ATC/ABOC Days 21-23/1/2008 Heinz Vincke for SC-RP 1.

Slides:



Advertisements
Similar presentations
Radiation Safety Training Rights and Regulations. Washington State University Radiation Safety Office.
Advertisements

TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
Simulations des niveaux de radiations en arrêt machine M. Brugger, D. Forkel-Wirth, S. Roesler (SC/RP)
EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
IEFC Workshop February 2010 H. Vincke for DGS/RP 1.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
ANALYTICAL X-RAY SAFETY User Training Centre for Environmental Health, Safety and Security Management.
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
07/10/2015radiation safety - level 51 Radiation safety level 5 Frits Pleiter.
Handling Electronics from Radiation Areas N. Conan, D. Forkel-Wirth, T. Otto, S. Roesler, C. Theis, C. Tromel, V. Tromel, Heinz Vincke, L. Ulrici R2E,
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
Radiation Protection for the Beam Line 4 Schools project Robert Froeschl (DGS/RP)
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire R. Trant HSE Unit for ACCU Meeting R. Trant.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Session 2 of ATC/ABOC Days 2008 Doris Forkel-Wirth, SC-RP Pierre Bonnal, AB-SU 1.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
RSSO REPORT TE-MSC Andrea Musso – Virginia Prieto Hermosilla (RSSO’s) Acknowledgments - We wish to thanks: Michele Modena (Safety Link Person TE-MSC) for.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
RSSOs at CERN Prepared by Ans Pardons for the CERN RSSO training day With input from J. Pedersen.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
1 Radiation Monitoring at CTF3 CTF3 Buildings – weak spots Radiation Monitoring system Monitoring results – First Lessons Idelette Floret, Thomas Otto,
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
1 July 2004 Radiation Protection Issues 1 M.Brugger, D.Forkel-Wirth, S.Roesler, H.Vincke SC/RP Review of the LHC Collimation Project 30 June – 2 July 2004.
1 SLHC-WP5 Progress Contributions from I. Dawson, L. Nicolas (U Birmingham), S. Pospisil (ITU Prague) T. Kramer, B. Goddard, M. Benedikt, Helmut.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
Application of « ALARA » at Tihange NPP ISOE EUROPEAN SYMPOSIUM 26 June 2008 Ir. Philippe Petit – Deputy head of SRP department 2 2.
Safety at CERN in the INB Context, J. Poole, July 2007 Safety in the INB Context and its Impact on Access John Poole AB-SU.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
The Panorama of the Future Radioactive Areas from now to 2020 S. Roesler on behalf of DGS-RP Workshop on remote manipulations and diagnostics in radioactive.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Shielding Design for LCLS Injector Operation – Phase one
Transposition of Requirements set out in the Basic Safety Standards for Nuclear Facilities in Lithuania Gintautas KLEVINSKAS Albinas MASTAUSKAS Radiation.
Radiation Protection Issues After 20 Years of LHC Operation
Beam Loss and Radiation Working Group: Conclusions
Radiation protection of Linac4 M. Silari Radiation Protection Group
Quality Assurance applied to Accelerator Safety
SOURCE PROJECTORS FOR INDUSTRIAL GAMMA RADIOGRAPHY IN FRANCE
Updates on ESS Handbook for Radiation Protection
Radiation protection organisation
Thomas Hansson & Francois Javier, ESH
C. Adorisio Extracted from the presentation given at
Lena Johansson Senior Radiation Protection Expert
Radiation Protection Handbook
Phenotyping Facility X-ray Awareness Training
Presentation transcript:

ATC/ABOC Days 21-23/1/2008 Heinz Vincke for SC-RP 1

Revised Safety Code F 2006  Legal Dose Limits of workers at CERN  Reference Levels  New Area Classification  CERN’s Approach to ALARA Impact on machine operation Summary and outlook 2

 Revised Safety code F (Radiation protection) was issued in November 2006 to bring CERN in line with European radiation protection legislations and regulations  CERN’s revised Radiation Protection rules and regulations were endorsed by the Swiss and French authorities  Safety Code F 1996 (Radiation Protection Manual) has been replaced by: Safety Code F 2006 and is being completed by radiation protections instructions + specific area- and work procedures Note that Safety Instructions for radiation protection contained in the CERN Radiation Protection Manual (1996) remain valid for a transition period until all instructions are revised. 3

 Occupationally exposed : ◦Safety Code F 1996: ◦< 20 mSv/12 months ◦Safety Code F 2006: ◦Class A< 20 mSv / 12 months ◦Class B< 6 mSv / 12 months  Short term visitors: ◦< 1 mSv / 12 months (not classified as occupationally exposed)  Not occupationally exposed: ◦< 1 mSv / 12 months 4 CERN legal limits

Year Number of persons with effective doses above 6 mSv/year Activity Cable changes, maintenance of beam instrumentation, transport, radiation protection Transport, maintenance of beam instrumentation 20022Transport Transport, radiation protection, Gamma radiography (preliminary) I) Annual individual, effective dose of occupationally exposed persons should stay below 6 mSv 5

II) The effective dose due to internal exposure should be less than 1 μSv per hour of stay Main risk: inhalation of radioactive aerosols Areas of risk: target areas, extraction and injection areas TCC2 CNGS Preliminary results from air measurements: TCC2: < 150 nSv effective dose for one hour of stay after two hours of waiting time CNGS: < 5 nSv effective dose for one hour of stay after 12 hours waiting time  Studies need to be continued Access procedures exists. Delayed access, several hours of waiting time 6

III) The annual effective dose to the members of the reference group of the population (the most exposed group outside CERN) should stay below 10 Sv per year. The legal limit is 300 Sv per year. Year From air/water releases From stray radiation Total Courtesy: P. Vojtyla SC-IE Natural radiation in the environment: ~800 Sv per year Effective dose in  Sv/year 7

Safety Instruction S3-GSI1, EDMS CERN Area Classification since end of

Area Classifica- tion Dose limit Ambient dose equivalent rate At work places Ambient dose equivalent rate In low occu- pancy areas Access, Personnel categories Monitoring Personal dosimetry Warning sign Non- designated area 1 mSv / y< 0.5 μSv h -1 < 2.5 μSv h -1 no restriction, all passive or active, not required n.a. Supervised radiation area 6 mSv / y< 3 μSv h -1 < 15 μSv h -1 supervised, radiation workers and VCT passive or active, personal dosimeter 9 Safety Instruction S3-GSI1, EDMS < 2007 <2.5 μSv h -1 <7.5 μSv h -1

Simple Controlled Radiation area 20 mSv/y< 10 μSv/h< 50 μSv/h Controlled Class A workers Class B with time limit Active Personal dosimeter Limited stay area High radiation area Prohibited area < 2 mSv/h <100 mSv/h >100 mSv/h Controlled Class A workers + Class B with time limit Active Personal dosimeter + Operational dosimeter Area Classifica- tion Dose limit Ambient dose equivalent rate At work places Ambient dose equivalent rate In low occu- pancy areas Access Personnel categories Monitoring Personal dosimetry Warning sign mSv/y < 2007 <25 μSv h -1 <100 μSv h -1

11 *) with respect to legal limits only but jobs have to be optimized and doses minimized in ALL areas

Goal:  to bring CERN’s area classification in line with Safety Code F 2006  to keep the classification of an area as “low” as reasonable possible Non-designated supervised simple controlled …….. By Minimize beam loss Shielding ARCON/RAMSES alarms and interlocks Restricted access procedures Limitation of beam intensities 12

< 2006: - ~160 uSv/h on top of H6 beam line 2007: - ~ 20 uSv/h due to additional 6.4 m thick iron shielding in TCC2 New shielding Existing shielding TCC2 Courtesy: Lau Gatignon 13

Presently alarm levels of radiation monitors correspond to ‘supervised’ area levels In 2007 several beam cuts occurred and all of them could be backtracked to either placement of material into unshielded beam lines or unauthorized opening of collimators. Access to underground tunnel was prohibited when beam was dumped into upstream target in H4 beam line Measuring campaign will be continued in 2008 Simple controlled Additional concrete shielding Underground tunnel 14

Radiation measurement in 2004 at the ramp: 9  Sv/h Installation of a magnetic collimator (SCRAPER) and a magnetized iron block in the transfer tunnel TT83 during the long shutdown in Radiation measurement in 2006 at the ramp: 5  Sv/h on floor level and 2.4  Sv/h at 100 cm height. 15

BA80 during beam operation: Issues with other areas: TT10 TT20 PS bridge Route Goward Limited stay area around ion exchangers – to be fenced Simple controlled area EHN2: COMPASS - supervised area even during hadron run see presentation S. Gilardoni 16

All work in radiation areas has to be optimised  Supervised area: general optimisation by shielding, optimised location of workplaces…  Controlled radiation areas: All work must be planned and optimised including an estimate of the collective dose and of the individual effective doses to the workers participating in the completion of the task. 17

most of the ALARA elements were already used all over CERN in the past since December 2006:  systematic, formalized approach  requires “close collaboration” between RP and the workers performing the job 18

ALARA procedures – 3 levels: ◦ If the rad. risk is low <> light procedure ◦ If it is medium <> an optimization effort is required ◦ If it is high <>an optimization effort is required, the procedure will be submitted to the ALARA committee 19

20 EDMS

21 EDMS

22 When to apply which kind of procedure ? required optional

23 ShutdownRun Establish list of maintenance tasks Evaluate the radiological risks Planning of interventions Maintenance work Preparatory meetings ALARA committee – if required Analysis, lessons learned ALARA committee (7 members): Chef d’installation (president) Scientifique secretary 2 Representatives of the owner equipment group 2 Members of RP 1 External person, e.g. RSO of another department

24 Radiological classification of shut-down activities for the SPS complex in 2007/2008 (Not exhaustive) 22 August 2007

 First ALARA committee meeting was held 19/11/2007 (only part of class III works were discussed, the rest will be done in January 2008)  Conclusions and recommendations ◦ Many jobs are already optimised thanks to  experience  good co-ordination of the work by machine superintendants  earlier investments (e.g. SPS magnet repair: workshop in ECA5, purchase of additional magnet transport vehicle to compensate for the longer transport time of a magnet (circumventing BA1!) ◦ Improvements are still possible  Remote radiation measurement device  Remote visual inspection device  Use of fluorescence tubes which double the life time  Switching off the light during beam operation  …… 25

 Revised RP rules, regulations and instructions are already applied at CERN since end of 2006  More Safety Instructions still need to be completed e.g. ◦on the control, handling and release of activated material ◦on radioactive laboratories etc.  More procedures still need to be completed e.g. ◦compensate for ARCON and RAMSES failures (e.g. stop of SPS when environmental station in TT10 fails)  Revision of area classification needs to be continued ◦activities not directly correlated to beam operation should be moved out of radiation areas ◦Areas need to be shielded or fenced (e.g. North Area, SPS and CNGS ion exchangers, more areas see S. Gilardoni’s talk) 26

 Radioactive waste ◦Note that minimisation of radioactive waste is an integral part of the ALARA approach. Optimisation of the installation design with respect to material choice and maintenance interventions helps in reducing the total amount of radioactive waste and collective doses.  New general radiation protection training course. ◦By decision of the Director- General the course is mandatory for all people under dosimetry control (i.e. in possession of a personal dosimeter). ◦Daily sessions started on Monday 14 January ◦More information can be found in the present CERN Bulletin (Issue No.04-05/2008). Design and work procedures have to be adapted to the operation under new rules. To date excellent collaboration between SC-RP and all departments involved 27

28

29

Aim: supervised area -> reinforcement of shielding Shielding wall Chicane entrance to SPS SPS tunnel Access gallery ECX4 Additional shielding slit Shielding of corners Cable tubes 30

31 Peak value: 1  Sv/h Corresponds to a beam loss of 0.05% Non accessible area (on top of the ECA4 shielding) In accessible area (barracks) in ECA4 At the floor of ECA4 Supervised area up to 4.8E13 protons/6 sec – nominal CNGS intensity 10 1