PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)

Slides:



Advertisements
Similar presentations
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Advertisements

Step-by-step assembly instructions
Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
L2000 Technical Training 6. Assemble/Disassemble.
USE A SHEET OF LINED PAPER AND FOLLOW THE INSTRUCTIONS PLEASE NOTE: We are using lined paper to make the drawings easier for you. 1.DRAW A HORIZONTAL.
1 Installation of Delphi Frame  ITS Installation.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
How to Make a Marshmallow Shooter By Pierce H..
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
The Victorian Gazebo Assembly Instruction By Laser Dollhouse Designs.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
LHCb Radiation Shielding Wall – Lifting Tool Overview.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
The Pythagorean Theorem By Joel Zari. Step 1 First we start with two squares with sides a and b, respectively, placed side by side. The total area of.
PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
First Wall Panel - Overview
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
Ball Roller Coaster It will keep two balls busy rolling down the track over and over again.  The ULTRASONIC sensor tells the NXT when to use the lift motor.
TAXS and TAXN ABSORBERS - OVERVIEW
- CT INSTALLATION PROCEDURE OVERVIEW -
Present status of the flux return yoke design
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Plating the Gambia d Postage Stamp
INSTALLATION SEQUENCE
Assembly procedure – Inner Region
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
Installation step 4. (3 days)
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
First of all we will remind some numbers:
Step-by-step assembly instructions
Question & Suggestions March 17th
OT Survey & Adjustment Outline: Survey technique at present
Bulk Head (1) (1st Suspension Connection)
How to Use a Protractor.
Beam dump for J-Parc neutrino facility
The Victorian Gazebo II Assembly Instruction
Inner DET. Integration Inner detector envelope Radial clearances.
Neutron guide Shielding Concept
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Rack Placement Chopper Workshop
After service guide for changing PCB
Presentation transcript:

PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)

AIM OF THE ENDOSCOPY After the 2 nd ALARA Dry-Run on the 21 st of May, it was decided to investigate further: 1.State of Rail 2.Junction between 4 th and 5 th block 3.State and position of dump 4.Upper part of concrete blocks: lifting point?

BEAM DUMP SHIELDING ASSEMBLY Beam direction Concrete block: Rail (it expands all along the cavity) Cavity (side view): Lifting point 5370 mm (cavity length) Cavity (front view): Outer Ø = 960 mm Inner Ø = 300 mm

CONCRETE BLOCK 4 lifting point

RAIL

DUMP CORE 6

BEAM PIPE – DUMP CORE ASSEMBLY 7

RESULTS OF THE ENDOSCOPY 1.State of Rail → view under rail Insertion of endoscope: view under rail

RESULTS OF THE ENDOSCOPY 1.State of Rail → view under rail Conclusion: the rail is in one piece, in very good state and it reaches the end of the cavity End of the cavity

RESULTS OF THE ENDOSCOPY 1.State of Rail → view on top of the rail Insertion of endoscope: on top of the rail

RESULTS OF THE ENDOSCOPY 1.State of Rail → view under rail The technical drawings are accurate. The rollers are in good state. The technical drawings are accurate. The rollers are in good state.

RESULTS OF THE ENDOSCOPY 1.State of Rail Insertion of endoscope: between rail and concrete block Insertion of endoscope: between rail and concrete block The lower part of the cavity is in good state, as well as the side of the rail

RESULTS OF THE ENDOSCOPY 2.Junction between 4 th and 5 th block Insertion of endoscope: outside concrete block The outer part of the blocks is in good state and the 4 th and 5 th blocks are aligned Junction between blocks

RESULTS OF THE ENDOSCOPY 2.Junction between 4 th and 5 th block Insertion of endoscope: inside concrete block (left & right side) 5 th block inner Ø < 4 th block inner Ø Conclusion: the blocks are aligned outside but not inside 5 th block inner Ø < 4 th block inner Ø Conclusion: the blocks are aligned outside but not inside Junction between blocks, left side Junction between blocks, right side

RESULTS OF THE ENDOSCOPY The dump’s supporting balls are in good state, so are the cooling pipe connections End of cavity 3.State and position of dump Entrance of cavity

RESULTS OF THE ENDOSCOPY 3.State and position of dump Dump’s side Dump’s back side thermocouple water connections (cooling system)

RESULTS OF THE ENDOSCOPY 3.State and position of dump water connections (cooling system) The water connections are in good state

POSITION OF DUMP Nominal position of dump Actual position of dump Conclusion: the dump is rotated 60 ° counter-clockwise Actual layout Dump core Cooling pipes Supporting balls

RESULTS OF THE ENDOSCOPY 4.Upper part of concrete blocks Insertion of endoscope: upper part of 1 st concrete block lifting point?

RESULTS OF THE ENDOSCOPY 4.Upper part of concrete blocks: lifting point? Conclusion: the blocks have a lifting point in their upper part

CONCLUSIONS OF THE ENDOSCOPY 1.State of Rail 2.Junction between 4 th and 5 th block 3.State and position of dump 4.Upper part of concrete blocks: lifting point? Conclusion: the rail is in one piece, in very good state and it reaches the end of the cavity. The rollers are also in good state. The technical drawings are accurate. Conclusion: the blocks are aligned outside but not inside. 5 th block inner Ø < 4 th block inner Ø Conclusion: the dump’s supporting balls are in good state, so are the water connections. The dump is rotated 60° counter-clockwise. Conclusion: the dump’s supporting balls are in good state, so are the water connections. The dump is rotated 60° counter-clockwise. Conclusion: the blocks have a lifting point in their upper part The aim of the endoscopy was to investigate: