Data capture of the PHC 2002 (Uganda) Experiences and lessons leant.

Slides:



Advertisements
Similar presentations
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Data Entry and Processing.
Advertisements

MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop MICS4 Technical Assistance.
ENGENDERING POPULATION CENSUSES IN MALAWI Prepared by: Mylen Mahobe National Statistical Office (Malawi)
Survey expenses and budget allocation Ed Rege ILRI 26 February 2003.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
The 2010 Population and Housing Census National Statistical Office, Thailand May 2010, Bangkok, Thailand.
Census Dates  September 2010, or  Six months after elections to ensure smooth conduct free from any political clashes.
WHO supported Injury Surveillance in Africa Dr. Olive C. Kobusingye, WHO/AFRO Ms. Kidist Bartolomeos, WHO Mozambique Ms. Malin Ahrne, WHO Ethiopia Dr.
USE OF GIS IN CENSUS MANAGEMENT AND MAPPING: THE KENYAN EXPERIENCE Presented by Joseph Nyangaya Ndubi Kenya National Bureau of Statistics.
Introduction of Internet Survey Methodology to the Emirate of Abu Dhabi Andrew Ward, Maitha Al Junaibi and Dragica Sarich.
Brief Overview of Data Processing of Afghanistan Household Listing, Pilot Census Results, Population and Housing Census and NRVA Survey Brief Overview.
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
National Statistical Office, Thailand 2-6 December 2013, Hanoi, Viet Nam Census Evaluation.
General Statistics Office of Vietnam THE 2009 VIETNAM POPULATION AND HOUSING CENSUS.
An overview of Census 2011 by Yasmin Cassimally, Statistics Mauritius Mourouk Ebony Hotel, 4 July 2013 Census 2011 Census 2011: Key Statistics for a better.
Dissemination of Census 2012 results Eartha Groenfelt Manager Census Office General Bureau of Statistics Suriname CARICOM Population and Housing Census.
Manual Data Processing of Census Data 2004 Population and Housing Census Statistics Sierra Leone Thekeka Moses Conteh Sierra Leone.
Sudan Experience on Poverty Survey Somaia K.E.Omer Date 7-8 Aug بسم الله الرحمن الرحيم.
 Introduction  Strategic Objectives of IT Operation for 2008 Census  Constraints  Conclusion.
Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Coding and Data Processing Section B 1.
1 Census 1996, 2001 & Community Survey (CS) United Nations Regional Workshop on Census Data Processing Contemporary Technology from Census Data Capturing.
Tool for Assessing Statistical Capacity (TASC) The development of TASC was sponsored by United States Agency for International Development.
HOUSEHOLD SURVEY PROGRAMME IN UGANDA: PAST EXPERIENCES AND FUTURE PLANS By James Muwonge Uganda Bureau of Statistics OCTOBER, 2009.
By Cleophas Kiio Director, ICT 15-sep-101 The Best Practices in Census Data Processing Operation: Case of 2009 Census:
DRS Census Experience Andy Tye International Manager, DRS DRS Census Experience Andy Tye International Manager, DRS Census Meeting – New Caledonia Feb.
Sterling Chadee Director of Statistics. The processing of the data from the field enumeration began in July 2011 until September All data processors.
1 Modernization of Statistical Business Process via a World Bank Project at General Statistics Office of Vietnam (GSO) International Seminar on Modernizing.
Workshop on International Standards, Contemporary Technologies and Regional Cooperation, Noumea, New Caledonia, 04–08 February 2008 Results Generated from.
Scanning Technology and Its Application in Ethiopia Yakob Mudesir Deputy Director General Central Statistical Agency of Ethiopia
2007 Population and Housing Census (Swaziland) Presented by: Muzi Dube.
Uganda – October 2009 Census Data Collection & Processing John Gomersall.
Bharat Sharma Nepal POPULATION & HOUSING CENSUS OF NEPAL: AN EXPERIENCE OF OUTSOURCING REGIONAL WORKSHOP ON CENSUS DATA PROCESSING September, 2008.
Mazlan Sulong Department of Statistics MALAYSIA Census Data Capture MALAYSIA Population Census 2000 vs Population Census 2010 (proposed solution)
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys Addis Ababa,
U.S. Census Bureau International Programs Center Microcomputer Processing of Census and Surveys (using CSPro)
Data processing of 2000 population and housing census of Mongolia Munkhbadar Jugder, Senior officer of Population and housing census bureau, NSC of Mongolia.
Data Processing of the 2010 Population and Housing Census September 2008, Bangkok, Thailand National Statistical Office, Thailand.
UNSD-UNESCAP Regional Workshop on Census Data Processing: Contemporary technologies for data capture, methodology and practice of data editing, documentation.
How to Plan for the Implementation of the Toolkit CEI Implementing the Reproductive Health Assessment Toolkit for Conflict-Affected Women November.
Sri Lanka. History  First Population & Housing Census : 1871  139 years ago  Last Population & Housing Census : 2001  After a lapse of 20 years 
POST ENUMERATION SURVEY TANZANIA EXPERIENCE BY Mrs RADEGUNDA MARO.
Use of Mobile Technology for Data Collection in Zimbabwe Experiences Gained and Lessons Learnt By Rodgers M. Sango Zimbabwe National Statistics Agency.
Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Coding and Data Processing Section A 1.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys, Asunción,
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section A 1.
Copyright 2010, The World Bank Group. All Rights Reserved. Budgeting Statistical Projects Section B 1.
Présentation du recensement Haïtien de 2003 Haiti’s 2003 Population and Housing Census.
Regional Roundtable on World Programme for the Census of Agriculture 2020 Bangkok, Thailand September 2016 Use of Technology for field data capture.
Census Planning and Management
Census Mobile Data Capture Using CSPro in Lesotho
CENSUS MAPPING USING SATELLITE IMAGERY IN MALAWI
2000 POPULATION AND HOUSING CENSUS:
By Seth N. Mayinza Director, UCA
UN Reg. Workshop on the 2020 World Programme on
Ethiopian 2007 CENSUS DATA CAPTURING AND PROCESSING
DATA CAPTURE - Zimbabwe
Budgeting and fund raising
Post Enumeration Survey Census
Population and Housing Census of Nepal: History, Lessons learned, and Initial planning for 2021 census Mahesh Kumar Subedi & Prakash Poudyal Central Bureau.
United Nations Regional Workshop on the 2020 World Programme
Omenya Nyahul Kenya National Bureau of Statistics
CENSUS PLANNING AND MANAGEMENT
Albania 2021 Population and Housing Census - Plans
CSPro: Census and Survey Processing System
Population and Housing Census 2015, and Challenge
Quality assurance in population and housing Census
Lao in Census Quality Assurance
Quality assurance in Population and Housing Census-The case of Ghana
By: Uganda Bureau of Statistics SESRIC, Turkey, March 2019
Presentation transcript:

Data capture of the PHC 2002 (Uganda) Experiences and lessons leant

Introduction 6 population censuses in , 1969, 1980, 1991 and the 2002 (most recent) Planning for the PHC 2002 started in 1997 with the development of the Census Master Plan The plan also included strategy for data processing PHC 2002 Results showed that Uganda population size then was 24.2 millions

Preparations for Data processing started in 2001 (Challenges, successes, technology to use) –A study tour to SA, Kenya, and Zambia After the tour, UBOS opted for the traditional mode of data capture using keyboards. Data Processing The 1991 PHC software used was - imps for capture - CONCOR for editing - TPL for tabulation The 2002 PHC software used was - CsPro for capture - CONCOR for editing - CsPro for tabulation

Why manual data Entry? Time left was little (only 12 months) The budget for the equipment and technical expertise The pilot census had used data entry. Needed to redesign the tools which had already been piloted Available expertise to manage traditional data entry method No local technology available to print papers for scanning technology, International procurement for this would be very slow.

Data processing personnel It involved about 527, 330 of whom were DEOs (some become supervisors, shift leader and team leaders) The center was headed by a data processing officer and an assistant DPO (permanent UBOS staff). 60 extra data entry operators to capture the post enumeration data were recruited. Data processing took place in a site away from the UBOS premises. A team had 10 people and one was a team leader There was four sections Stores Normal working hours Coding Three shifts Data entry Three shifts Editing and tabulation -----Normal working hours Questionnaire was pre-coded, coders coded only occupation and verified the geo-information

Working shifts Three shifts a day for 6 days a week Shift A (from 7.30 am to 2.30 pm); Shift B (from 3.00 pm to pm); and Shift C (from pm to 6.30 am).

Data Entry Started with a summary sheet in October took one month Then captured the agricultural module (100% verification) Then the Household Module (100% verification and later 20% verification) started in July 2003, Net work was then laid ended in October 2004 Then the The Hotel, MSE and Community questionnaires. (different DEO for this). Training All new data entry clerks were subjected to a one month training to perfect their keyboard skills. Focus of the training was speed and accuracy

9.12Technical Assistance The US Census Bureau on census planning which included data processing An independent consultant for data processing The US Census Bureau on developing edits and implementing edits, plus tabulation