Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.

Slides:



Advertisements
Similar presentations
In this presentation you will:
Advertisements

MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Yongho Kim Aug 2, : My Job TLM_ReceiverRS decoderGSEOS Nothing.. Interface - Serial line - TCP/IP connection with MPS Functions - CCSDS frame,
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
ISUAL Instrument Software S. Geller. CDR July, 2001NCKU UCB Tohoku ISUAL Instrument Software S. Geller 2 Topics Presented Software Functions SOH Telemetry.
DCH Requirements b Process at a rate fast enough to maintain all data storage and command handling tasks. b Have sufficient storage space to hold the OS,
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
IES Flight Software J. Hanley / P. Mokashi May 29, 2013.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
1Sep 30-Oct 1, 2009EFW I-CDR Instrument Critical Design Review EFW Flight Software Peter R. Harvey 2009 Aug 31 RBSP Radiation Belt Storm Probes RBSP Radiation.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
THEMIS PROJECT NAS UCB, June 2003 Science Operations Tim Quinn 4 June 2003.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
ISUAL Data Formats & Science Data Processing S. Geller.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.
THEMIS SOCScience Data Products − 1March 29, 2006 Science Data Products Timothy Quinn.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE-
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
THEMIS IDPU FSW 6/23/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey.
THEMIS IDPU PDRPCB- 1 UCB, October 16, 2003 IDPU Power Control Board (PCB) Peter Berg University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
THEMIS SOCScience Data Products − 1December 10, 2005 Data Products Timothy Quinn.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
DATA PROCESSING UNIT (IDPU)
Operational Flight Software
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
University of California - Berkeley
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Command & Data Handling
University of California - Berkeley
INSTRUMENT DATA PROCESSING UNIT (IDPU)
ISUAL Associated Electronics Package
Preliminary Design Review
Operational Description
THEMIS INSTRUMENT TRAINING
THEMIS FM4/FM5 INSTRUMENT SUITE
CubeSat vs. Science Instrument Complexity
Presentation transcript:

Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU

Instrument TrainingIDPU - 2 UCB, Dec 6, 2006 Introduction The IDPU is the instrument interface to the spacecraft. There are 3 main boards in the IDPU The Low Voltage Power Supply takes the spacecraft provided 28V and converts it into the voltages required by the instruments. The Power Control Board switches the supplies to the instruments and provides some over current protection. It also switches the spacecraft supplied Actuator supply to the mag booms / EFI. The Data Control Board contains the processor and memory where the instrument data is stored before being telemeted to the spacecraft. Overview

Instrument TrainingIDPU - 3 UCB, Dec 6, 2006 IDPU also has most of the electronics for the other instruments – the FGM (FGE), EFI (BEB & DFB), SST (DAP) as well as the particle instrument data processing board (ETC). Overview

Instrument TrainingIDPU - 4 UCB, Dec 6, 2006 IDPU Photo Power Supply Interface Data Interface Actuator Supply Interface DAPPCBBEBLVPSDFBDCB

Instrument TrainingIDPU - 5 UCB, Dec 6, 2006 IDPU Power On On power on of the IDPU: The reset counter will display a random number until cleared by the IDPUCLEAR command. The FSW version will read 0x21. This the version of software in the one time programmable PROM. If there is a ‘good’ program in the EEPROM it will be loaded. The FSW version will then change. Currently this is version 0x42. The IDPU starts in SAFE mode

Instrument TrainingIDPU - 6 UCB, Dec 6, 2006 IDPU Modes IDPU Init Script clears errors and puts the IDPU in Normal Mode. IDPU MODES SAFE – default on power up, and mode before power down. NORMAL – standard operating mode, enables instrument switching. ENGINEERING – Deployment mode, for EFI and Mag Boom deployment & ESA cover opening. LOW POWER – All instruments off except FGM.

Instrument TrainingIDPU - 7 UCB, Dec 6, 2006 Instrument Power On Before powering on an Instrument the switched needs to be enabled. Then the Instrument can be powered on.

Instrument TrainingIDPU - 8 UCB, Dec 6, 2006 IDPU Voltages Instrument Voltages FGM: +2.5VD, +5VD, ±5VA, ±8VA SCM: ±10VA (also requires EFI to be powered) EFI: No voltage monitors, only total EFI board, and individual axis floating supply current monitors. SST: +2.5VD, +5VD, ±5VA ESA: +28V, ESA has it’s own DC-DC power converter. SMA Supply is used for the ESA Cover and SST Attenuators. Note when not in use and the SST is powered there maybe a voltage present.

Instrument TrainingIDPU - 9 UCB, Dec 6, 2006 IDPU Current Draw IMON_IDPU current monitor should indicate total current drawn on IDPU supplies – all LVPS supplies except ESA and EFI. IDPU current monitors – there is no current monitor for +8V, current is drawn from the +10V supply.

Instrument TrainingIDPU - 10 UCB, Dec 6, 2006 IDPU Commands Listed in the thm_fsw_003_ctm.xls in the commands tab. See handout…

Instrument TrainingIDPU - 11 UCB, Dec 6, 2006 IDPU Telemetry IDPU produces Housekeeping data only. There are three types of IDPU housekeeping packet: APID 404 – IDPU Housekeeping. APID 406 – Instrument Housekeeping. APID 407 – Memory Dump Packet.

Instrument TrainingIDPU - 12 UCB, Dec 6, 2006 SSR ITOS Page Packets assigned to memory – not packets completed. When playing telemetry packet minimums prevent the play out of all packets from Engineering, Quick Look and Survey. Burst memory plays all packets. SSR Mode – SLOW, FAST, PARTICLE BURST, WAVE BURST.

Instrument TrainingIDPU - 13 UCB, Dec 6, 2006 ETC The ETC takes the data from the ESA and SST instruments and formats into the distributions and moment data that are telemetered to the ground. The ETC controls the way it counts the particles by using tables that say how to bin particular particle counts from each of the instruments. These tables are stored in the IDPU EEProm and are uploaded using the 0x66?? command. Currently the version is 0x5? where ? is the table number. Table 50 is the largest and has all the tables the ETC needs to compute the moments and the default maps for SST and ESA. Note: If you load table 50 it will upload tables to both instruments! The other tables are for either ESA or SST.

Instrument TrainingIDPU - 14 UCB, Dec 6, 2006 Compression The IDPU compresses the science data to make full use of the downlink. It is expected that the compression ratio will be about 2. If you play data while the compressor is on, you will get corrupt packets.