New Offshore Wind Tenders in Denmark 1,450 MW before 2020.

Slides:



Advertisements
Similar presentations
Call for tenders for Horns Rev 3 and Kriegers Flak
Advertisements

Iceland and the European offshore electricity grid
Completing the EU internal energy market IFIEC, 22 November 2011
LEAVING A POSITIVE LEGACY. Future generations of Vermonters will benefit. Choosing clean energy sources, like wind, is the responsible thing to do. As.
Danish wind power plans by 2030 Outi Kartano Janne Tuunanen.
NER300 Offshore Wind Project Nordsee One (formerly Innogy Nordsee 1)
Renewable Energy Program in Jordan
Optimising Site Investigations for Offshore Wind Farm Projects Mark Finch Geotechnical Engineering Manager Hydrosearch Associates, Aberdeen UK Offshore.
Ilinca Julian, Heikki Ojanen, Juha - Matti Lukkari.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Show guidelines, which are useful when placing elements and photos: 1. Rightclick on the slide and choose ’Grid and Guides’ 2. Check ’Display drawing guides.
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
Regional consultations & Implementation Plans Gert Proba Rostock Business Dr. Kristina Koebe Rotorwerk.
A review of offshore wind power grid connection options in the Bothnian Bay Offshore grids for wind power integration Sisu Niskanen VTT Technical Research.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
1 LNI & JMJ, SmartGrid 2nd General Assembly Danish TSO Research and Demonstration Activities towards a Future Smart grid EcoGrid Energinet.dk, PMFU section.
RETHINKING THE ELECTRICITY GRID RETHINKING THE ELECTRICITY GRID 14 May 2012 Presented by: PATRICIA DE SUZZONI ADVISOR TO THE CHAIR OF CRE (French Energy.
Claire Gibson, Wave Hub General Manager 19 February 2013
1 Energy Sector Development in Montenegro: reforms, goals and overall strategy Government of Montenegro Ministry of Economy 6 November 2009, Podgorica.
Deploying marine renewable energy in the EU A Celtic perspective on interconnection Adam Bruce Global Head of Corporate Affairs, Mainstream Renewable Power.
Vestas.com How Can Offshore Wind Contribute To The European Energy Portfolio? Uffe Vinther Schou, Sales Director, Vestas Offshore A/S.
Renewable Energy Technology Deployment and Danish Experiences Senior Policy Advisor Annette Schou.
1 | A Greener Economy | Göran Loman | Offshore Wind Energy Kentish Flats Extension Göran Loman Environment Conference, Canterbury A Greener.
Antje Orths - EWEC 2007, Milano, Italy Experience with Voltage Control From Large Offshore Windfarms for Transmission Systems Vladislav Akhmatov.
Part-financed by the European Union (European Regional Development Fund) Model case Pomeranian Bight Pilot / Arkona Basin Combined Grid Solution and Baltic.
Potential hazards and risks in the offshore wind park development process in Poland Stefan Simon, CEO Green Energy World.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
The most recent energy projection from the Danish Energy Authority Morten Werner February 6th, 2008.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Dr. Ion LUNGU AFEER President. DRIVERS FOR INVESTMENTS Demand; Fuel availability; Market signals; Production costs; Energy mix; Environmental concerns;
EUROPE’S ENERGY EXPORTER Neart na Mara. source EWEA.
Presentation by Greta Monika Tuckute
German Offshore Wind Strategy1 German Policies on Offshore Wind Energy Cornelia Viertl / Jens Bömer Division KI I 3 / Hydropower and Wind Energy.
A Nordic Example “The Development of Wind Power in Denmark” Presented by Jørgen K. Lemming Risø DTU.
Future European issues on off-shore wind power deployment Steffen Nielsen Head of Section Danish Energy Authority Ministry of Transport and Energy European.
Regions for Economic Change Conference, Brussels, 7-8 March 07 The POWER project: Creating a North Sea Competence Network for Offshore.
Status of the German Wind Energy Market and Prospects for the Future Claudia Grotz German WindEnergy Association (BWE) EWEC 2007 in Milan, Italy.
Where next? Gordon Shearer BWEA Board Member for Offshore Wind.
Kriegers Flak Offshore development in three different countries - lessons learned and progress expected.
Information and communicationDirectorate-General for Energy and Transport European Commission Security of Electricity Supply in the EU Stefan Gewaltig.
Riga 4th December 2008 Renewable energy: is there a Latvian masterplan? Ieva Indriksone Riga Graduate School of Law.
Regulatory and development framework: the key role of TSO cooperation Sopot, November 28 th, 2011 Hervé MIGNON RTE (France)
Floating Offshore Wind Turbines Floating Offshore Wind Turbines An Aeromechanic Study on the Performance, Loading, and the Near Wake Characteristics of.
Wind Energy in Denmark Industry and framework Camilla Holbech, Senior Policy Adviser Danish Wind Industry Association.
| faculty of law groningen centre of energy law The role of law in regulating offshore energy production and securing energy supply Hannah.
European Wind Energy Conference & Exhibition May 2007, Milan 1 Jens Bömer Consultant for International Aspects of Wind Energy on behalf of the Federal.
| faculty of law groningen centre of energy law The role of law in regulating offshore energy production and securing energy supply Hannah.
North Coast Wind Farm Tolano Environmental Consulting.
Energy System Investment Models Paul Rowley & Simon Watson CREST Loughborough University.
Horns Rev 3 When opportunity knocks… Mattias Sjöberg Project Director, Horns Rev 3 Project Management Summit December 2 nd, 2015.
11 Measures to support high- efficiency district heating and cogeneration Anders Hasselager Senior Policy Advisor Kiev, 19 May 2016.
Berkshire Wind: Joint Action By Communities with Common Goals Presented by: David Tuohey, Director of Communications & External Affairs Massachusetts Municipal.
Towards 100% RE in Denmark in 2050 Jakob Jespersen Danish Energy Agency Hai Phong, 17 December 2013 – the role of wind energy.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Offshore Wind industry analysis research and trends report for :
Operation of power systems with high shares of wind power
Bringing Offshore Wind to New England’s Shore Restructuring Roundtable
HYDROELECTRIC CORPORATION
Bringing Off-Shore Wind to New England's Shores
North sea wind power hub
Overview on Renewable energy in Bulgaria
Danish experiences on integration of wind power
The ISLES Project Bob Hanna
Introduction Anders Plejdrup Houmøller Houmoller Consulting ApS
Grid integration and stability of 600MW windfarm at Kriegers Flak
Copenhagen Strategy European Policy Seminar on Off-shore Wind Power
Energy Strategy Center of Scientific Research Institute of Energy
Ireland’s Offshore Wind
Grid Connection of the Anholt offshore Windfarm
Presentation transcript:

New Offshore Wind Tenders in Denmark 1,450 MW before 2020

New Offshore Wind Tenders in Denmark Presentation today Danish ambitions on future offshore wind power Lisbeth Nielsen Danish Energy Agency Two new offshore tenders: 400 MW at Horns Rev and 600 MW at Kriegers Flak Peter Sehestedt Danish Energy Agency Tender of 450 MW nearshore projects Tone Madsen Danish Energy Agency Pre-investigations and grid connection Betina Haugaard Heron Energinet.dk

New Offshore Wind Tenders in Denmark Denmarks’ ambitious green energy policy Ambitious green energy policy: long-term goal for 2050 – independence of fossil fuels Stable regulatory framework to 2020 Offshore wind broad political support – 95 % of the Danish Parliament Effects in percent of our electricity consumption from wind power

New Offshore Wind Tenders in Denmark New Offshore Wind projects in Denmark Horns Rev 3: 400 MW Kriegers Flak: 600 MW Tender for 450 MW near shore wind farms 50 MW turbines for research and development

New Offshore Wind Tenders in Denmark Preparing for the future

New Offshore Wind Tenders in Denmark The Danish offshore approach Planning and pre-investigations Predictable income DEA is one stop shop Grid connection – large scale and near shore A track record of political stability No requirement for local content Transparent and flexible tender process

New Offshore Wind Tenders in Denmark Integration of wind power Strong interconnectors A well functioning international market for electricity Flexible electricity consumption

New Offshore Wind Tenders in Denmark Horns Rev 3 and Kriegers Flak The sites chosen for tender ranked the highest in the economic ranking The most attractive sites Horns Rev 3 Kriegers Flak

New Offshore Wind Tenders in Denmark Horns Rev MW in the North Sea Denmark's 14th offshore wind farm Local competences and network of suppliers North Sea has good wind conditions Sea depths of less than 20 metres

New Offshore Wind Tenders in Denmark Kriegers Flak 600 MW in the Baltic Sea Denmark's largest offshore wind farm Located in the Baltic Sea close to borders of Sweden and Germany Will also be linked to the German farm - power can be led to both countries Good wind conditions Kriegers Flak

New Offshore Wind Tenders in Denmark We are transparent Tendering for Horns Rev 3 and Kriegers Flak: Dialogue and negotiation

New Offshore Wind Tenders in Denmark Common timeline both projects 2013 February to April 2013 Pre-technical dialogue From May 2013 Technical dialogue

New Offshore Wind Tenders in Denmark From May: Technical dialogue February to April: Pre-technical dialogue September 2013 Contract notice Horns Rev 3 timeline … November 2013 Deadline for prequalification 2 September 2014 Deadline for preliminary tenders 1 December 2014 Deadline for binding tenders Early 2015 Concession contract and construction permit From 1 January 2017 Guaranteed connection to the grid Early 2020 Full operation of offshore farm

New Offshore Wind Tenders in Denmark 29 November 2013 Deadline for pre-qualification September 2013 Contract notice 2 September 2014 Deadline for preliminary tenders 1 December 2014 Deadline for binding tenders Early 2015 Concession contract and construction permit From 1 January 2017 Guaranteed connection to the grid Early 2020 Full operation of offshore farm From May: Technical dialogue February to April: Pre-technical dialogue Horns Rev 3 timeline …

New Offshore Wind Tenders in Denmark From May: Technical dialogue February to April: Pre-technical dialogue February 2014 Contract notice 29 April 2015 Deadline for preliminary tenders 31 August 2015 Deadline for binding tenders From 1 July 2018 Guaranteed connection to the grid Early 2020 Full operation of offshore farm Kriegers Flak timeline … April 2014 Prequalification September/October 2015 Concession contract and construction permit

New Offshore Wind Tenders in Denmark 29 April 2014 Prequalification February 2014 Contract notice 29 April 2015 Deadline for preliminary tenders 31 August 2015 Deadline for binding tenders September/October 2015 Concession contract and construction permit From 1 July 2018 Guaranteed connection to the grid Early 2020 Full operation of offshore farm From May: Technical dialogue February to April: Pre-technical dialogue Kriegers Flak timeline …

New Offshore Wind Tenders in Denmark Nearshore wind projects Smålandsfarvandet North Sea (north) North Sea (south) Sæby Sejerøbugten Bornholm Total of 450 MW Each farm max. 200 MW

New Offshore Wind Tenders in Denmark Nearshore wind projects The tendering model will be published this year Dialogue and negotiation Call for tenders September 2015 Pre-investigations: Geological, EIA and MetOcean Grid connection Local joint ownership

New Offshore Wind Tenders in Denmark The Danish TSO - Energinet.dk Independent public enterprise – owns and operates highways of energy (electricity and gas) Energinet.dk is to ensure security of supply Our finances must break even – non-profit We develop a more flexible power system

New Offshore Wind Tenders in Denmark Roles of Energinet.dk in OWF Finance, construct and operate platform and sea cable Bringing power from new OWF ashore and strengthen grid Secure that grid connection is available in due time During the last year requested by DEA to conduct pre- investigations and EIA for future offshore wind farms

New Offshore Wind Tenders in Denmark Investigations conducted until now - Horns Rev 3 and Kriegers Flak UXO-deskstudy (Unexploded Ordnance on/below seabed) Geophysical investigations in wind farm areas Geotechnical tender EIA-surveys initiated

New Offshore Wind Tenders in Denmark App. 190 km 2 pre-investigation area Horns Rev 3

New Offshore Wind Tenders in Denmark Horns Rev 3 project facts Distance to shore10 – 30 km Distance to harbour25 – 55 km Mean wind speed9.8 m/s Water depth10 – 20 m SeabottomSand TideYes, 1 – 2 meter

New Offshore Wind Tenders in Denmark App. 250 km 2 pre-investigation area Kriegers Flak 110 km 2 69 km 2

New Offshore Wind Tenders in Denmark Kriegers Flak project facts Distance to shore15 km from Møn Distance to harbour20 – 40 km Mean wind speed9.5 m/s Water depth15 – 30 m Seabottom Sand and residual sediments (from moraine/till deposits) – risk of boulders TideNo

New Offshore Wind Tenders in Denmark Grid Connections Energinet.dk establish the offshore platform, the sub-sea cable and the onshore grid connections The developer is responsible for inter-array cabling in the OWF and connecting to the platforms OWF will be connected to the platforms at 33 or 66kV Expenses of Energinet.dk is paid by Danish consumers; not the developer/owner of the OWF’s Construction of the platforms will be initiated in 2014 and finalized in 2016/2018

New Offshore Wind Tenders in Denmark Upcoming events Follow updated information at Kick-off meeting for the tendering process May 2013 Technical information meeting in Copenhagen 27th of February 2013

New Offshore Wind Tenders in Denmark You can find us at the Danish pavilion 1,450 MW before 2020