Measuring Results In Pay For Performance Cleanups Brian Dougherty Florida Department of Environmental Protection.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Radiochemical Methods and Data Evaluation
CP Chapter 4 Schedule Planning.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Pay-For-Performance in Oklahoma The Oklahoma Experience Presented by: Richard McKay Petroleum Storage Tank Division.
Power Purchase Agreements Owners Perspective Matt Gudorf – UC Irvine Campus Energy Manager
Common Sense For Cleanups: Pay For Performance William H. Foskett OUST/USEPA/HQ December 5, 2000.
Microsoft Project 2010 Dr. Nouh Alhindawi Jadara University.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
OneOffice has provisions to add Pay Items for modifications to the Contract by Supplemental Agreements, Change Orders and for work covered by Standard.
© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
Managing Buffets, Banquets, and Catered Events
Single -Subject Designs - Ch 5 “Data collection allows teachers to make statements about the direction and magnitude of behavioral changes” (p. 116). In.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Module 2: Basic analyses. Module 2: Learning Objectives  Identify approaches for setting targets  Understand common analyses that calculate program.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Project Management For Class Plan Projects CAS Special Interest Seminar on Predictive Modeling October 11-12, 2007 Jonathan White.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
1 Focus Discussion: Working with a Contractor Chris Lee, TAMS Center.
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
Chapter 1 Project Management Concepts
1 Facilitating Reuse at RCRA Sites: Innovative Technologies for Groundwater Characterization and Cleanup Introduction Walter W. Kovalick Jr., Ph.D. Associate.
Mississippi State Department of Health
Chapter 1 Project Management Concepts. 22 Learning Objectives Definition of a project and its attributes Key constraints within which a project must be.
11-1 PROJECT CONTROL Project Control Defined Types of Control Systems Need for Balance in Control Systems Control of Creative Efforts Changes and Change.
Session #65 Draft Results of Quality Assurance Program Data from Award Year David Rhodes and Anne Tuccillo.
Lifecycle of Service and Salaries Division of Retirement and Benefits.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
T.L. Martin & Associates Copyright © 2008 Chapter 1 Fundamentals of Scheduling T.L. Martin & Associates, Inc Office Park Drive Gaithersburg, Maryland.
 Performance assessments can:  help identify potential problems in the program  help identify areas where streamlining the process could be useful.
WORK ZONE DELAY ESTIMATION Work Zone Management, Accelerated Construction, and Smart Work Zones TEAM Monthly Meeting November 16, 2004 Luis Porrello, Ph.D.,
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Quality Assurance How do you know your results are correct? How confident are you?
Tier I: Module 5 CERCLA 128(a): Tribal Response Program Element 4: Verification & Certification.
Paying for a Vehicle Unit 9. Payment Options Cash – Pay for the full cost of the car with the money you have – Not usual, but a good option if you have.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section A 1.
Guidelines Revisions Defining What RTF Means by “Savings” December 17,
Kentucky Department for Environmental Protection HB 465 Revitalizing Kentucky’s Communities.
1 Analysis of in-use driving behaviour data delivered by vehicle manufacturers By Heinz Steven
Cost of Credit 2015 Educurious Partners--All rights reserved UNIT 3 LESSON 8.
What is the average cost of a brand new car? $31,252.
Designing a Training Program Worthy of Indoor Cycling 2.0 Carl Foster, Ph.D., FACSM Department of Exercise and Sport Science University of Wisconsin-La.
Chapter 1 Project Management Concepts
Economics INFLATION and Its AFFECTS. Measuring the Cost of Living Inflation ( π ) –occurs when the economy’s overall price level is rising. Inflation.
Agribusiness Library LESSON L060020: EVALUATING SOURCES OF CREDIT.
3 - 1 Holding The Contractor to 105% of the Target Spread Rate!
November 17, 2008Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
Third-Party Solar Financing Options in New Hampshire 1.
Emission source sampling and monitoring Topic 6 Ms Sherina Kamal May
UGA Restricted Account Management and Closeout May 10th, 2007.
Car Shopping. Costs of Owning a Car Depreciation Interest on loan Insurance Registration fees, license, taxes Gas Oil/fluids Tires Maintenance and repairs.
GPRA One State’s Perspective Arthur Shrader UST Program South Carolina DHEC.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Lesson four living on your own presentation slides 04/09.
Teens lesson four living on your own. the costs of moving moving-in costs can include: Rent for first month Rent for last month Cleaning deposit Security.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Practical Math: Credit Cards Chapter 7 Notes. Vocabulary credit card: a card that allows you to buy items now and pay later monthly statement: form like.
Creating a Work Breakdown Structure with Microsoft Project.
Pay for Performance in Florida Brian Dougherty Florida Department of Environmental Protection The Past, Present & Future of PFP in Florida.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
PROJECT CONTROL Project Control Defined Types of Control Systems
Designing Your Fitness Program
Environmental Acquisition Strategy Performance-Based Contracting
Noticing Package NOTICING PACKAGE Melike Altun, EM.
Integrated Cyber October 16-17, 2017
Updating the System Milestones
Chapter 1 Project Management Concepts
Presentation transcript:

Measuring Results In Pay For Performance Cleanups Brian Dougherty Florida Department of Environmental Protection

Monitoring Cleanup § PFP Milestones l Pre-determined events when payments are made l Usually based on a subset of the data § Cleanup Target Levels l Satisfy state requirements for all contaminants and all media

PFP Milestones § Typical Breakdown l 45% System Startup l 10% Contaminants reduced by 50% l 10% Contaminants reduced by 75% l 10% Contaminants reduced by 90% l 10% Reach CTLs (all media and contaminants) l 15% Hold CTLs and Close Site

3333W??3 Components of Monitoring PFP Cleanup Progress ¬ Establish the baseline. ­ Determine the endpoint. ® Select key monitoring wells. ¯ Specify perimeter wells. ° Calculate milestones. ± Provide for split sampling. ² Provide for verification wells and borings. ³ Maintain cleanup levels.

¬ Establish The Baseline § This is point from which all progress will be measured. l Should be very recent data or first task in PFP agreement, not based on previous data. § Sample several wells to get good snapshot of the site. l Specify analyses and analytes of interest.

­ Determine the Endpoint § Strict Resource Protection. l High cost, long duration but clean site. § Site Specific Target Levels. l Lower cost, shorter duration. l Monitoring period may extend cleanup.

Endpoint Options §Strict resource protection. l High Cost, Clean Site. §Site Specific Levels with monitoring. l Long term monitoring leads to delayed payment. Payment delay causes cost to increase. Natural attenuation not a performance issue. §Site Specific levels with no monitoring. l Low cost, short duration. l No assurance if site rebounds

® Key Monitoring Wells §Milestone measurement points. §Carefully choose a small, representative number of wells. l Consider how you will measure progress. §Clean wells don’t add to information. §Allow for changes if site conditions change.

Corner Gas Station Key Monitoring Wells

¯ Perimeter Wells §Important to make sure plume doesn’t move away. §Keep to a minimum. l More wells may provide more comfort, but at a higher price.

Corner Gas Station Perimeter Wells

° Milestone Measurement §Average of Key Monitoring Wells. l Sensitive to large change in single well. l Less indicative if key wells differ widely in contaminant levels. §CoC Reduction in each well. l Precise measure of progress. l Harder to make progress in well with low contaminant levels. §Mass Reduction.

Milestone Measurement

± Split Sampling §Important for verifying progress and payments. §Require prior notice of any milestone sampling event. §Tie payment terms to agreement between split samples.

² Verification Wells & Borings §Important to confirm site is clean and not just that certain wells are clean. §Withhold final payment pending results. §Allow contractor to split samples.

³ Maintaining Cleanup Levels §Minimum time period (State Requirement.) l Typically 6 to 12 months §Provision for spikes and rebounds. l Resample to confirm? l Require corrective action? l Does monitoring period reset?

Pay For Performance Monitoring §Goal: Pay for Environmental Results. l Measure real reductions in contaminant levels. l Monitor cleanup progress. l Confirm results. §Provide Defined Goals for: l PFP Payments. l Meeting State Standards.