CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.

Slides:



Advertisements
Similar presentations
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Advertisements

Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Probe beam distortion in TBTS due to high gradient RF acceleration (first part: observations) CTF3/TBTS Logbook 17 May 2013 Wilfrid Farabolini – Alexej.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
C.Limborg-Deprey Beam Dynamics Justifying L01 November 3 rd 2004 Beam Dynamics Justifications of modification of.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
I.V. Bazarov, ERL advisory mtg, Sept 2012 CLASSE Cornell University CHESS & ERL Cornell Laboratory for Accelerator-based ScienceS and Education (CLASSE)
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński Ben Constance Javier Barranco … 10 October.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
The CLIC decelerator Instrumentation issues – a first look E. Adli, CERN AB/ABP / UiO October 17, 2007.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
15 Oct 2008CLIC Workshop1 CTF3 Commissioning and Operation Simona Bettoni, Caterina Biscari, Roberto Corsini, Anne Dabrowski, Steffen Doebert, Andrea Ghigo,
1 General Status of Commissioning Piotr Krzysztof Skowroński CTF3 Collaboration Technical Meeting 27 January 2009.
Y. R. Roblin Hall A beamline and accelerator status.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
TBTS Test Program & Schedule G. Riddone
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
ON/OFF news. Reflected Transmitted Stroke 8.0 mm RF power, dB Piston position (gap width), mm ON OFF Compact design of the high RF power variable (mechanically)
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
CTF3 Drive Beam studies results & Program Piotr Skowroński for the CTF3 team 30 December 2013 CLIC Workshop
Oleksiy Kononenko CERN and JINR
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
I. Syratchev, HGW 2012, KEK, Japan The high power demonstration of the PETS ON/OFF operation with beam. I. Syratchev for CLIC team.
2014 Issues & Strategy execution Piotr Skowroński 18 January 2016 CLIC Workshop
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
What is needed for the operation, the resources, infrastructure issues and plans for 2009 and beyond. Impact of short shutdown in 2010 Piotr Krzysztof.
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
CLIC Frequency Multiplication System aka Combiner Rings Piotr Skowronski Caterina Biscari Javier Barranco 21 Oct IWLC 2010.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Beam Commissioning Adam Bartnik.
Piotr Skowroński for the CTF3 team
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
First Year of Operation at the Two-beam Test Stand
CTF3 Collaboration Board May 2009 G.Geschonke
Sara Thorin, MAX IV Laboratory
Steering algorithm experience at CTF3
S. Bettoni for the CTF3 commissioning team CTF3 commissioning status
Beam-beam effects in eRHIC and MeRHIC
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
TESLA Damping Ring: Injection/Extraction Schemes with RF Deflectors
Have a chance to operate your own beam at CERN
Multiturn extraction for PS2
CLIC Feasibility Demonstration at CTF3
Simulations for the LCLS Photo-Injector C
Presentation transcript:

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete update, not concentrating only on the last month

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Optics, DL, Ring, measurements Emittance & Twiss parameters with quad scans: well established & coherent (up to TL2) Kick measurements, tune and dispersion coherent with model (up to TL2, some recent doubts on DL) Ring length, closed orbit and combination procedure also well under control Still work needed for bunch length control and TL2 optics (see later) Example of quad scans in linac Emittance 40 to 100  mm mrad everywhere Example of dispersion measurement in CR

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Combination, x 4 in CR Combination factor four in CR established for both 3 GHz and 1.5 GHz beam Peak current about 15 A Routinely obtained above 12 A (from a few minutes to a couple hours set-up) Still work needed on remaining losses and reproducibility/fluctuations

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Combination, x 4 in CR

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Combination, x 2 in DL Beam re-established in DL after 2 years Optics and transport in DL under control – but yesterday… Problems with extraction - test interrupted due to hardware failures (MKL02 and TWTs) Beam in DL Beam through by-pass Re-combined beam Residual tail

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 TL2, TL2’, TBTS beamlines Line optics looks about OK (kick measurements) but difficult matching – recently identified one possible error (20% strength in one quad, under investigation) Non-combined beam transported to TBTS and through PETS with small losses (less that 10%) Combined beam transported to TBTS with some losses (from 12 A to about 10 A - no local losses in PETS) 21 Aug 8 Sept

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 TBTS, PETS conditioning Lots of breakdowns (pulse shortening) – most likely variable power splitter (outside PETS) Rapid (if a bit aggressive) conditioning – possibly limited by beam availability & current 3 July 23 July ~ 3 hours ~ 5 hours

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 TBTS, PETS conditioning Max power reached >160 MW (peak) – total pulse length about 200 ns – no flat top Power decrease – explained by bunch length – later recovered

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Variable power splitter Variable phase shifter Prediction Measurement

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 TBL status Prediction based on BPS 210 A few tests done in the (short) TBL Initial test (3.5 A to 10 A) good agreement with expectations

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 CALIFES status CALIFES back in operation, beam in the final spectrometer, some moderate losses First optics checks in TBTS OK Reached ~ 120 MeV, 0.2 nC / bunch, 100 ns Beam emittance optimization under way (Initial 90 MeV  mm mrad) Specifications Energy ~ 200 MeV Emittance < 20 .mm.mrad Charge per bunch : 0.6 nC Energy spread <2% Number of bunches : 1 to 226 Bunch length (rms) : 0.75ps Bunch spacing : 667ps

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 PHIN status First run in 2009 very successfull Bunch charge up to 2.5 nC, above nominal Beam energy ~ 5-6 MeV Emittance measured ~ 7  mm mrad Very good agreement with simulations Several potential improvements identified, will be implemented for next run Aims for next run: stability (short and long term)

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Goals 2009 CTF3 experimental program 30 GHz:One structure test (TM02) + breakdown studies PHINBeam characterization, reach ½ of nominal bunch charge ? CALIFESBeam characterization, beam to TBTS (most likely still reduced current) Delay LoopBack in operation, retrieve combination x 2 (~ 7 A) Combiner RingFinal optics checks, isochronicity, put together with DL (> 24 A) TL2Complete commissioning (tail clipper), bunch length control, > 20 A to users TBTSPETS to nominal power/pulse length (15 A, recirculation) Beam commissioning of probe beam line First accelerating structure tests (one structure ? – CLIC G) Two-beam studies (deceleration/acceleration), initial breakdown kicks studies TBLPETS validation (100 MW, need > 20 A), beam line studies (2-3 PETS ?) OthersCDR studies in CRM, beam dynamics benchmarking, stability studies, control of beam losses…

CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Today CLEX closed DL & high current TBTS DL & CR – full combination ? PHIN, 2 nd run CALIFES Opt. +TBTS CALIFES Opt. +TBTS DL & CR – further studies High current to TBTS check PETS Running in TBL line CALIFES TBTS + struct? CALIFES TBTS + struct? Two beam tests? Schedule end 2009 CALIFES opt.