1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Magnet Production Status Satoshi Ozaki, Manager, SR Magnet Production 9 th ASAC Meeting for the NSLS-II Project.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Insertion Device Toshi Tanabe, ID group leader 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
Advertisements

EMMA Magnet Design Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Vibrating Wire R&D for Magnet Alignment Animesh Jain, NSLS-II Project The alignment tolerance for a string of magnets.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Electrical Issues John Escallier, NSLS-II Project To achieve high quality electrical characteristics for storage.
Magnets for the ESRF upgrade phase II
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Mechanical Engineering Issues Sushil Sharma, NSLS-II Project The NSLS-II storage ring requires multipoles and.
BROOKHAVEN SCIENCE ASSOCIATES ASAC Review of the NSLS II Project, October , Status of the NSLS II Storage Ring Magnets Prepared by John Skaritka.
1 BROOKHAVEN SCIENCE ASSOCIATES SR Magnet Status Satoshi Ozaki, Manager, SR Magnet Production 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
BROOKHAVEN SCIENCE ASSOCIATES ASAC Review of NSLS-II Project March 26-27, Status of the SR Lattice Magnets for the NSLS II John Skaritka Magnet.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 BROOKHAVEN SCIENCE ASSOCIATES Production of Vacuum Components H.C. Hseuh NSLS-II ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
Alignment and Beam Stability
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Daniel Schoerling TE-MSC-MNC 1 Magnets Daniel Schoerling on behalf of WP 2.2 and WP 2.16 ELENA Project Review 14 th – 15 th October IT.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Lecture 5 Jack Tanabe Old Dominion University Hampton, VA January 2011 [1] Halbach, K., FIRST ORDER PERTURBATION EFFECTS IN IRON-DOMINATED TWO- DIMENSIONAL.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Magnet Design & Construction for EMMA
MBA Magnets MultiBend Achromat Magnets 9/27/2013 Review By Mark Jaski.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Correctors magnets V. Zubko, IHEP, Protvino SIS 300 Pre-consortium Meeting Thursday 19 March 2009, Protvino.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
Phobos Magnet Status Leslie Rosenberg & Patrick Decowski, MIT Technical Advisory Committee November 1998.
Warm-Cold Changes in the Sextupole Harmonic in the Quadrupole Magnets for the BEPC-II Luminosity Upgrade Animesh Jain Brookhaven National Laboratory Upton,
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
ELENA installation progress F. Butin / ELENA collaboration.
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Iranian Light Source Facility, IPM, P.O. Box , Tehran, Iran
Some Design Considerations and R &D of CEPCB Dipole Magnet
High Gradient Magnet Design for SPring-8 Upgrade Plan
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
The design schemes of the low field dipole magnets
Magnets for the ESRF upgrade phase II
Compact and Low Consumption Magnet Design The DESY Experience
ELENA Magnet Installation Planning
High Precision Magnet Production for NSLSII at IHEP
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
ESS MEBT Quadrupole magnets
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Electron Collider Ring Magnets Preliminary Summary
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Magnet Production Status Satoshi Ozaki, Manager, SR Magnet Production 9 th ASAC Meeting for the NSLS-II Project February 1-2, 2012

2 BROOKHAVEN SCIENCE ASSOCIATES Contents Comparison with the conclusions from the last ASAC Meeting in May 2011 Magnet production status Multipole Magnet Production: Status and Trend Analysis of Magnet Quality Dipole Magnet Production: Resolution of Difficulties, and Production Status Correctors: Production Status and the Skew Corrector Issues Lessons Learned Workshop Summary and Conclusions SR Magnet Procurement Technical Representatives: Sushil SharmaBINP (Russia) John SkaritkaIHEP (Beijing, China) Lewis DoomDanfysik (Denmark) Charles SpataroTesla Engineering (United Kingdom) Frank DePaolaBuckley Systems Inc (New Zealand) George RakowskyEverson/Tesla (USA)

3 BROOKHAVEN SCIENCE ASSOCIATES SR Magnets (Types and Numbers) Mgt TypeCodeDescriptionPart No.MakerQuantity QuadrupoleType ASingle-coil, Short & Wide9801BINP30 Type BSingle-coil, Short & Narrow9802BINP30 Type CDouble-coil, Long & Narrow9804BINP30 Type C'Same as above, with Cutout9807BINP30 Type DDouble-coil, Short & Narrow9809Tesla90 Type EDouble-coil, Short & Wide9812Tesla30 Type FLarge Aperture, Short & Narrow9815BSL60 Sub Total300 SextupoleType ASingle-coil, Short & NarrowS-9801Danfysik150 Type BSingle-coil, Short & wideS-9802IHEP75 Type CLarge Aperture, Short & Wide9816BSL30 Sub Total255 DipoleType ADipol-35 mm3500BSL54 Type BDipole 90 mm9000BSL6 Sub Total60 CorrectorType ACorr-100 mm1000Everson90 Type BCorr-100 mm with Skew Quard1001Everson30 Type CCorr-156 mm1560Everson60 Type FCorr-Fast2002/3SHI90 Sub Total270 Total16 Types885

4 BROOKHAVEN SCIENCE ASSOCIATES Multipole Magnet Production The last ASAC Meeting took place when the technical difficulties with the magnet suppliers were just about resolved, and entering into the production phase with all but a few of the manufacturers. At that time, I summarized the situation as: Our supplier can build acceptable multipole magnets, and multipole magnet productions are either in progress or about to begin. Although some of the manufactures, Danfysik, Everson, and possibly BINP are already in a routine production, a few more months of ramp-up time is anticipated for others to reach a routine production and delivery stage. Since then, good progress has been made with all of the suppliers, and in some cases, the series production is coming close to an end.

5 BROOKHAVEN SCIENCE ASSOCIATES Delivery for the NSLS-II Multipole Magnets In total, just about one half of the multipole magnets have been already delivered to BNL.

6 BROOKHAVEN SCIENCE ASSOCIATES Statistics of Multipole Magnets Evaluation Based on the Measurements at BNL Most of the magnets delivered have passed incoming inspections, which include a visual inspection for any damage, some dimensional checks, water flow in leak tightness checks and high-potting, but some required work such as re-hanging of coils to ensure the vacuum chamber clearance, re-work on the water manifold, etc. The sampling rate for the in-house field measurements depends on our confidence in the suppliers capability from the accumulated experiences. The measurement included the magnetic field harmonics and check of their reproducibility after the re- assembly of the magnet yoke. Most of magnets perform very well with all or most of the harmonics of the field quality within the specification. Those which are outside of the specifications, were discussed with the Accelerator Physics Representative for the acceptance of the magnets for the girder assembly. Some examples of the integrated magnetic field strength of a series of magnets, and harmonics as a function of the excitation current, both as measured at BNL, together with the harmonics specifications and expected operating range (the red box) are shown in a number of slides which follows. The entire data on integrated field strength and harmonics that is available to date can be found in the Web site for this presentation.

7 BROOKHAVEN SCIENCE ASSOCIATES Summary for Sextupoles Danfysik (9801): 43 magnets have been measured The integrated strength variation within the series is less than 0.5% A few magnets have large a4, b4, a5, b5, b6 which are slightly out of spec The remaining harmonics are good for all the magnets IHEP (9802): 16 magnets have been measured The strength variation is ~1%. a4, b4, a5, b5 and b7 are the main issues, especially b5 and b7 The field harmonics of IHEP sextupoles appear to be more widely spread than that of Danfysik and are more susceptible to the torques applied to the assembly bolts than others Buckley (9816): 11 magnets have been measured The strength variation is ~1.4% There are systematic shifts in the a11 and b11harmonics but are deemed to be acceptable for a small number of magnets

8 BROOKHAVEN SCIENCE ASSOCIATES The Sextupoles Strength Comparison The sextupoles from two vendors will be powered by one circuit is stronger than 9801 by about 1%. 1% IHEP Danfysik

9 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of Danfysik Sextupoles (9801) Box indicating harmonics tolerance and tuning range

10 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of Danfysik Sextupoles (9801)

11 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of IHEP Sextupoles (9802)

12 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of IHEP Sextupoles (9802)

13 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of Buckley Sextupoles (9816)

14 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of Buckley Sextupoles (9816)

15 BROOKHAVEN SCIENCE ASSOCIATES Summary for Quadrupoles Quadrupoles are individually powered, and therefore, the variation in the integrated field strength is a matter of little concern. BINP: 51 of their magnets in 4 different types have been measured They all show good field quality, and meet the specifications Tesla: 9 magnets have been measured Most of the harmonics data are good but there are difficulties with the systematic shift in the b6 harmonics, which most likely arises from the pole chamfer size and is correctable Buckley: 21 magnets have been measured In general, the harmonics look good, but have some problems with the a5 and a6 harmonics, which are deemed to be acceptable for a small number of magnets

16 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of BINP Quadrupoles (9801)

17 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of BINP Quadrupoles (9801)

18 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of Tesla Quadrupoles (9809)

19 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of Tesla Quadrupoles (9809)

20 BROOKHAVEN SCIENCE ASSOCIATES Harmonics of Buckley Quadrupoles (9815)

21 BROOKHAVEN SCIENCE ASSOCIATES Tesla Quadrupole Production: Concerns Tesla Engineering reached a routine manufacturing state only in mid-December, 2011, and produced 10 quadrupoles during January Considering that this was right after the holiday vacation period, and at the beginning of the series production, with a reasonable learning curve, we expect that they can reach a required rate of production in the coming months. The back-up for the Tesla quadrupole production is BINP, which has a contract with us to build seven first articles of Tesla type quadrupoles with an option to build additional quintiles (e.g. 30 magnets). Due to the fact that the BINP quadrupoles have the poles narrower than that of Tesla’s, this back-up quadrupole is longer by a few cm than that of Tesla, in order to achieve similar integrated gradient strength. This led the Accelerator Physics requirement that these quadrupoles not to be mixed arbitrarily with the Tesla quadrupoles, giving a constraint to the number of magnets of each type to install. The proper timing for exercising this option is approaching, if the delivery of the back-up magnets are to be completed by late summer of Incidentally, the option of 30 quadrupoles from BINP will cost ~$730K. We will carefully monitor the progress at Tesla for the next several weeks, and make a decision on this option before the end of February 2012.

22 BROOKHAVEN SCIENCE ASSOCIATES Dipole Magnet Production The difficulty Buckley Systems, Inc. had with the bonding of the 35 mm dipole yoke was overcome by building a new jig that is much stronger and sturdier, and with more than twice as many tie rods to apply higher bonding pressure more uniformly over the laminations. Since the dipoles will be mounted on their own girder, their assembly and alignment on the girders is simple. In fact, the dipoles will be delivered directly to the ring building, where the incoming inspection, assembly, alignment will take place before being installed in the tunnel. This permits us to allow the last delivery of the dipoles to be delayed until the end of 2012 or early The field quality of the dipoles, both the 35mm gap and the 90mm gap types, are acceptable, and the integrated vertical fields of the dipoles are uniform within the required tolerance.

23 BROOKHAVEN SCIENCE ASSOCIATES The 90 mm dipole stacking and bonding jig was designed to work on the 35 mm dipole also. The mutual understanding between Buckley Systems, Inc. and the NSLS-II Project, is that the monthly production rate of the 35 mm dipoles will be enhanced from four to five per month, or more aggressively from four to six per month, the latter depending on the Buckley’s own V100 Machining Center. Delivery for the NSLS-II Dipole Magnets

24 BROOKHAVEN SCIENCE ASSOCIATES Delivery for the NSLS-II Corrector Magnets Production of the X/Y Correctors, both the 100 mm and the 156 mm length is coming to an end with an expectation that the delivery of the last magnet will be at the end of January Production of the Correctors with skew corrections coils is presently on hold as described in the nest slide.

25 BROOKHAVEN SCIENCE ASSOCIATES Skew Corrector Magnet Issue During the last summer, it was discovered that there is a very large a4 (skew octupole) term generated by the skew quadrupole coil assembly that will be mounted on 30 of the 100 mm X/Y Correctors. Re-design of the skew coil assembly is complete and the contract modification will be made soon. A prototype of the new design will be available in six weeks after the contract modification is signed and the production of the new skew corrector coils will follow soon after.

26 BROOKHAVEN SCIENCE ASSOCIATES Fast Correctors Integrated Air-core X&Y Coil Pair Assembly Orthogonality tolerance:  15 mrad Max. horizontal bending angle: 14  rad Max. vertical bending angle: 15  rad Max. phase shift without vacuum kHz: 5  Max. phase shift with vacuum kHz: 5  *: Vacuum chamber Pipe material: Inconel 625 Flange material: Type 304L or 316L Stainless Steel A contract negotiation is in progress with a local manufacturer “Sag Harbor Industries” for production of 90 units. The Fast Corrector will be mounted on the vacuum chamber near its flange after the girder assembly and alignment are completed.

27 BROOKHAVEN SCIENCE ASSOCIATES The SR Magnet Production at a Glance January 13, 2012 > 50% Received

28 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II SR Magnet Production Workshop One of the action items from the last DOE Review of the NSLS-II Project, was to produce a document for the lessons learned in the procurement and manufacturing of the SR Magnets from the industries. In order to collect the information from all of those involved, a workshop is being organized and is scheduled to be held on April 11 – 13, In addition to those NSLS-II Staff members, we intend to invite the magnet suppliers and other interested parties if they wish to participate in this workshop at their own expense.

29 BROOKHAVEN SCIENCE ASSOCIATES Summary and Conclusions Good progress has been made since last May As of today, a little more than half of the magnets have already been delivered to BNL The mix of multipole magnets being delivered is in general satisfactory to support the two-girders per week assembly rate that will be later discussed by Lewis Doom Although not all of the magnets received from our suppliers are perfect, their quality, by and large, is acceptable for the NSLS-II’s precision storage ring With the current agreed upon delivery schedule, even with the delivery of the last 35mm dipoles in March 2013, the SR Magnet deliveries should not impact the commissioning schedule Never-the-less, continued close monitoring of the suppliers is imperative for the timely completion of this job, particularly at Tesla