S afety Excellence. Excavations Subpart P One-hour.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Safety in Excavation.
UNIVERSITY of NORTHERN COLORADO Trenching and Shoring.
Excavation & Trenching Presented by Name Title Date.
TRENCH RESCUE AWARENESS
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~Eleanor Everet.
1 Excavations Module 14. 2Objectives After this module you should be able to – identify the most common excavation hazards – take the steps necessary.
Trenching & Shoring Safety
EXCAVATION AND TRENCH PROTECTION
TRENCHING AND EXCAVATIONS
1 Excavations Best Practice Excavations. 2 Agenda - Introduction Statistics Excavations - Best Practices Question Period.
1 Risk Management Services State of Georgia Risk Management Services Trenching Safety Training Department of Administrative Services Loss Control Services.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
Developed under an OSHA Susan B. Harwood Grant, #46F4-HT01, by the Associated Builders and Contractors-Central Texas Chapter 1 Excavation Safety for Residential.
OSHA Office of Training and Education1 Excavations – Subpart P.
Trenching and Excavating Safety. Asphyxiation Each time a breath is exhaled the weight of the load restricts inhalation of the next breath. Slow suffocation.
Excavation Review 1.  OSHA began because, until 1970, there were no national laws for safety and health hazards.  On average, 12 workers die every day.
Excavation Safety for Workers Specifically for Type C Soils Submitted by Dr Les LaFountain with Project Navigator, Ltd., June 2008.
Trenching and Excavation Safety.  About 400 workers die in the U.S. every year and about 6500 are seriously injured in trenching and excavation related.
Risk Management Department
FALL PROTECTION. What, me worry? According to the US DOL, falls are the leading cause of worker fatalities in the construction industry. On average, between.
Roofing Fall Protection The following presentation can be used to satisfy the training requirements of the Fall Protection Standard in the WISHA Safety.
Type B may be simply sloped or benched.
Safety : Excavations l Introduction to Industrial Technology l Spring 2014 l Mr. Shubert 1.
Construction Hazards Safety Training Presentations Institute of Occupational Safety and Health.
Fall Protection in the Roofing Industry
Rev: Section 1 Overview of Fall Protection.
Trenching and Shoring 29 CFR A Trenching Tragedy False sense of security Knew they were out of compliance Thought the soil was stable Conditions.
Susan Harwood Program Grant – The University of Texas at Arlington Thanks to the Susan Harwood Program Grant.
CORPORATE SAFETY TRAINING
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
OSHA’s Fall Prevention Campaign
EXCAVATION. Excavation 1Excavation activity involves use of manual and mechanical means and interaction of both. Hence, safety aspect to plan involvement.
Fall Protection Review. Objectives Increase management sensitivity on Falls safety Increase disciplined compliance to policies and procedures Increase.
AJ Gajdosik, CSP, ARM-P St. Louis ASSE Chapter Meeting July 2015.
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~Eleanor Everet.
Big Four Construction Hazards: Caught-in Hazards This material was produced under grant number 46F5-HT03 and modify under grant number SH F-72,
Copyright © Excavations, Subpart P.
CONFINED SPACE ENTRY. CONFINED SPACE STATISTICS u 65% Of All Confined Space Fatalities Due To Hazardous Atmosphere u In All Deaths Last Year (139), There.
FALL PROTECTION. Duty To Have Fall Protection Protection at or above 6’ level Walking/working surfaces inspected before work begins Employees can only.
Module 13 Excavations.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Excavations & Trenching.
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~ Eleanor Everet.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
TRENCHING & EXCAVATION
Excavation Safety.
EXCAVATION AND TRENCHING
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
OSHA Office of Training and Education
Excavation & Trench Safety
Trenching & Excavation (Subpart P). People die in excavations! Regulations 29 CFR 1926, Subpart P People die in excavations! Regulations 29 CFR 1926,
Excavations & Trenching
COMPETENT PERSON TRAINING for TRENCHING OPERATIONS
GENERAL REQUIREMENTS CFR paragraphs (a) through (l) The Competent Person has responsibility to evaluate all hazards in the vicinity of the work.
Excavation & Trenching Awareness Plus
Trenching Competent Person
1 2 EXCAVATIONS STOP WORK !!! 3 Regulations OSH Standards Rule 1410 –Construction Safety OSH Standards Rule 1413-Excavation 29 CFR 1926 Sub Part P -
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
Fall Protection for Construction
Excavation Hazards & Controls.
Safety Orientation Michael Downey.
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Objectives Upon completion of this module you should be able to:
OSHA Office of Training and Education
Safety Orientation for Construction.
Excavations Subpart P One-hour. Excavations Subpart P One-hour.
10-Hour Construction Outreach
Presentation transcript:

S afety Excellence

Excavations Subpart P One-hour

S afety Excellence People die in excavations! See Fatal Facts Regulations 29 CFR 1926, Subpart P People die in excavations! See Fatal Facts Regulations 29 CFR 1926, Subpart P Why the Training?

S afety Excellence What We Will Cover Regulations Competent Person  Qualifications  Responsibilities Hazards of Excavations

S afety Excellence What We Will Cover Soil Classifications Protective Systems  Sloping  Shoring Inspections Emergency Response

S afety Excellence Regulations 29 CFR 1926 Subpart P - Excavations  Appoint Competent Person Soil evaluations by Competent Person Daily Inspections by Competent Person Shoring and sloping evaluations by Competent Person Stop Work Authority of Competent Person

S afety Excellence Competent Person "Competent person" means one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.

S afety Excellence Competent Person Qualifications  Knowledge of soils and soil classification  Understands design and use of protective systems  Ability to recognize and test hazardous atmospheres  Documented training  Prior excavation experience Qualifications  Knowledge of soils and soil classification  Understands design and use of protective systems  Ability to recognize and test hazardous atmospheres  Documented training  Prior excavation experience

S afety Excellence Competent Person Responsibilities  Site safety briefings on excavation safety  Daily excavation inspections More frequent if conditions change (e.g. freeze/thaw, rain, vibration)  Physically located at the excavation Responsibilities  Site safety briefings on excavation safety  Daily excavation inspections More frequent if conditions change (e.g. freeze/thaw, rain, vibration)  Physically located at the excavation STOP WORK AUTHORITY!!!

S afety Excellence Excavation Hazards  Hazardous atmospheres  Water accumulation  Adjacent structures  Loose rock or soil  Falls  Cave-in  Hazardous atmospheres  Water accumulation  Adjacent structures  Loose rock or soil  Falls  Cave-in  Surface encumbrances  Utilities  Access/Egress  Vehicle traffic  Falling loads  Mobile equipment

S afety Excellence Surface Encumbrances Need to be removed or supported e.g. fencing, piping, structure, materials Need to be removed or supported e.g. fencing, piping, structure, materials

S afety Excellence Utilities Underground  Locate prior to digging  Certify deactivation  Protect, support, or remove Underground  Locate prior to digging  Certify deactivation  Protect, support, or remove

S afety Excellence Utilities Aboveground  De-energize or  Isolation from power lines Aboveground  De-energize or  Isolation from power lines

S afety Excellence Access/Egress Note: Poor housekeeping --- # 1 cause of slips, trips and falls on construction projects  Debris kept cleared from work areas  Mark hazards  Barricade or cover holes Egress provided-  25’ travel distance  ladders  ramps  stairs Note: Poor housekeeping --- # 1 cause of slips, trips and falls on construction projects  Debris kept cleared from work areas  Mark hazards  Barricade or cover holes Egress provided-  25’ travel distance  ladders  ramps  stairs

S afety Excellence Vehicle Traffic Traffic Control Traffic Safety Vests Traffic Control Traffic Safety Vests

S afety Excellence Exposure to Falling Loads No work under loads Operators remain in cab

S afety Excellence Mobile Equipment Warning system  Barricades  Hand signals  Mechanical signals  Stop logs  Grade away from excavation Warning system  Barricades  Hand signals  Mechanical signals  Stop logs  Grade away from excavation

S afety Excellence Hazardous Atmospheres 4’ if suspected  LEL  Oxygen  CO  H2S  Petroleum  Other toxics 4’ if suspected  LEL  Oxygen  CO  H2S  Petroleum  Other toxics

S afety Excellence Ventilation Displace hazardous gases and vapors Considerations  Heavier than air or lighter than air contaminant  Exhausting or blowing in  Volume/time required to lower concentrations to acceptable levels Displace hazardous gases and vapors Considerations  Heavier than air or lighter than air contaminant  Exhausting or blowing in  Volume/time required to lower concentrations to acceptable levels

S afety Excellence Water Accumulation Protection from hazards associated with water accumulation  Protection against cave-in  Water removal (pumping)  Run-off protection  Consider temporary shut-off of water lines

S afety Excellence Adjacent Structures Ensure structure stability  Shoring  Bracing  Underpinning  Or evaluation by P.E. Ensure structure stability  Shoring  Bracing  Underpinning  Or evaluation by P.E.

S afety Excellence Loose Rock and Soil Protection of employees from loose rock or soil  Scaling  Protective barriers  Placing material at least 2’ from edge  No work on slopes above workers Protection of employees from loose rock or soil  Scaling  Protective barriers  Placing material at least 2’ from edge  No work on slopes above workers

S afety Excellence Fall Protection Any surface 6 feet or more above a lower level shall be protected by:  walkways with guardrail systems  personal fall arrest systems Other options include:  warning lines systems  safety monitoring systems Any surface 6 feet or more above a lower level shall be protected by:  walkways with guardrail systems  personal fall arrest systems Other options include:  warning lines systems  safety monitoring systems

S afety Excellence Cave-in Protection from cave-in requires a systematic approach including:  Soil classification  Protective systems  Inspection  Employee training Protection from cave-in requires a systematic approach including:  Soil classification  Protective systems  Inspection  Employee training An oh sh_t!

S afety Excellence Soil Classification Soil Classification (Type A,B,or C) determines construction of protective system:  Sloping or benching  Shoring Timber shoring Aluminum shoring Soil Classification (Type A,B,or C) determines construction of protective system:  Sloping or benching  Shoring Timber shoring Aluminum shoring

S afety Excellence - YO! Protective Systems Required unless:  Excavation in stable rock  Excavation less than 5 ‘ (4’ some states) and examination by Competent Person determines no potential for cave-in Required unless:  Excavation in stable rock  Excavation less than 5 ‘ (4’ some states) and examination by Competent Person determines no potential for cave-in

S afety Excellence Protective Systems Options Include:  Sloping and benching  Shoring/sheet piling/ shielding (e.g.trench boxes)  Designed by P.E. if deeper than 20’ Options Include:  Sloping and benching  Shoring/sheet piling/ shielding (e.g.trench boxes)  Designed by P.E. if deeper than 20’

S afety Excellence Simple Sloping Type A - 3/4:1 Type B - 1:1 Type C - 1½ :1 Type A - 3/4:1 Type B - 1:1 Type C - 1½ :1

S afety Excellence Benching Type A Type B (cohesive soil) Type C Type A Type B (cohesive soil) Type C NA

S afety Excellence Shoring Based on OSHA Appendices Based on Manufacturer data Designed by a P.E. Based on OSHA Appendices Based on Manufacturer data Designed by a P.E.

S afety Excellence Timber Shoring Installations Appendix C of OSHA regulations Requires soil classification Based on depth and width of trench Consult tables for specs on  Cross braces  Wales  Uprights

S afety Excellence Aluminum Shoring Installations Appendix D of OSHA regulations Requires soil classification Based on depth and width of trench Consult tables for specs on  Hydraulic cylinders  Wales  Uprights Appendix D of OSHA regulations Requires soil classification Based on depth and width of trench Consult tables for specs on  Hydraulic cylinders  Wales  Uprights

S afety Excellence Shields (i.e. Trench Boxes)

S afety Excellence Protective Systems Installation  Securely connected  Employees clear of area under shields during installation  Installed to prevent movement  Must protect employees while entering excavation

S afety Excellence Protective Systems Removal  Employees clear of area under shields during removal  Shoring removed from the bottom up, SLOWLY!  Backfill with removal Removal  Employees clear of area under shields during removal  Shoring removed from the bottom up, SLOWLY!  Backfill with removal

S afety Excellence Excavation Inspections Daily Inspections of ALL excavations by Competent Person  Start of shift, as needed, following rainstorms or other hazard-increasing event Possible cave-ins Protective system failure Water accumulation Hazardous atmospheres  Competent person has authority to remove workers from the excavation Daily Inspections of ALL excavations by Competent Person  Start of shift, as needed, following rainstorms or other hazard-increasing event Possible cave-ins Protective system failure Water accumulation Hazardous atmospheres  Competent person has authority to remove workers from the excavation

S afety Excellence Excavation Rescue

S afety Excellence Excavation Rescue

S afety Excellence Excavation Rescue Initial Size-up  Type of incident? Cave-in, flooding, medical, fire, spill  Injuries? Number and type  Missing personnel?  Chemical (or sewage) exposures?  Safety of excavation for rescuers?

S afety Excellence Excavation Rescue Notify:  Field personnel  HSO = Emergency Coordinator  Fire Department  Police Department  Emergency Medical Services (EMS)/Hospital Notify:  Field personnel  HSO = Emergency Coordinator  Fire Department  Police Department  Emergency Medical Services (EMS)/Hospital

S afety Excellence Excavation Rescue Stabilize cave-in Control flooding Hazardous Atmospheres?  Ventilate  SCBA  Safety harness and line  Basket stretcher Stabilize cave-in Control flooding Hazardous Atmospheres?  Ventilate  SCBA  Safety harness and line  Basket stretcher

S afety Excellence DON’T ROLL THE DICE!!! Excavation Rescues The best rescue is the one you never have to make!  Practice proper procedures Make sure everything is safe before anybody goes in! The best rescue is the one you never have to make!  Practice proper procedures Make sure everything is safe before anybody goes in!