Nuclear Power Plant Issues at the CPUC Senate Hearing April 14, 2011 Gurbux Kahlon Program Manager Rate Regulation, Analysis and Policy Branch Energy Division.

Slides:



Advertisements
Similar presentations
The CPUC’s Role in San Onofre Nuclear Plant Decommissioning Presentation to the California State Senate August 13, 2013 Edward Randolph Director, Energy.
Advertisements

Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
1 PG&E Bankruptcy Proposed Settlement Todd Edmister Staff Counsel Public Utilities Commission September 3, 2003.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
David Howarth MRW & Associates Oakland, California 1 JUST THE FACTS: RESOURCE PLANNING AND PROCUREMENT INDEPENDENT ENERGY PRODUCERS ANNUAL.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
1 Central Coastal California Seismic Imaging Project California Energy Commission Workshop Dr. Stuart Nishenko PG&E April 27, 2015.
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
Carbon Capture and Storage State Legislation Kathy G. Beckett Midwest Ozone Group January 22-23, 2009.
DRA Advocacy Joe Como, Acting Director. 2 DRA Facts The Voice of Consumers, Making a Difference! 3  History: CPUC created DRA (formerly known as the.
OVERVIEW OF THE MINNESOTA PUBLIC UTILITIES COMMISSION Presentation to the Itasca Economic Development Corp. February 14, 2007 By LeRoy Koppendrayer, Chair.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Triennial Plan 2: Legal Framework. About Us  Efficiency Maine is an independent trust – Accounts and administrative responsibilities transferred from.
California Energy Commission Workshop Nuclear Power Plant Issues
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
® Investor Meetings June 7-8, 2010 PG&E Corporation.
Energy Production and Use in California Source: California Energy Commission
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
PG&E’s Solar Choice Programs
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
Limited Proceedings Water & Wastewater Reference Manual1.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
July 9, 2010, AB 920 Workshop Pacific Gas and Electric Company.
PG&E’s Oakley Application (A ) Yuliya Shmidt, lead Selena Huang, analyst Candace Morey, attorney May 23, 2012 Image of proposed Oakley plant from.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
DRA Perspective on What Recycled Water Applications from Investor- Owned Utilities Should Contain and How They Should be Evaluated CPUC Water Recycling.
Leading the Way in Electricity SM SOUTHERN CALIFORNIA EDISON ADVANCED TECHNOLOGY California Senate Hearing on PIER March 1, 2011 SCE Assessment of State.
West Contra Costa USD Presentation to the Facilities Subcommittee December 11, 2012.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Integrated Planning & Environmental Affairs Energy Agencies in California.
1 Review of CPUC Role with the Public Interest Energy Research (PIER) Program on Natural Gas Briefing for California Senate Energy, Utilities and Communications.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
R “Postage Stamp Rates” OIR LIOB Meeting – January 2012 CPUC – Division of Water and Audits.
CPUC Public Agenda 3256 Thursday, June 24, 2010, 10:00 a.m. 505 Van Ness Ave, San Francisco Commissioners: Michael R. Peevey Dian M. Grueneich John A.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
CEC Contingency Planning for Diablo Canyon Rochelle Becker Alliance for Nuclear Responsibility April 27, 2015.
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
NARUC SUMMER COMMITTEE MEETINGS Committee on Water Agenda California Regulatory Initiatives Case History – California American Water B. Kent Turner – President.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
CPUC Public Agenda 3261 Thursday, September 23, 2010, 10:00 a.m. 505 Van Ness Ave, San Francisco Commissioners: Michael R. Peevey Dian M. Grueneich John.
Resolutions E-4168 and E-4157 Southern California Edison (SCE) requests approval of contracts with a new wind facility and a new solar photovoltaic facility.
CPUC Public Agenda 3247 Thursday, January 21, 2010, 10:00 a.m. 505 Van Ness Ave, San Francisco Commissioners: Michael R. Peevey Dian M. Grueneich John.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Electricity Outlook: Summer of 2005 and Beyond." Before the Senate Energy, Utilities and Communications Committee February 22, 2005 Steve Larson Executive.
1 PG&E’s Humboldt Bay (HBPP) & Diablo Canyon (DCPP) Power Plants Decommissioning process and replacement power April 14, 2011 Loren Sharp.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Renewable & Alternative Power Implementation of the California Renewables Portfolio Standard February 6, 2007 Senate Energy, Utilities, and Communications.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Mike Jaske California Energy Commission
Spent Fuel Pool Instrumentation NRC Order EA
City Council September 17, 2018 Item 16
Presentation transcript:

Nuclear Power Plant Issues at the CPUC Senate Hearing April 14, 2011 Gurbux Kahlon Program Manager Rate Regulation, Analysis and Policy Branch Energy Division California Public Utilities Commission (CPUC)

2 Authority of the CPUC and NRC The CPUC has jurisdiction over utility cost recovery related to existing nuclear power plants owned by the investor-owned utilities (IOUs). Nuclear power plant safety and operational issues are primarily and directly under NRC jurisdiction.

3 CPUC jurisdictional issues CPUC has direct and primary jurisdiction in the following areas: Approving Certificate of Public Convenience and Necessity (CPCN) if a CPUC-jurisdictional utility seeks to build a nuclear power plant. Reviewing and approving major capital additions to a nuclear plant for cost recovery. Reviewing costs of the plant and setting cost recovery rules after the plant goes into operation. Staying on top of the safety issues as they arise. Ensuring that there are sufficient funds to decommission the plant after its operating life.

4 Nuclear power plants owned by California IOUs became operational in the 1960s and 1980s.

5

6 San Onofre Generation Station for Local Area Reliability SONGS is in the LA Basin “Local Capacity Requirement Area” defined by CAISO The LA Basin Local Area has 12,309 MW of capacity. It requires 10,600 MW to maintain reliability. SONGS, at 2,340 MW, is critically located in the southern part of this Local Area. It provides grid operational stability in addition to its capacity. Source: CAISO 2012 Draft LCR Study Results at

7 Diablo Canyon Power Plant for System Reliability DCPP is not located in a transmission constrained area; it does not fall into a Local Capacity Area defined by CAISO. DCPP is strategically located but is not critical for grid stability. Source: CAISO Once-Through-Cooling Scenario Analysis at

8 Cost Recovery for Nuclear Generation at CPUC Non-fuel operating costs are typically recovered in general rate cases. Major capital additions such as steam generator replacements for SONGS and DCPP were addressed in separate proceedings. Fuel costs recovered through Energy Resource Recovery Account (ERRA) proceedings. Decommissioning costs recovered in the Nuclear Decommissioning Cost Triennial Proceeding. Other proceedings are addressing cost recovery for seismic studies and relicensing DCPP and SONGS.

9 Enhanced Seismic Safety Studies at Diablo Canyon Enhanced 2-D and 3-D seismic studies are being undertaken by PG&E at DCPP pursuant to recommendations made by the CEC in its report pursuant to AB 1632 (2006) to assess the Shoreline Fault. SCE is considering similar seismic studies at SONGS. CPUC approved $16.7 million for Diablo Canyon enhanced studies in D PG&E’s preliminary assessment is that the Shoreline Fault would not exceed an earthquake of magnitude 6.5. DCPP is currently designed to withstand a 7.5 magnitude earthquake based on the Hosgri Fault. The recent northeastern Japan earthquake was magnitude 9.0. In the same decision, the CPUC created an Independent Peer Review Panel (IPRP) with participation of other state agencies such as the CEC, CA Seismic Safety Commission, CA Coastal Commission, and the CA Geological Survey, to review PG&E’s plans and analyses of its enhanced seismic studies.

10 DCPP License Extension Related Activities PG&E filed application at NRC in November 2009 requesting to extend operating licenses for DCPP Units 1 &2 to 2044 and 2045 respectively (20-year extension). Decision expected in PG&E filed application at CPUC (A ) requesting recovery of $85 million to obtain State and Federal approvals related to license renewal. PG&E, TURN, and DRA filed a settlement which would allow PG&E to recover up to $80 million for license renewal activities, and to seek separate recovery of additional amounts incurred, subject to reasonableness review, in its next GRC. The settlement is opposed by the Alliance for Nuclear Responsibility. A hearing scheduled for April 13th to address whether the settlement should be adopted and whether funding should be authorized before seismic studies at Diablo Canyon are completed, has been removed from the CPUC calendar by assigned ALJ ruling to be reset later. According to PG&E’s application, relicensing will have substantial benefits for ratepayers (NPV $3.8 billion --$16.3 billion in various scenarios). On April 10, 2011, PG&E informed the NRC and the CPUC that it believes it is prudent to complete seismic studies at DCPP prior to issuance of the coastal consistency certification and the renewed NRC license, if approved.

11 Enhanced Seismic Safety Studies at SONGS In its Test Year 2012 General Rate Case (A ) SCE requested: $29 million for studies related to SONGS, of which $21 million is for enhanced 2-D and 3-D seismic studies similar to PG&E’s efforts at Diablo Canyon. Approximately $7 million for efforts to continue a feasibility study related to a 20-year license extensions for SONGS Units 2 and 3. Commissioner Simon’s March 1, 2011, scoping memo in A directs SCE to seek recovery of the costs identified above through separate applications. SCE is expected to file a request at the NRC in 2013 for 20-year license extensions at SONGS. Licenses to operate SONGS Units 2 and 3 would be extended to 2042, if approved by the NRC. Assigned commissioner’s ruling instructs SCE to make such request in a separate application.

12 DCPP and SONGS Replacement Power Cost DCPP and SONGS are among the lowest cost sources of power at present. For 2011, cost of DCPP power is $502 million. Cost of SONGS power in 2012 is $322 million. Based on preliminary rough estimates, annual replacement cost of energy for DCPP and SONGS would be approx. $650 million each for the period if the utilities are able to buy replacement power at the current average generation rate. However, market price could go up if supply declines with the closure of DCPP and SONGS. If replacement energy is supplied by combined cycle natural gas plant, the annual cost of energy may be over a billion dollars annually for each utility. The cost could be higher still if replaced with RPS sources of power. In addition to replacement energy, utilities will need to procure replacement capacity to maintain reliability pursuant to the Resource Adequacy program. Preliminary estimates for annual replacement capacity cost are $112 million for DCPP and $425 for SONGS. DCPP is strategically located but is not critical for grid stability. SONGS is critical for grid stability. It supports power deliveries in Orange County and points north. CAISO is likely to need additional physical generating capacity in that vicinity to replace SONGS. Air restrictions in the South Coast Air Quality Management District, and local opposition to building four new power plants in Orange County could significantly delay any replacement to SONGS.

13 Process for Review and Approval of Replacement Power The utilities have approval, under PUC decisions and PU code section to enter into contracts for energy and capacity for less than five years without need for a separate PUC approval, if they follow the rules in their procurement plans. In order to replace power (energy and capacity) from DCPP and SONGS, the IOUs will need to issue competitive solicitations governed by CPUC power procurement rules. Replacing power from DCPP and SONGS will take one to two years if new generation is not required. The procurement process to build new generation resources to replace SONGS will take five to seven years if air and land use permits can be obtained. Contracts longer than 5 years require a separate application and approval by the PUC which can take approximately a year. These long term contracts generally involve new generation.

14 Nuclear Decommissioning Trust Funds D established nuclear decommissioning trusts for funding future decommissioning of the utilities’ nuclear units. A 5-member committee with a 5-year term is appointed to oversee management of the fund. The committee appoints fund manager. 2 officers/directors are nominated and confirmed by the utility; 3 not affiliated with the company nominated by the company but confirmed by the CPUC. Decommissioning charges are shown on customer bills as a separate line item. For PG&E, the current rate is $ /kwh. For SCE, the current rate is $ /kwh. The charge is set in the Nuclear Decommissioning Cost Triennial Proceeding (NDCTP) every 3 years.

15 Nuclear Decommissioning Cost Estimates D in Phase 1 of the most recent Nuclear Decommissioning Cost Triennial Proceeding (A , et al) adopted: $207 million for SONGS 1 decommissioning work done from 2005 – 2008, $184 million for remaining decommissioning work at SONGS 1, and $3.7 billion estimate for decommissioning SONGS 2 and 3; $709 million estimate for SCE’s share of PVNGS decommissioning; Contributions to SONGS 2 and 3 trusts of $23 million for SCE and $8 million for SDG&E; Decommissioning cost estimates of $1.8 billion for DCPP and $500 million for Humboldt 3; and $14 million contribution to Humboldt 3 trust, and $9 million contribution to DCPP trust; Established an independent panel to assess parameters for future decommissioning cost studies.

16 Trust Fund balances as of February 2011 Humboldt Bay Unit 3 has a balance of $305 million. This is after PG&E has already withdrawn $200 million for work in progress. DCPP Units 1 and 2 have a balance of $832 million and $1,119 million respectively. PG&E has a total of $ billion in nuclear decommissioning funds. SCE’s portion of SONGS Units 1, 2 and 3 have balances of $ 212 million, $1,173 million and $1, 368 million which adds up to a total of $2.753 billion for SCE in nuclear decommissioning funds. SONGS 1 decommissioning is in progress and approx. $800 million has already been withdrawn. Remaining balance determined to be sufficient for SONGS 1. No increase has been sought by SCE in the 2009 NDCTP. SDG&E’s portion of SONGS Units 1, 2, and 3 have balances of $108 million, $314 million, and $375 million, for a total trust fund market value of $797 million.

17 CPUC reviewing and considering additional rules for Nuclear Decommissioning Trust Funds Phase 2 of the NDCTP (A , et al) is addressing nuclear trust management, selection and investments. Trust fund administration, process, prior concerns, segregation of funds for long-term storage and decommissioning, management fees; Historic performance of trust funds; Trust fund committee selection process, members, roles; Investments, asset allocation studies, equity limitations, guidelines; Investment strategies, alternative asset classes; Advance withdrawal and interim disbursement process.

18 Geophysical Characteristics of Fukushima March 2011 Event The major damage to the nuclear power plants in Japan was caused by the tsunami following the 9.0 earthquake, which flooded the backup generators for the pumps that supply cooling water to the reactors and cooling ponds for spent fuel. The March 2011 tsunami in Japan flooded the Fukushima nuclear plant with sea water at about 30 feet above sea level. Diablo Canyon Power Plant is about 40 feet above sea level, and its emergency diesel generators are about 85 feet above sea level. This plant was designed for a 7.5 earthquake and a 25 foot tsunami wave. The SONGS units have a 30 ft high sea wall and the emergency diesel generators are approximately 30 feet above sea level. This plant was designed for a 7.0 earthquake and a 25 foot tsunami wave. The December 2004 Indian Ocean tsunami rose water levels by about 100 feet in Indonesia and 40 feet in Thailand. PG&E’s seismic studies at DCPP include a tsunami analysis based on the 1964 Alaska tsunami resulting from a 9.2 earthquake.

19 Diablo Canyon Independent Safety Committee The CPUC created the Diablo Canyon Independent Safety Committee in D when resolving ratemaking issues for DCPP - a restated charter for the committee was approved in D The three member Safety Committee assesses safety of DCPP operations and makes recommendations for the plant’s safe operation; The Safety Committee has no responsibility or authority for plant operations, and does not direct PG&E personnel; The Safety Committee conforms to all applicable federal laws, regulations, and NRC policies; The CPUC approves candidates for appointment to the Safety Committee; the Governor, Attorney General, and Chair of the CA Energy Commission each appoint one committee member. The NRC is responsible for assuring the safety and security of all U.S. nuclear power plants including DCPP. The Safety Committee reviews NRC reports, monitors NRC inspections, and periodically meets with NRC inspectors at DCPP.

20 Cooling Systems and State Water Board Policy DCPP and SONGS use once- through-cooling systems that the State Water Resources Control Board has stated do not meet Federal law requiring best available technology. The Water Board has ordered PG&E and SCE to conduct special studies to investigate alternatives. –Studies will consider factors such as engineering, space, and permitting constraints, cost and public safety.

21 Contracts for Uranium Enrichment Services require CPUC Approval The CPUC approves utilities’ contracts for uranium enrichment services. Examples include: PG&E’s contract with AREVA, LLC., a U.S. company. Uranium enrichment services for delivery to DCPP from 2015 through Contract approved by CPUC Resolution E- 4322, May 6, 2010; PG&E’s contract with URENCO Ltd., an international company. For enriched uranium delivery to DCPP from 2014 through Draft Resolution E-4398 expected to be on CPUC April 14, 2011 agenda; Review of AREVA and URENCO contracts done in accordance with PG&E’s conformed 2006 Long-Term Procurement Plan approved by Resolution E-4177, June 2008.

22 Contact Information For Follow Up Questions Gurbux Kahlon Program Manager Rate Regulation, Analysis and Policy Branch Energy Division