Work packages and early schedule WP1 - Mechanical design 6 JB Daban -F Fressin -F Valbousquet -K Agabi -OCA groupe projet -LUAN groupe projet  Design.

Slides:



Advertisements
Similar presentations
Welcome to the University of Michigan – Dearborn Observatory Founded 2007.
Advertisements

False positives in the Corot transiting planet search Goal: estimate the amount of ground-based observations necessary for the Corot ground-based follow-up.
GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
2009/02/03Meunier et al., Symposium CoRoT EXODAT: Exo-Planet Information System : Evolutions J.-C. Meunier †, M. Deleuil †, C. Moutou †, H. Deeg,
Radial Velocity follow-up of SWASP-North candidates with SOPHIE (1.93-m OHP) G. Hébrard & F. Bouchy (IAP/OHP)
Illumination Model How to compute color to represent a scene As in taking a photo in real life: – Camera – Lighting – Object Geometry Material Illumination.
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
Darcy Bibb Oceanit Mentor: Tony Bartnicki Advisor: Curt Leonard Home Institution: Maui Community College Integration of a Small Telescope System for Space.
An Introduction to mini-SONG Project Xiaojun Jiang Natioanl Astronomical Observatories Chinese Academy of Sciences.
Jamie Holder School of Physics and Astronomy, University of Leeds, U.K Optical SETI at Leeds Using Cherenkov Light Buckets as Optical SETI Detectors RAS.
PROSEMINAR Environmental Management ENVR E-200. DO YOU HAVE? System for keeping notes on your readings and draft writing Information on your primary target.
INSTRUMENTATION AT THE GETTYSBURG OBSERVATORY….And what to do with it. American Astronomical Society 205 th meeting, San Diego, Jan 13, 2005.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
SONG – Stellar Observations Network Group - The robotic software for the SONG network S.Frandsen 1, Eric Weiss 1, J. Skottfelt 2, M.F. Andersen 1, F.Grundahl.
F.Fressin, T.Guillot Y.Rabbia, A.Blazit, JP. Rivet, J.Gay, D.Albanese, V.Morello, N.Crouzer (OCA - Nice), F.X Schmider, K.Agabi, J-B. Daban, E.Fossat,
Planning for a Remote Robotic Observatory in Australia! Due to the time zone differences between Kentucky and Australia, when it is 9:00 am in Lexington,
Planning for a Remote Robotic Observatory in Australia Suketu Bhavsar, Dept. of Physics and Astronomy, University of Kentucky (UK)! Due to the time difference.
ISSAT “Telescope Alpha” Richard Berry Astronomical League.
The Blind Test in colors C. Moutou, R. Cautain, D. Blouin, A. Lanza, S. Aigrain, H. Deeg, …
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
Research and Imaging Program for the SVAS. Current Situation Society supports beginners well –Messier Group –Community Outreach programs Monthly star.
The Chinese SONG proposal: scientific concerns Jianning Fu (Beijing Normal University) and Chinese SONG team Beijing ─ March 29, 2010 The third workshop.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Hristo Pavlov 4-th Trans Tasman Symposium on Occultations 5 April 2010, Canberra.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
Number of eclipsing binaries vs. transiting planets: preparation of follow-up observations Tristan Guillot (OCA), Frédéric Pont, Maxime Marmier, Didier.
Telescope Integration and Tests Tuesday Afternoon.
HD This star is found periodic. The possible period is days. We present the phase curve with this period. HD This star is not variable.
星網計劃 The NETS Project: The NEtwork of Transit Survey 江瑛貴 Ing-Guey Jiang National Tsing-Hua Univ., Taiwan.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
February 2013 Ground Layer Adaptive Optics (GLAO) Experiment on Mauna Kea Doug Toomey.
SAM PDR1 S OAR Adaptive Module LGS LGSsystem Andrei Tokovinin SAM LGS Preliminary Design Review September 2007, La Serena.
Photometric detection of the starlight reflection by a “Pegasi” planet Martin Vannier (1), Tristan Guillot (2), Suzanne Aigrain (1) (1) ESO, Chile (2)
Observation of the photocentre position variations with CoRoT - Scientific motivations and expected performance C. Moutou (LAM) – H. Deeg (IAC) – M. Ollivier.
The Future of Helioseismology. NSF Senior Review Has recommended that GONG be closed one year after successful SDO/HMI commissioning unless outside funding.
Reflecting Telescopes. Mirrors A flat mirror reflects light in straight lines. A curved mirror can focus light to a point. A perfect parabolic mirror.
Corot Week 9 ESTEC 5-9 Dec 2005 Frédéric Pont Geneva Observatory Lessons from the OGLE planetary transit survey Francois Bouchy (Marseille/OHP), Nuno Santos.
A STEP Expected Yield of Planets … Survey strategy The CoRoTlux Code Understanding transit survey results Fressin, Guillot, Morello, Pont.
The Active Optics System S. Thomas and the AO team.
The experience of BEST Heike Rauer and the BEST Team Institut für Planetenforschung Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR) and Zentrum für.
SITE PARAMETERS RELEVANT FOR HIGH RESOLUTION IMAGING Marc Sarazin European Southern Observatory.
PS1 PORDIG Meeting, Nov ● Observatory, Telescope, and Instrument Software (OTIS) ● Remote Operations ● Survey Efficiency ● Scheduler and Simulated.
Guiding Control Subsystem (GCS) Overview
Prepare your scantron: Fill in your name and fill the bubbles under your name. LAST NAME FIRST, First name second Put your 4-digit code instead of “ IDENTIFICATION.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
C2PU TELESCOPES © C2PU, Observatoire de la Cote d’Azur, Université de Nice Sophia-Antipolis Jean-Pierre Rivet CNRS, OCA, Dept. Lagrange
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
The Doppler follow-up of COROT transit candidates F. Bouchy Laboratoire d’Astrophysique de Marseille Corot Week 8 – 23/27 May 2005.
Measurement of the photocentre position variations with CoRoT - further investigations M. Ollivier (IAS)
T. Axelrod, NASA Asteroid Grand Challenge, Houston, Oct 1, 2013 Improving NEO Discovery Efficiency With Citizen Science Tim Axelrod LSST EPO Scientist.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Using a Radio Telescope
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Solar-B Science Working Group
Recall reading assignment:
First results from BEST at OHP
Intro to CCD Imaging Joe Roberts
C2PU TELESCOPES Version 02, 28/08/2016 Jean-Pierre Rivet CNRS, OCA,
Observational Astronomy
Launch and On-orbit Checkout
Karen Meech Institute for Astronomy TOPS 2003
C2PU TELESCOPES Version 02, 28/08/2016 Jean-Pierre Rivet CNRS, OCA,
Echidna: current status and expected performance
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Some preliminary results from the exochannel
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

Work packages and early schedule WP1 - Mechanical design 6 JB Daban -F Fressin -F Valbousquet -K Agabi -OCA groupe projet -LUAN groupe projet  Design of telescope tube structure, telescope to mount fixation  Early discussion on design with groupe projet (Sep ? Oct ?): Karim, JB, Franck: list of needed specifications – Heike Anders, Frederic tolerance on changes on PSF shapes for image substraction  Choice of the telescope size to be done according to telescope mount at the end of October and realisation

Work packages and early schedule WP2 - Telescope and Camera software -A Klotz -A Blazit -C Combier -K Agabi – organizing discussion -A le Van Suu -C Carol  Study of telescope guiding and tracking software and camera reading. Computer interfaces/redundancy/security  Meeting between LUAN and OHP teams soon (Sep ? Oct ?) to fix which software can be reused/adapted for A STEP

Work packages and early schedule WP-3 Camera thermal enclosure design and tests/ filter and field corrections – > subcategory of WP-1 -A Blazit -JB Daban -F Jeanneaux -Y Fantei -F Fressin -K Agabi  Design of enclosure for camera / wynne corrector /filter or dichroïc, fixation on telesope tube

Work packages and early schedule WP-4 Optical combination – Camera tests A Blazit V P Assus F Fressin A Erikson + F Pont in reaction mode – F Valbousquet real input  Zeemax simulations of the field – PSF shapes on every part of the field.

Work packages and early schedule WP campaign tests -D Mekarnia V -FX Schmider -E Fossat -K Agabi + F Valbousquet V + V : optical experiments – small mirrors including tulip mirror in zerodur September  Logistic needs for A STEP : to be defined for September 11  Checking the availability of new “optical experiments” site at Dome C, or preparing A STEP for Concordiastro site  Testing specific treatment on zerodur mirror at different places – behaviour of frost - optical behaviour of mirrors Foucault test  What do we send at Dome C in 2 months ?  Additional tests on Astro 1200 ? Different payloads ?

Work packages and early schedule WP-6 Dome C specific problems: open questions that require study groups - Karim V  How to do flat fields at Dome C ? Mandatory for good photometric precision – frequency needed ?  Necessity of a protection for bad condition days/summer ? Availability of “flower domes” ?  Electrical problems/overcharges – all electronic control  Duplication ? Of camera ? Encoder (mount) Control computer  Who will run A STEP in 2007 ?

Work packages and early schedule WP–7 Data pipeline – Light curves extraction and analysis -H Rauer V -A Erikson -F Pont -T Guillot -FX Scmider -F Fressin  What is reused from BEST data pipeline ? Design of the alarm mode and photometric control. What has to be fixed before A STEP departure for Dome C?  Need to drive A STEP on sky in France before computing the real pipeline – define specific alarm mode too –  Proposal: input from Heike – development as a team approach – raise fundings – archiving A STEP data – Proposal fro A STEP/BEST 2 comparisons/summer/winter network - internal DLR funding application by spring 2007

Work packages and early schedule WP-8 Target fields selection – survey strategy -T Guillot -FX Schmider -F Pont -H Rauer -C Moutou -M Deleuil -S Aigrain -F Fressin  Need for preliminary observations – or data base on target fields ? Specific needs for seismology targets ?  Target field selection from Holger thesis  Starting discussion with Marseille field selectors for CoRoT

Work packages and early schedule WP-9 Data analysis – Follow up of candidates -T Guillot -FX Schmider -F Pont -H Rauer -A Erikson -F Bouchy -F Fressin -S Aigrain -C Moutou  What is necessary to fix soon ?

Work packages and early schedule WP-10 Future prospects – the best design for global transit search -T Guillot -H Rauer -Y Fantei : internet site soon -A Erikson -F Pont -FX Scmider -F Fressin  comparative simulations with CoRoTlux – experience from BEST-2 – A STEP connection and CoRoT preliminary results  Necessity to propose different designs soon for visibility and outreach ?  Developping webpage / internal and public ? Yan Fantei