Mountain Ridge Project - winter presentation - AEC The making of Ridge University Engineering Building E ngineerMartha Del Campo, Stanford, CA A rchitectKatrin.

Slides:



Advertisements
Similar presentations
Pacific Team TEAM INTRODUCTION Pacific 2001 Crystal LangARCHITECT Robert WrightENGINEER Edgar LeenenCONSTRUCTION MANAGER Will Clift APPRENTICE Robert.
Advertisements

8621 Georgia Avenue Silver Spring, MD
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Skyscraper Construction
BIMception Proposal Thomas Villacampa Alexander Stough Christopher Russell Stephen Pfund.
Express Team University of New Mexico February 24, 2006.
Mountain Ridge Project - final presentation - AEC The making of Ridge University Engineering Building E ngineerMartha DelCampo, Stanford A rchitectKatrin.
Bay team’s Output Engineer Yang, Yao-Hung Construction Manager David Walthall Architect Cindy Chan.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
W a v e Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice.
TeamMembers Architect: Angela Ribas UC Berkeley Engineer: Matthias Niebling Bauhaus-University Weimar, Germany Construction Manager: Kevin Coyne Stanford.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
CENTRAL UNIVERISTY ARCHITECTUREJoy Liu, Cal-Berkeley ENGINEERINGNorm Faris, Stanford CONSTRUCTIONTim Kolaya, Georgia Tech OWNERAlex Barron, Stanford Engineering.
2001 Winter Presentation. Site Location Site View.
Pacific University Architecture Katie Kozarek EngineeringChristian Heimple ConstructionDebbie Sit ApprenticeChristina Cho OwnerPeter Demian School of Engineering.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
construction manager Kit Fleming engineer Peng Li architect Xiang Liu owner Hans Verheij Collaboration in Cyberspace E X P R E S S T E A M C.
Reading Structural Drawings
RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager ROXANNE ZOLIN.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Pacific Team Winter Quarter Presentation AMaria Zapata, Georgia Tech, Atlanta EAmir Kavousian, Stanford U, Stanford Xin.Zheng Lu, Tsinghua U, Beijing CKarthik.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Architect (K.U.) ADAM GUMOWSKI V p A c i e w Engineer (S.U.) JASON STONE C.M. (S.U.) BOB FARMAN Winter Quarter Presentation acific P niversity.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
AE Senior Thesis 2009 U.S. Pharmacopeia Headquarters Consolidation Rockville, MD Analysis and Design of a Mild Reinforced One way slab with Post Tensioned.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
The Mountain Ridge Team Mountain Ridge Team Final Presentation The Ridge University Engineering Building May 15, 1998 Architect: Humberto Cavallin Engineer:
Final Presentation of Bay Engineer Yang, Yao-Hung ConstructionManager David Walthall Architect Cindy Chan.
TeamMembers Team members of the Team members of the Angela Ribas
CONDOMINIUM TOWER & PARKING
Computer Integrated A/E/C
Lucas Pettinati Rafael Monzon Andreas Dinopoulos
Team Introduction Collaboration in Cyberspace
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
PACIFIC TEAM SPRING QUARTER PRESENTATION
The Mountain Ridge Team
Mountain Ridge Project
Mississippi Riverbank Project (Final Presentation) May 14, 1999
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Masonry Bearing Walls.
Presentation transcript:

Mountain Ridge Project - winter presentation - AEC The making of Ridge University Engineering Building E ngineerMartha Del Campo, Stanford, CA A rchitectKatrin Wender, Weimar, Germany O wnerRegina Pau, Sunnyvale, CA C onstruction Manager Kris Grotelueschen, Stanford, CA APP renticeGrace Yamamoto, Stanford, CA

Site conditions AEC

Functional spaces and relationship AEC

Dead Loads –Lightweight Concrete Slab: 55 psf –Steel Deck: 5 psf –Partition Walls: 20 psf –Finishes, Lights: 10 psf –Ducts, Pipes: 5 psf –Roofing System: 25 psf Live Loads –Offices: 50 psf –Classrooms: 40 psf –Auditorium: 50 psf –Corridors: 100 psf –Snow: 50 psf (Altitude~2500 ft.) AECAEC Gravity Loads

Sample Gravity Load Path AECAEC

Wind –Exposure B –V 33 = 70 mph Earthquake –Zone 3 –Type B Fault Zone Lateral Loads AECAEC

Sample Lateral Load Path AECAEC

Soil –Stiff Sand –Bearing Capacity: 5 ksf –Low settlement –Frost Depth: 4 ft. Foundation –Wall footings at perimeter –Column footings under interior columns –Slab on Grade Foundation Considerations AECAEC

Construction AEC Budget is reduced for 4% inflation over the next 14 years. (2015 Budget = 2001 Budget x ) The money available for the building is further reduced by overhead and profit.

Redesign - design concept AEC “soft fluid among stones – water among stones“

AEC Redesign - schematic layout

AEC

Redesign - schematic layout AEC

Redesign - circulation

AECAEC Redesign - Structure

AECAEC Original DesignRedesign Perimeter frame with staggered truss Retain Exterior bracingRetain King-post truss over Auditorium Retain Shear Wall corePropose braced frame core Add basement for gymnasium

Eccentrically Braced Frame –Efficient, ductile system –Eliminates need to coordinate concrete and steel workers Shear Wall –Ductile in combination with frame system –Traditional, widely used –Less expensive in general AECAEC Redesign - Structure

Redesign - Construction AEC Foundations Complete 7/1/15 Superstructure Complete 10/14/15 Building Closed In 1/6/16 Finishes Complete 5/25/16

Redesign - Construction AEC Total Budget: $2,842,260 Breakdown of Costs:

Redesign - Construction AEC Largest crane pick is a 3 kip column Hydraulic excavator for basement Concrete will be placed with a pump Construction Equipment

Redesign - Construction AEC Material Laydown Site Office Sub Trailers Site Parking Additional Material Area Site Entrance Moving Crane Direction of Progression

Alternative 2 - design concept AEC “water among stone – water on the mountain”

AEC 213 Alternative 2 – schematic layout

Alternative 2 - circulation AEC 123

Alternative 2 – exterior and interior

AECAEC Alternative 2 - Structure

AECAEC Concept –Maximize floor-to- ceiling height Thin slab on columns Eliminate internal beams –Reduce finishing costs –Allow large windows APP E E C C Alternative 2 - Structure

Drop panel Slab Column AECAEC Gravity System –Flat Slab System Minimum allowable depth: 7 in. (probably greater) –Post-tensioned slab Approximate depth: 8 in. –Waffle slab over Auditorium Approximate total depth: 24.5 in. (4.5 in. top slab) 30” x 30” voids, 36” Alternative 2 - Structure

AECAEC Lateral Load Systems –Concrete Cast in Place SMRF –Precast Concrete SMRF –Shear Wall for redundancy Typical Member Sizes: Ext. Beam: 18x24 in. Ext. Column: 18x18 in. Int. Column: 12x12 in. Alternative 2 - Structure

AECAEC Sample Connection Details –Cast in Place SMRF –Precast sMRF (from pankow.com) Alternative 2 - Structure mild steel bars post-tensioning

Exterior Cladding –Finished concrete (CIP or Precast) Saves material cost Concrete must be designed for thermal effects –Precast stone cladding Adds cost for material and installation Lightweight materials Lower life-cycle costs (i.e. insulation) AECAEC Alternative 2 - Structure

Roofing System and Skylight AECAEC Alternative 2 - Structure Wood truss with steel tension members

Alternative 2 - Construction AEC Foundations Complete 6/24/15 Superstructure Complete 9/23/15 Finishes Complete 6/1/16 Building Closed in 12/16/15

Alternative 2 - Construction AEC Total Budget: $2,732,912 Breakdown of Costs:

Alternative 2 - Construction AEC Largest crane pick for bucket of concrete Hydraulic excavator for foundations Concrete will be placed with a bucket Construction Equipment

Alternative 2 - Construction AEC Material Laydown Site Office Sub Trailers Site Parking Additional Material Area Site Entrance Moving Crane Direction of Progress

Alternative 3 - design concept AEC “water among stones – waterfall and rocks“

AEC Alternative 3 – schematic layout

AEC Alternative 3 – schematic layout

AEC Alternative 3 – schematic layout

Alternative 3 - circulation AEC

AECAEC Alternative 3 - Structure

AECAEC A/E Interaction Alternative 3 - Interaction E Change Concept A ProposalE Proposal A Feedback Design

AECAEC Lateral Load Systems –Steel EBF Core –Concrete Shear Wall Core Gravity Load Systems –Concrete Frame –Steel Frame –Composite floor slab Steel: Typical Column: W14 x 74 Worst-Case Beam: W18 x 60 Concrete: Typical Column: 18” x 18” Worst-Case Beam: 18” x 30” Alternative 3 - Structure

Details AECAEC Alternative 3 - Structure Steel: Concrete:

Alternative 3 - Construction AEC Foundations Complete 6/18/15 Superstructure Complete 9/11/15 Building Closed In 12/10/15 Finishes Complete 5/12/16

Alternative 3 - Construction AEC Total Budget: $3,447,825 Breakdown of Costs:

Alternative 3 - Construction AEC Largest crane pick for 3.5 kip steel column Hydraulic excavator for foundations Concrete will be placed with a pump at the foundations, and shotcrete for the shear walls Construction Equipment

Alternative 3 - Construction AEC Material Laydown Site Office Sub Trailers Site Parking Additional Material Area Site Entrance Moving Crane Direction of Progress

Construction AEC

Final Decision Matrix A E C Benefits Draw - backs Design like last years Public space areas Lack of daylight Only one entrance Owner’s choice 2 Entrances Privacy/security req. good Concrete system Straightforward structure No extended footprint Efficient structural Concrete shear core Fun spiral stairs Concrete frame & slab better MEP & floor depth Not risky for A Roof truss & MEP intake Stream threats Skylight leaking Extended footprint Deep floor beams & MEP Lack of vertical mechanical path space $2.8 Million 5/25/16 $2.7 Million 6/01/16 $3.4 Million 5/12/16

Design Process timeline Week 1-3Week 4-6Week 7-8Week 9-10 A Understand program, discussion Redesign, consult E Initial Alt3 concepts, form idea Completion A proposal E Collecting general information Redesign & A Alt2, consulting mentors & C Alt3 & talking with A C Collecting general information & mentors Quantities & materials Quantities, materials (AE), schedule & mentors Schedule & Equipment & mentors APP confusion Decide on Alt2 Archit. Consult A Design basics and consult AEC Asking and adjusting

Team Interaction- Clerestory Windows AEC Narrow Hallways ECEC APP E C $$$ A APP A C E OK Concept!

Lessons Learned/ Future Improvements AEC Lessons:Improvements: Clarified discipline goals and roles in design, how disciplines respond to information Skill recognition Clear, straightforward, proactive synchronous and asynchronous communication Organizing information for documentation (i.e., web site) Working with technology More thorough use of communication resources (i.e, Recall) More efficient presentation of ideas Better online documentation of information and process

Final choice - challenges AEC architecture: some interesting questions still open - facades ? - roof garden ? - spiral stairs engineer: Concrete system Atrium skylight MEP space construction manager: Reduce budget through continued value engineering Integration of mechanical systems into current architecture Use of shotcrete for shear walls System for glass roof area team interaction: Value enginering for budget