Demonstration Criteria and Logistics Teledyne Isco Confidential 1.

Slides:



Advertisements
Similar presentations
10 Golden Questions for Concept Exploration & Development Dr. Dan C. Surber (317)
Advertisements

Distribution. Functions and forms.
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Chapter 12 Global Marketing Channels and Physical Distribution
To navigate through this Tutorial use your mouse, or Page Up key or Page Down key Registration Tour Unlock the “POWER” of v8.0.
©Railinc 2010 All Rights Reserved Weston Parkway, Suite 200, Cary, NC – Industry Initiatives: What is Railinc.
EQUIPMENT VALIDATION.
CombiFlash® a Name You Can Rely On
Froland Transportation, Inc. Established in 1991.
WATTSTOR Limited Inaugural Shareholders Meeting Friday 10 th October 2014.
Chapter 12 Global Marketing Channels and Physical Distribution
Additions to the Price Paid. Content Price Paid or Payable Additions Additions - Category 1 Additions - Brokerage Expenses Additions - Commissions Commissions/Buying.
Entrepreneurship: Ideas in Action 5e © 2011 Cengage Learning. All rights reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
WAREHOUSE MANAGEMENT Industrial Logistics (BPT 3123)
RediSep Columns and Column Plans Teledyne Isco Confidential 1.
Automobile Enthusiasts Database System May 7, 2003.
DCMS DEMO 1. Agenda 2 Inbound Processes Outbound Processes Security Manager Questions & Answers.
Effective Methods for Software and Systems Integration
Consumer Protection. Testing Quantitative Test ( measurable) Qualitative Testing (opinions) Sensory Testing (opinions)
CONFIDENTIAL © 2009 Cymer, Inc. IBP – GTS Product Catalog – Understanding Information Provided Marcus Osibov
Protection Detail: Insurance Coverage in 2012 Presented By: Nezih Hasanoglu and Kim Singleton M3 Insurance Solutions for Business.
Introduction to Usability By : Sumathie Sundaresan.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Dtengineering 1 of 16 The Product Development Process Introduction.
From Research Prototype to Production
A PC-based Planning System Reports and Functionality AutoScheduler Copyright © 2002.
Visit us at E mail: Tele:
Memex Sales Model Qualification Demo Preparation Project Team Demonstration Order Budget Dollars? Need? Authorized Project? Willingness to Proceed? Products.
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Packaging Program Responsibilities Control No. PKG-001.
1 Chapter 4 Instructor Shan A. Garib, Winter 2013.
Replacement Parts Pros How to…Order Products Home Page: Displays the different categories of product Drop down menu lists the.
ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013.
COMP5047 Pervasive Computing: 2012 Think-aloud usability experiments or concurrent verbal accounts Judy Kay CHAI: Computer human adapted interaction research.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
PRIMARY MARKET RESEARCH Rehabilitation Engineering Research Center on Technology Transfer Training Module #4.
INTERNATIONAL MARKETING Gizem KILIÇ Industrial Engineering Department, Dokuz Eylül University, Turkey.
SBTeach Introduction School of Business Course Coordination System.
1 MRL Assist Tool Website Access the MRL Assist Tool at
1 PVDI personal vehicle diagnostic interpreter Grandma Photo courtesy of Getty Images.
Michael Milgramm, CEO/CTO Donald Kovalevich, President John Fricke, VP Business Development IdentaZone, Inc © Copyright 2012 IdentaZone provides a multi-layer.
Confidential Web Ordering Overview. Confidential LOG ON:   Enter your login name &
1 New Product Introduction: Life Cycle Phases Team Members: Our names date Solar Plus.
Engineering for Data Protection and Accountability Michelle Finneran Dennedy Sun Microsystems, Inc.
Scope Development Component Specification Concept Development Design, Mockup, Engineering Prototyping Production This project timeline template is customizable.
Network design Topic 6 Testing and documentation.
Introduction to Usability By : Sumathie Sundaresan.
PARTNERSCO-FUNDED BY PRO-LITE OCTOBER 2015 PROCUREMENT OF LIGHTING INNOVATION & TECHNOLOGY IN EUROPE.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
115 Hyde Road|Yeronga Industrial Prospects Hyde Rd Industrial Precinct Scoping Workshop – September 2015.
Requirements in the product life cycle Chapter 7.
RECLAIM YOUR CHILDHOOD A VINTAGE TOY COMPANY. WEB SITE CREATION - WEEBLY BUSINESS ACCOUNT LOW COST, $20 PER MONTH INTEGRATED E-COMMERCE SHOPPING CART.
2016. Our Focus -Data Management Solutions & Analytics Datacentre Security Analytics.
Introduction to Carilex Medical. Overview  Manufacturer and designer of OEM and Carilex-branded wound care products o Specializing in therapeutic support.
Transportation Notes. Everything that is grown or manufactured is transported. Crops are transported from the field to storage facilities, then to markets.
Two Trends and Four Features from a Warehouse Perspective Melvin Fletcher.
Next Generation Flow Batteries for Grid Scale Energy Storage June 2012 EnStorage Confidential Information.
Developing a Business Plan Why a Business Plan is Important What Goes into a Business Plan? How to Create an Effective Business Plan.
Distribution #73- Explain the concept of distribution
Software and System Delivery
Quality Management Systems – Requirements
Outsourcing development
Lowering Costs Through Unique Solutions
Web Capstone: Reflection & Documentation
CHAPTER 2 Logistics system.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
COMPANY NAME/ PRODUCT NAME
A Computerized Planning Genius Reports & Functionality
Management Information Systems
Market Test the Offer.
Presentation transcript:

Demonstration Criteria and Logistics Teledyne Isco Confidential 1

Demo Terminology ■ Engineering Prototype – systems built by engineering for use internally for development testing – can NOT be sold ■ Manufacturing Prototype – systems built by manufacturing to test engineering design, develop assembly instructions, and are used for Beta testing in the field. Can be used for demonstrations for a limited period but can NOT be sold ■ Pilot Build Units – systems built by manufacturing to validate the assembly instructions. These unit normally are purchased for demonstration purposes and can be sold to end users. Teledyne Isco Confidential 2

Availability of Demo Units Through the EOY ■ One Pilot Build Unit will go to Switzerland for trade show and subsequent demos. ■ One Pilot Build Unit will go to the EU after CE Mark is complete for demonstrations Unit currently there will be returned to US. ■ Three units will be available for US field demonstrations (these are manufacturing prototypes) ■ Located in: California, New England, Mid Atlantic Teledyne Isco Confidential 3

Demonstration Qualification ■ Priority given to:  Funded Now Opportunity  Key Accounts where potential for multiple unit orders  Multiple demo site  University labs where outside visitors can be invited in  Industrial labs with multiple potential users ■ Use the Demo Qualification Form Teledyne Isco Confidential 4

Demo Timing ■ Target is to do no more than a week long demonstration at a site  First day is install and verify system is functioning  Second day is customer samples  Final day is tear down and pack up Teledyne Isco Confidential 5

Demo Timing ■ Before you ship a system confirm they have:  The ability to get the system from receiving to the lab  Bench Space  A source of Nitrogen at the necessary pressure and that you have the necessary adapters to connect the ¼” gas line  No resource conflicts Teledyne Isco Confidential 6

What is Not Going to Happen ■ System is not going to sit at a site forever ■ We are not going to do a demo for a start up or single lab where there is no money ■ A system is NOT going to sit in a storage facility unless it is there for less than a week between demos Teledyne Isco Confidential 7

Demonstration Logistics ■ Must be a two-person lift  Either you and a volunteer or 2 volunteers  You cannot ask a specific person to help – you must ask for a volunteer or volunteers  If there is only one person working with you, you must ask that person if they can find a volunteer – or volunteers ■ The unit must be secure when transporting - Strapped Teledyne Isco Confidential 8

Demonstration Logistics ■ No rental cars – due to damage risk  U-Haul small truck  2-person lift rule applies  U-Haul rents carts and dollies Teledyne Isco Confidential 9

Demonstration Logistics ■ A demo can only be done on a cart if there is a roll-in hood ■ Confirm storage of boxes, crates and the pallet ■ Keep the system busy or keep it moving ■ Ship it demo ready Teledyne Isco Confidential 10

Key Markets Teledyne Isco Confidential 11