Implementing Disaster Recovery Plans

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Program design overview Pre-contract to post-program year Office on Volunteerism and Community Service.
Join the conference call by dialing the conference number in your Invitation or Reminder s. Please put your phone on mute. Please stand by! The webinar.
Records Emergency Planning and Response Webinar Session 2 Join the conference call by dialing the conference number in your Invitation or Reminder s.
SIEP HSE Management System
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
Business Crisis and Continuity Management (BCCM) Class Session
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Modern Systems Analysis and Design Third Edition
Preparing to Develop a Disaster Recovery Plan
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
1 14. Project closure n An information system project must be administratively closed once its product is successfully delivered to the customer. n A failed.
Fundamentals of Information Systems, Second Edition
1 Assessment: Audits. Assessment: Audits - Module 9 2 Learning Objectives At the end of this activity, you will be able to: Develop a process to prepare.
Purpose of the Standards
Development and Quality Plans
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
EPR-Public Communications L-05
Guide to Disaster Recovery
Unit Introduction and Overview
Continuity of Operations Planning COOP Overview for Leadership (Date)
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
Systems Analysis and Design: The Big Picture
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Copyright Course Technology 1999
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
PMP® Exam Preparation Course
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
An Introduction to the Fairfax County Communication Strategy
Basics of OHSAS Occupational Health & Safety Management System
The Marketing Plan.
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Performance Improvement. 2 Steps to Performance Improvement 1. Define the Problem 2. Define Duties or Behaviors to be Improved 3. Establish Priorities.
Conservation Districts Supervisor Accreditation Module 9: Employer/Employee Relations.
Who’s going to sit here? Create a shared understanding of position responsibilities Save recruiting time and money Provide necessary information so candidates.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Software Project Management
Developing Plans and Procedures
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
Performance Management A briefing for new managers.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
The Marketing Plan Chapter 2. Section 2.1: Marketing Planning  Good marketing requires good planning Research your company Study your business environment.
Disaster Recovery Planning (DRP) DRP: The definition of business processes, their infrastructure supports and tolerances to interruptions, and formulation.
INFORMATION DISASTER PREPAREDNESS PLANNING (IDPP).
Business Continuity Planning 101
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
Security Methods and Practice Principles of Information Security, Fourth Edition CET4884 Planning for Security Ch5 Part I.
Information Security Policy
First Impressions and an Ethical Foundation
an effective self assessment system
Principles of Information Systems Eighth Edition
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
Audit Planning Presentation - Disaster Recovery Plan
Project Management Process Groups
Continuity of Operations Planning
The Survival Plan.
Presentation transcript:

Implementing Disaster Recovery Plans Chapter 9

You Will Learn How To… Develop an implementation plan Assign responsibilities for implementation Establish an implementation schedule Distribute the disaster recovery documentation Assess the value and effectiveness of mitigation steps Manage internal and external awareness campaigns Launch a training program for disaster recovery

Developing an Implementation Plan Implementation plan affects all the departments in an organization The plan must be managed step by step, and progress must be evaluated on a scheduled basis Implementation plan requires training for all employees, and might require new equipment and procedures Events occurring during implementation Responsibilities for implementation are assigned to members of the disaster recovery planning team and departmental groups An implementation schedule is developed, with timelines and planned progress evaluations Disaster recovery documentation is distributed to everyone who needs copies, or online access is provided The value and effectiveness of mitigation steps are assessed. New mitigation steps could be put into place, and existing steps may be modified The organization plans and launches internal and external awareness campaigns The organization develops and launches employee training programs for disaster recovery procedure

Developing and Implementation Plan Organization wide activities may include raising awareness and training Deployment of equipment and other like actions may need to occur at the facility level The departments and work groups affected by new or changed procedures must make these changes or additions

Organizational levels for implementing parts of the plan

Assigning Responsibilities for Implementation The disaster recovery planning coordinator and planning team assign responsibilities for implementing the plan The coordinator takes the lead in monitoring and evaluating the progress of implementation The activities involved in implementation include directing management to establish liaisons with law enforcement and emergency services Managers need to assign activities to employees Department work groups implement the aspects of the plan that impact their department Activities include changing existing procedures and evaluating mitigation steps, as well as developing new mitigation procedures to support recovery priorities in the plan

Assigning Responsibilities for Implementation The Purchasing Department takes the lead in processing all paperwork necessary to acquire equipment necessary to implement the plan If the new equipment is used only in one department, that department may install the equipment New contracts needed for the recovery must be developed by the department with the Purchasing Department, and ensures fees and retainers are paid Solid liaisons must be established with law enforcement, emergency services organizations, and contractors Disaster recovery coordinator, facility managers, and disaster response team work to establish these liaisons, as well as maintain the relationships over the long term

Implementation activities

Implementation tasks Many activities may be broken down into specific tasks assigned to employees or departments that are not part of the planning team

Establishing an Implementation Schedule Disaster recovery planning team establishes an implementation schedule for completing each activity in the plan Available resources, geography, and other factors will influence the speed of this schedule The disaster recovery planning coordinator and planning team must monitor the progress of the implementation A monthly report of accomplishments and activities that are behind schedule should be compiled by the coordinator The team may modify the schedule as conditions warrant, or suggest acceleration to various departments The planning team should bring obstacles to the attention of executives so that the obstacles can be cleared by the influence of the executive

Sample implementation schedule

Distributing the Disaster Recovery Documentation The plan must be distributed during the implementation, rehearsal and testing phases Disaster recovery plan documents include all the written analyses, policies, and procedures that employees and contractors should follow when responding to a disaster Organizations should not rely on just one method to make documents available to response teams As long as the intranet web servers function, they are acceptable for distributing disaster recovery plan documents Each distribution method has unique advantages and disadvantages

Distribution alternatives

Assessing the Value and Effectiveness of Mitigation Steps Mitigation steps are used to reduce the impact of system failure or disruption of operations Many of these steps are common practices for managing assets or business processes Such steps include backing up computer files to mitigate the consequences of disk or system failure The exposure inventory and risk assessments collected information on mitigating and avoiding business disruptions All mitigation steps must have a sound economic value Table 9-6 illustrates that if power is lost nine times per year, the return on investment (ROI) for using a UPS to protect the server is about 15 months

Analysis of the value of UPS

Assessing the Value and Effectiveness of Mitigation Steps Determining what kind of data back-up systems an organization should use is more difficult than analyzing the benefits of a UPS System backups are certainly necessary to preserve computer files and databases The selection of particular back-up systems depends on a number of factors

Analysis of the value of data backup systems

Assessing the Value and Effectiveness of Mitigation Steps After determining how much money could be saved The planning team can examine what types of data back-up systems to put in place How much the organization should spend for them The planning team should address several questions before selecting a back-up system How resilient to failure is the back-up system? Can it be used for more than one system or application, thus improving ROI? What level of disaster does the back-up system help mitigate (e.g., catastrophic, major, or minor)? How much does it cost to deploy the back-up system? How much IT staff time is needed to maintain the back-up system? The planning team should use ROI analyses to evaluate mitigation steps that make economic sense

Managing Internal and External Awareness Campaigns As an organization develops and implements a disaster recovery plan, it needs to make employees highly aware of the plan During training, employees should learn the details of the plan and learn their roles and responsibilities during disaster response The goal of the awareness program is to indoctrinate employees about the importance of disaster response and recovery Depending on an organization’s resources, there are several ways to increase awareness during plan implementation

Using Existing Channels of Communication Organizations often have employee relations programs, customer relations management systems, and business partner communications that can help build awareness Some forms of communication include Employee newsletters Bulletin boards Motivational posters Intranets with employee information sections E-mail announcement lists Customer relations e-mail newsletters and bulletins Business partner Web sites Corporate Web portals with sections for employees, customers, and business partners

Building Awareness Among Employees Organizations can use regularly scheduled department or work group meetings to call attention to disaster recovery planning efforts A series of announcements that department managers and supervisors can use in their meetings may include A basic description of disaster recovery planning The mission statement of the planning team The status of disaster recovery planning The status of implementing the recovery plan The schedule for disaster recovery training The schedule for testing recovery procedures

Building Awareness Among Customers and Business Partners Managers of the Customer Relations Department can build awareness among customers through newsletter articles, e-mail bulletins, or announcements at meetings Channel managers or product managers can build similar awareness among business partners Bulletins and announcements to both customers and business partners should include the following materials Basic description of disaster recovery planning How the organization works with customers or business partners to develop recovery procedures How the disaster recovery plan can benefit customers or business partners What customers or business partners can expect when a disaster strikes Basic steps for customers or business partners to follow in a disaster

Launching a Training Program for Disaster Recovery The scope and depth of the training program depend on the size and type of the organization Training must be developed for several levels of employee involvement Training with local emergency organizations is also advisable General broad training should be developed from the overall plan, for managers, supervisors, or all employees More specific training modules directed toward middle managers, supervisors, and disaster response teams These modules include training on how teams should be organized, along with activities that require managers and employees to be involved Some specialized training may also be necessary for certain special procedures

General disaster recovery training modules

Specialized training modules

Training modules for special disaster recovery procedures

Elements of Disaster Recovery Training Modules Most of the material required to develop a training program should already be included in the disaster recovery plan The plan documentation may not always be easy to convert to training material The training modules should contain several elements that are presented in different formats

Elements of disaster recovery training modules

Launching a Training Program for Disaster Recovery The disaster recovery planning team should watch and approve training presentations before they are given to the entire organization Overheads and slides used during disaster recovery training should look professional and be easy to read from all parts of the training rooms When trainers use sections of the disaster recovery plan in their training, they should organize the sections separately for each training module An evaluation form should inquire about the overall quality of the training, as well as the quality of materials used during training The overview of the recovery plan is designed for all employees, and should be included in all training modules The overview should last about one hour; it should focus on what is expected from employees during a disaster, and how they should report to supervisors or middle managers

Training for Executives Training modules designed for executives should be tightly structured It should include only as much detail as necessary to explain what is expected of them during a disaster Table 9-12 shows a recommended training session for executives The training is designed so that sessions can be held independently, grouped for the convenience of executives, or delivered in a single day

Disaster recovery training for executives

Training for Middle Managers Middle managers generally have far more extensive roles in disaster response and recovery than executives Their recovery training needs to cover topics in greater depth Table 9-13 shows a recommended training session for middle managers Sessions can be held independently, grouped for the managers’ convenience, or delivered in a three-day training session

Disaster recovery training for middle managers

Training for Supervisors Supervisors generally have more extensive roles in disaster response and recovery than executives They work under the direction of middle managers to implement procedures or support a specific response team Disaster recovery training for supervisors needs to cover the same topics as that for executives, but not in as much depth as the training for middle managers Table 9-14 shows a recommended training session for supervisors Sessions can be held independently, grouped for the supervisors’ convenience, or delivered in a one-day training session

Disaster recovery training for supervisors

Training for Disaster Response Teams Training specific response teams is the most complicated aspect of disaster response and recovery training Response teams must be trained on much of the same material as executives and middle managers They must be extremely well trained in their own roles to ensure that disaster response proceeds smoothly Training modules for specific response teams should provide in-depth coverage of procedures, so that team members fully understand their responsibilities in a disaster All response team members should attend disaster recovery training for middle managers, as well as specialized training designed for their team Table 9-15 shows recommended training sessions for specific disaster response teams

Training sessions for specific response teams

Training for Employees All employees should be required to attend training that is appropriate for their management level and participation on response teams Disaster recovery coordinators should work with the Human Resources and Training departments to ensure that trainers receive a list of all employees who are scheduled to attend specific modules Trainers should record attendance on a class roster and return it to the office that schedules training

Chapter Summary The implementation plan affects all the departments in an organization The plan must be managed step by step, and progress must be evaluated on a scheduled basis The activities required to implement a disaster recovery plan range from directing management to establishing liaisons with local law enforcement and emergency services The disaster recovery planning coordinator and the planning team assign responsibilities for implementing the plan The coordinator takes the lead role in monitoring and evaluating the progress of implementation

Chapter Summary Once responsibilities have been assigned for specific activities and tasks, the disaster recovery planning team needs to establish an implementation schedule for completing each activity in the recovery plan The disaster recovery plan must be distributed and made available during implementation, test and rehearsal steps, and thereafter Organizations should not rely on just one method to make documents available to response teams

Chapter Summary All mitigation steps must have sound economic value As an organization develops and implements a disaster recovery plan, it needs to make employees highly aware of the plan The disaster recovery training plan is an essential element of being prepared for a disaster The scope and depth of the training program depend on the size and type of the organization Training must be developed for several levels of employee involvement Training with local emergency organizations is also advisable