History of New Crane & Derricks Standard July 30, 2003: C-DAC first meeting July 30, 2003: C-DAC first meeting Committee met 11 times Committee met 11.

Slides:



Advertisements
Similar presentations
A Look Ahead for the Construction Industry Jim Maddux - Director Directorate of Construction.
Advertisements

Presenter Name Presenter Title Event Name
Nationally Recognized Testing Laboratories
OSHA/C-DAC Requirements for Riggers & Signal Persons
ELEVATING WORK PLATFORMS By Richard Hadcroft. PARTIES INVOLVED.
Pipeline Operator Qualification Regulations 49CFR Part 192, Subpart N (Gas)49CFR Part 192, Subpart N (Gas) 49CFR Part 195, Subpart G (Liquid)49CFR Part.
OSHA Update August 10, 2010 Jack Rector Area Director El Paso Area Office Lubbock District Office.
Cranes and Lifting Safety
Washington State’s New Construction Crane Rule
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
Pipeline Personnel Qualification
OSHA 29 CFR Part 1926 Cranes & Derricks In Construction
Morrow Equipment C O M P A N Y, L. L. C. Peter Juhren Corporate Service Manager Morrow Equipment Co. L.L.C. Salem, OR USA Peter Juhren Corporate Service.
THE EFFECTS OF WIND ON CRANES AND THEIR LOADS
Crane-Related Deaths and Injuries in Construction
Understanding Crane Accident Failures: A report on causes of deaths in crane-related accidents Michael McCann, PhD, CIH Presented at 2010 Crane & Rigging.
WAC Part L Construction Cranes, Rigging, and Personnel Lifting
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
OSHA Subpart CC-Cranes and Derricks in Construction Assembly/Disassembly requirements. Steve Owens, Crane and Rigging/Heavy Equipment Specialist.
ISSUES SAUDI ARAMCO PROCEDURES SAUDI ARAMCO OPERATOR CERTIFICATION
ARE YOU READY FOR 11/10/14? What a Simple Read of OSHA’s Personnel Qualification Rules May NOT Tell You.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
New Beginnings for CTE in Texas. HB 809 Dissemination of information regarding employment opportunities to secondary school students Effective: September.
OSHA Crane Rule – Impact on other Machines Steve Neva AEM 25 th Joint Technical Liaison Meeting 16th-17th April, 2015 Tokyo, Japan.
Proposed Rule for Preventive Controls for Animal Food 1.
The Cost of Clean Air FEES REVISED: 2011 NACAA Membership Meeting Cleveland, OH October 5, 2011.
Performance Specifications T. E. A. M. St. Louis Presentation October 8, 2004.
Royal Arc Training Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2011.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Current Safety and Health Issues Facing the Roofing Industry RSCA, Inc. St. Louis Tuesday, August 14, 2012 Harry Dietz NRCA Director of Risk Management.
Crane Questions Jim Shelton, HNAO CAS These are not necessarily official OSHA opinions but guidance until official interpretations may or may not be.
OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)
Presented to Georgia Airports Association Conference October 21, 2009 EPA Spill Prevention Control and Countermeasures – Update Also – What’s Coming with.
Proposed Rule for Preventive Controls for Animal Food.
Proposed Rule: 21 CFR 507 Proposed Rule for Preventive Controls for Animal Food 1.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Benjamin Ross, Assistant Regional Administrator for Enforcement Programs February 13, 2012 ASSE FEBRUARY MEETING Federal OSHA Update.
HIPAA History March 3, HIPAA Ruling Health Insurance Portability Accountability Act Health Insurance Portability Accountability Act Passed by Congress.
PRIME CONTRACTOR EVERYTHING YOU NEED TO KNOW IN 10 QUESTIONS AND ANSWERS Presentation By: Chuck Samphire Presentation To: BOMA Date: October 22, 2015 Jobs,
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
The National Association of Tower Erectors (NATE) is a non-profit trade organization dedicated to facilitating safety, education and standards for the.
Crane & Derricks In Construction
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Crane Safety Standards
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Cranes and Derricks Safety
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
Ensuring the Safety of Non-Employees in the Brewery
History and Status Tallinn, 18 May 2005 Leo Huberts
2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken
EPA’S New Source Performance Standard (NSPS)
A. Datum Corporation Bid package overview
Who is Liable for a Construction Accident?
Effective Workforce Development Programs
How to Survive OSHA’s Steel Erection Standard
A. Datum Corp. Bid package overview.
2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken
OSHA’s Final Rule: Electric Power Generation, Transmission, and Distribution Electrical Protective Equipment Presented to: RESAP Area Administrators Presented.
13-block rotation schedule
Regulation Updates in OSHA
10th HDV CO2 Editing Board Meeting 9 October 2017
Strategic Planning Timeline Overview
38a. Number of fatalities, by major industry, 2015 (All employment)
NPA 403/587/780/825 (Area Code) Relief in Alberta
Safety Alliance for Excellence
Julie Woosley, Division of Waste Management
Presenter Name Presenter Title Event Name
Ward Park Restroom Timeline
2015 January February March April May June July August September
Presentation transcript:

History of New Crane & Derricks Standard July 30, 2003: C-DAC first meeting July 30, 2003: C-DAC first meeting Committee met 11 times Committee met 11 times July 9, 2004: Committee finished July 9, 2004: Committee finished October 9, 2008: OSHA issues proposed rule October 9, 2008: OSHA issues proposed rule October 9, 2008 – January 22, 2009: Public October 9, 2008 – January 22, 2009: Public comment period August 9, 2010: Standard published August 9, 2010: Standard published

Effective Dates November 8, 2010 – Standard effective (most items but not operator certification) November 8, Operator qualification/ certification required

– Subpart CC Those affected by new regulation: Owners Users Responsible parties – Prime contractors – General contractors – Construction managers

Crane Types Covered Used in construction Examples include: Crawler Cranes Cranes on Barges Mobile Cranes Straddle Cranes Industrial Cranes Tower Cranes

Major Changes Ground Conditions – Assembly/Disassembly – – Rigger Qualification – (r)(1) & (c)(3) Power Lines – – Inspections –

Major Changes - Continued Operator Aids – Operator Certification – Signal Person Qualification – Tower Cranes –

Ground Conditions – Ground Conditions – Ability of the ground to support the equipment Supporting Materials – Blocking, mats, cribbing 1. Ground conditions and use of supporting materials must meet manufacturer’s specifications for support and degree of level

Ground Conditions – Controlling entity: General Contractor, Construction Manager, etc. Ensure ground conditions meet manufacturer’s specs Inform user of the crane and operator of hazards under equipment set-up area 3. Employer with authority at the site must make or arrange for proper ground conditions 4. If ground conditions do not meet requirements