Pharmaceutical Water Systems Alain Kupferman Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009.

Slides:



Advertisements
Similar presentations
Supplementary Training modules on Good Manufacturing Practices
Advertisements

Commissioning Approach Integrated Service Solutions
Supplementary Training Modules on Good Manufacturing Practice
World Health Organization
Radiopharmaceutical Production
© WHO – PSM Quality Control Laboratory Pharmaceutical Quality, Good manufacturing Practice & Bioequivalence Kiev, Ukraine October 2005 Maija Hietava.
WHO - PSM Water –part 3 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija Hietava M.Sci.Pharm Quality Assurance.
WHO - PSM Water for Pharmaceutical Use Water –part 2 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija.
Dialysis Water Treatment Systems
EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Scope  Service Department offers after sales service for products sold by EG Medical.
1 Reminder: Resistivity (ohms) is the reciprocal to conductivity (micro-Siemens)
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
Water for Pharmaceutical Use Water Purification Engineering Md. Saifuzzaman Associate Professor Pharmacy Discipline, KU.
EQUIPMENT VALIDATION.
Overview of Validation Requirements Pharmaceutical Industry
PLANT DESIGN (I) Prof. Dr. Hasan farag.
Innovative system for Haemodialysis Equipment Disinfection
Validation Part 2: Cleaning validation
World Health Organization
Pharmaceutical Water Systems
Supplementary Training Modules on Good Manufacturing Practice
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
VALIDATION OF WATER SUPPLY SYSTEM
UNIT 3.04 Career Opportunities By PresenterMedia.comPresenterMedia.com.
Personnel Basic Principles of GMP Workshop on
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Qualification of HVAC systems
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
Water | Slide 1 of 30 January 2006 Water for Pharmaceutical Use Part 3: Inspection of water purification systems Supplementary Training Modules on Good.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
World Health Organization
Basic Principles of GMP
Introduction to Equipment
Supaporn Phumiamorn Jan, 2006
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
Water for Pharmaceutical Use Part 2: Water purification engineering
ISO OPERATIONAL CONTROL
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
Module 1, Part 3: Process validation Slide 1 of 22 © WHO – EDM – 12/2001 Validation Part 3: Process validation Supplementary Training Modules on Good Manufacturing.
Module 19 | Slide 1 of 14 January 2006 GMP Inspection Process Types of GMP Inspection.
Basic Principles of GMP
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Module 1,, Part 5: Review and summary Slide 1 of 13 © WHO – EDM Validation Part 5: Review and summary Supplementary Training Modules on Good Manufacturing.
Critical Steps in Process Design
Pharmaceutical Water Systems
30/02/2008 Dept. of Pharmaceutics 1 Salient Features of Quality Assurance Dr. Basavaraj K. Nanjwade M.Pharm., Ph.D Associate Professor Department of Pharmaceutics.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
VALIDATIONS: TOWARDS RELAIBLE QUALITY OUTCOMES DR. SHIVPRAKASH MANAGING DIRECTOR SYNCHRON RESEARCH SERVICES PVT. LTD., INDIA.
Pharmaceutical Quality Control & current Good Manufacturing Practice
EU GMP Guide Annex 11 “Computerised Systems” Edwin Lindsey Understudy: Neil Fraser.
Tank Heating by Various Methods for Metal Finishing and Other Process Heating Applications OVERVIEW 1.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
BSB Biomanufacturing CHAPTER 11 GMP – Pharmaceutical Water
RO and standards Your title can go in a clear space
GOOD MANUFACTURING PRACTICE FOR BIOPROCESS ENGINEERING (ERT 425)
World Health Organization
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Author: Nurul Azyyati Sabri
Water for Pharmaceutical Use
Autotest – Calibrated Leak
Risk Assessment should include:
Quality Systems in a Production Facility
Subsea 100 Global Services Products Presentation
World Health Organization
Treatment – Plant Design
Piping and Instrumentation for Process Industries
Presentation transcript:

Pharmaceutical Water Systems Alain Kupferman Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009

2 |2 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 FACTORS CONTRIBUTING TO QUALITY PRODUCTS Raw Materials Personnel Procedures Validated processes Equipment Premises Environment Packing Materials Water for Pharmaceutical Use PW HPW WFI CS

3 |3 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 PREREQUISITES FOR OPERATION AND (RE)QUALIFICATION As usual…… Good design Good engineering Good execution Good operation Good documentation and Good maintenance

4 |4 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 DEFINING THE NEEDS Regulatory (Pharmacopeia) PW HPW WFI EU ? PICS ? FDA ? User requirements Data on raw water

5 |5 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 DEFINING THE NEEDS: WHICH TYPE OF WATER WHERE ? Regulatory (Pharmacopeia) PW HPW WFI EU ? PICS ? FDA ? Regulatory (EMEA)

6 |6 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 DEFINING THE NEEDS: WHICH TYPE OF WATER WHERE ?

7 |7 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 GMP + GEP Drainability : slopes Flow speed In-process controls, sampling points Valves and accessories Size of generator(s) and storage tanks Critical parameters handling Etc.

8 |8 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 USER REQUIREMENTS Quantitative data: how much when ? Installation type: IE, RO, double RO, EDI Multi-effect, thermocompression,.. Loop type and storage: hot, cold, mixed, multiple fixed or variable speed pump deadlegs, valve types, … Sanitisation: heat, chemical, ozone Materials: stainless steel ? + treatment Heat exchangers: type

9 |9 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 Critical parameters handling I C R A I=Indicate C=Control R=Record A=Alarm Base for instrumentation qualification QUALIFICATION ITEMS

10 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 QUALIFICATION ITEMS IQ Inspection of mechanical installation and documentation (manuals, data sheets, components certificates) System installed in accordance with P&I diagram Check of components (agree with description in components list) Gap between waste water and drain Dead legs in distribution system (6D, 3D, 1,5 D ???) FDA not having an unused portion greater in length than six diameters of the unused pipe measured from the axis of the pipe in use WHO Deadlegs in the pipework installation greater than 1,5 times the branch diameter should be avoided

11 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 GMP + GEP CALCULATION Size of generator(s) and storage tanks

12 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 QUALIFICATION ITEMS IQ Welding documentation (material certificates for pipes and fittings, FDA certificates for gaskets) Isometric drawings with weld numbers Welded seam documentation (machine protocols) Welder approval test certificate Pickling and passivation protocol Endoscopic photos Analytical certificate of inert gas

13 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 QUALIFICATION ITEMS OQ Calibration of measuring equipment (Pressure, temperature, conductivity) Leak test Operation of softener (residual hardness, regeneration) Operation of RO plant (flow rates, conductivity) Operation of bisulphite dosing (if required) Function of regulating circuits in RO plant Operation of ozone generator and ozone meter (ozone concentration) Operation of UV unit (Ozone concentration, intensity of light) System parameters and limit-value settings Flow rate (Reynolds value) Water quality (conductivity, microbiological situation, TOC)

14 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 QUALIFICATION ITEMS OQ Gradients in distribution system Drainability of distribution system Inspection of electrical hardware Emergency-off switch Analogue inputs and outputs Program steps disinfection softener, RO Program steps sanitisation softener, RO, EDI, loop Alarms Access rights, passwords

15 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 PERFORMANCE QUALIFICATION 3-phased approach Phase I (2-4 weeks) Water is not used for production purposes

16 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 PERFORMANCE QUALIFICATION 3-phased approach Phase II (2-4 weeks) Same sampling scheme as phase I Water can be used for production purposes

17 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 PERFORMANCE QUALIFICATION 3-phased approach Phase III (50 weeks) Water can be used for production purposes

18 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 SUBSEQUENT PERIODS Continuous system monitoring Maintenance (preventative) System reviews trending, performance, changes failures, investigations, OOS, etc.

19 | Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009 Questions, please…. ?