose service  Radiator and.
Spray Finishing Operations/Spray Booth March 9, 2009.
Dennis Sabre Fire Appliances
Unit 205: Cold water systems
Project Close Out CTC-470.
Controlling Hazardous Energy
Coliform Event Recommendations and Best Management Practices Sammamish Plateau Water and Sewer District Workshop December 9th, 2014 Sammamish Plateau Water.
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP.
Pavement Restoration on Main Replacement Projects Pipe Splitting and Keyhole Technology At Southwest Gas Corporation Southwest Gas Corporation Kenny Pollock.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Case Study 3.1: WP Inc. Problem-Solving
Water Supply.
Water System Design - The Role of O&M Staff Cheryl Capron Seattle Public Utilities.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Maintenance of Machine tools
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
15 Water Supply. 2 Objectives Describe the sources of water for a municipal water supply system. Explain the purpose of a water treatment facility. Describe.
3M Water Infrastructure Space for 3M Montage © 3M All Rights Reserved. 3M Water Infrastructure General Overview Mayors Water Council Meeting 2009.
Drinking Water + Compressed Air = Dangerous Mixture Spokane Regional Cross Connection Control Chapter Requirements for Winterizing Irrigation Systems with.
Asset Management: What It Means For Water Distribution Operability & Criticality December 09, 2008 Paul Schumi Wachs Utility Services.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
TRENTON Casing Filler Presentation
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Greener Living Contracting By Ryan Brooks. Greener Living Contracting is a private company whose specialty is to increase the efficiency of home and business.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
1 Public Hearing User Rate Adjustments April 8, 2008.
Smoke Testing Information
Existing System The system originally operated with everyone having 24-hour availability. The village then created a 3-day rotation which improved the.
Webster Water System Board of Selectmen Public Hearing on Water Quality October 13, 2015 Doran Crouse, Webster Water Department Scott Charpentier, P.E.,
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Community Pipeline Safety Initiative – St. Helena 1 Community Pipeline Safety Initiative City of St. Helena Tree Commission May 12, 2016.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
WATER SYSTEM WORKSHOP February 27, 2012
Water System Infrastructure
Workshop developed by RCAP/AWWA and funded by the USEPA
Concrete Repair.
14 Refrigerant Recovery, Recycling, and Recharging.
SAFE WORK INSTRUCTIONS
WATER MAIN REHABILITATION
Fire Protection Survey Procedure
Troubleshooting 11/14/2018 Water King Service Seminar.
System Lock Out/Tag Out and Line Breaking GSS24
AGA Positions on Current PHMSA Rulemakings
City of Roundup, Montana
Water Main Rehabilitation Cured-In-Place-Pipe Technology
TRENTON Casing Filler Presentation
Control of Hazardous Energy
Operations and Maintenance
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Presentation transcript:

Triton Lining Systems LLC. The City of Sac City, Sac City Iowa, Water Distribution Pipe In-Situ Rehabilitation July 2012

Project Details 1,129’ x 6” cast iron water main 1,563’ x 4” cast iron water main Installed – 1940’s, 1970’s, 1990’s Properties affected – 41 homes, 105 residents Subdivision - Oak Hill Drive Problem – Severe discolored water complaints

The Problem / Cause The conveyed water interacted with the cast iron, causing severe tuberculation build up, internal corrosion, loss of hydraulic efficiency, loss of carrying capacity, degradation of water quality & pipe integrity

Attempted Remedies The system was ‘looped’ – the problem got worse Super chlorination of the entire water system (break point chlorination) for 30 days - helped short term but the problem returned Hydrant flushing increased – occasionally made the problem worse Direction of water flow changed – no effect Supplied customers in the effected area with water filters - helped but didn’t fix the problem

The Search for a Solution Contacted Iowa Rural Water Association Contacted American Water Works Association Talked with vendors All resources had no new ideas other than replacing the mains Started searching the internet for ideas

Potential Solutions 1. Temporary fix: Furnish the homes with a high end filtration system - Cost approx. $1,000.00/home ($41,000 total). Filters will last years with cleaning annually but does not fix the problem 2. Semi-permanent: Pig or swab the lines - this would not fix the problem just delay it’s return. Associated issues - plugged service lines, plugged water heaters, residue in the pipes. Cost - $12, Long term/semi-permanent fix: Rehabilitate the pipe in place - a longer lasting solution (50 year design life), medium cost but permanent elimination of problem 4. Permanent Solution: Replace the main – high cost

Narrowing the Options Main Replacement Pro’s - Permanent Fix - City Crews familiar with process Con’s - 2 year duration - Cost Main Rehabilitation Pro’s - Less Cost - Speed of installation - No Engineering fees - Less social disruption Con’s - Unfamiliar to City crews - 1 st in the State of Iowa to use this technology

The Chosen Solution City personnel searched for an appropriate technology that would deal with the problems, while offering a long term, cost effective solution They found and employed Triton Lining Systems to rehabilitate the piping system and eliminate all the problems associated with it

Planning The City & Triton met to discuss the project The project area was walked, all excavation locations identified & marked, temporary water system mapped out, proposed working sequence planned, responsibilities determined & the final price agreed

Working Partners a Novel Approach The City & Triton formed an excellent working relationship where City personnel were utilized to undertake the functions of the project they were equipped for and accustomed to doing, while Triton performed the actual cleaning & lining of the pipes This scenario enabled the project to be complete in approx. 16 weeks with minimal social disruption and at a saving of over $1,575,000 compared to traditional remove and replace

Work Area & Bypass Plan

The Rehabilitation 9 Step Process 1.Pipe Location / Access – City Personnel 2.Bypass – City Personnel 3.Excavation – City Personnel 4. Isolation – City Personnel 5.Cleaning – Triton 6.Inspection (Pre lining) – Triton 7.Lining – Triton 8.Inspection (Post lining) – Triton 9.Re Connection / Disinfection – City Personnel

Pipe Location / Access Excavation locations were pre determined by Triton, utility locates were organized and performed by the City Road cut permits were obtained prior to construction

Bypass An above ground bypass system was installed to feed water to all properties affected by the construction This meant customers were only affected for a very short time during the set up and removal of the bypass system

Excavation Wherever possible, excavations / access openings were made at existing fittings (valves, tees, fire hydrants, bends etc.) This enabled the opportunity to upgrade the entire system

Isolation Isolation valves that only affected the pipes within the project area were identified Valves were checked for operation and complete shut down prior to construction

The Pipe Prior to Cleaning

Pipe Cleaning Pipe scrapers were pulled through the line several times to loosen any tuberculation and buildup, this was done with the additional use of water

Plunging / Swabbing After scraping, plungers were pulled through the line several times to remove the loose debris and any remaining liquids Foam swabs were then washed through with water to remove any remaining debris

Finally, foam swabs were blown through the pipe with compressed air to remove fine particles and dry the pipe Swabbing

The Pipe After Cleaning & Drying

CCTV Inspection The cleaned pipe was then cctv inspected for verification and effectiveness of the cleaning

Inspection (Pre Lining) The purpose of the pre lining inspection is verify the effectiveness of the cleaning and identify any potential problems such as: Un clean pipe Un known valves Bends Standing or running water (leaking services) Over poured lead joints (lead fish) Repair sections / open joints / clamps Low service connections Obstructions

The Lining Process

Control Systems Computerized metering and monitoring ensure quality and repeatability of applied linings A hard copy print out records all pertinent information and allows for verification of lining parameters

The Pipe After Lining The rehabilitated pipe will never suffer from any of the problems it had prior to the process The lining has an AWWARf design life of over 50 years

Lined Pipe (Showing service connection) The Triton In-Situ spray lining process doesn’t block service connections

The cured lining was inspected via CCTV to ensure lining quality Post Lining Inspection

Re Connection The City then reconnected all pipe work and checked the couplings under pressure

Disinfection Following the pressure testing of the new pipe and fittings the City disinfected / chlorinated the pipes in accordance with local and AWWA standards Once the bacteriological samples had passed they reconnected the properties back to the main, removed the bypass, back filled the excavations and reinstated the surface

Results Upon completion of the project fire flows were restored, the pipe has long term corrosion protection, chlorine residual is maintained, discoloured water complaints ceased, the problems will never return and customers are happy Additional benefit - saving $1,575,000.00

City Personnel Utility locates Bypass installation Excavation Pipe removal Pipe reconnection Backfill Surface reinstatement Bypass removal Project Responsibilities Summary Triton Pipe cleaning Post cleaning cctv inspection Pipe spray lining Post lining cctv inspection (City personnel gave assistance to Triton with the above)

Triton Lining Systems LLC. PO Box 1476 Carefree, AZ Tel: The City of Sac City 302 East Main Street, PO Box 37 Sac City, Iowa Tel: