AASHTO Trnsport ® Contractor’s Report September 8, 2003 Thomas P. Rothrock, Ph.D. Senior Vice President www.cloverleaf.net.

Slides:



Advertisements
Similar presentations
Trns•port SiteManager Materials Management and LIMS Presentation
Advertisements

Trns port Construction System Status Report Presented at the AASHTO Trns port User Group Meeting Santa Fe, New Mexico October 25, 2000 Presented by Brad.
Web Trnsport Implementation TEA/TUG October 1-9, 2008 Saratoga Springs, NY.
New Jersey Trnsport Cost Estimation System (CES) Implementation TUG 2006 John Lombardi Info Tech, Inc.
Primer Class Jim Ferguson (TUG Vice Chair, Nebraska Dept of Roads) October 12, 2004.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Trnsport Test Suite Project Tony Compton, Texas DOT Charles Engelke, Info Tech.
AASHTO Trnsport ® Contractor’s Report Thomas P. Rothrock, Ph.D. Senior Vice President November 6, 2005.
Insert software product logo (or name) on slide master AASHTO Civil Rights and Labor Management System Executive Summary.
2006 Trnsport Task Force Report Trnsport Users Group Conference October 22, 2006 Portland, Maine Jim Johnson, Florida DOT Chair, Trnsport Task Force.
FieldNet 2.0a Joe Bruewer Michigan Department of Transportation 2005 AASHTO TUG Field Management TAG Daytona Beach, Florida.
NGT Information Technology Technical Discussion Bob DeHoff Info Tech, Inc.
Working with Info Tech, Inc. Teresa Franklin Trnsport Product Manager October 22, 2006 A Primer for Trnsport Users.
Working with Info Tech, Inc. Teresa Franklin Trnsport Product Manager October 6, 2007 A Primer for Trnsport Users.
Todd Bergland Trnsport Systems Manager WebCES TRT Chair Randy Lawton Senior Analyst WebCES Development WebCES Interface.
Accomplishments Planned Activities Announcements Questions TTF – TUG Trnsport On-Going Activities TTF Overview AASHTO Trnsport ® 2008 TTF Chair’s Report.
AASHTO Trnsport ® 2008 Contractor’s Report Thomas P. Rothrock, Ph.D. Senior Vice President October 6, 2008.
In Alabama, it is illegal to wear a fake mustache that causes laughter in church.
Web Trnsport Development Update Presented by Monelle McKay, Info Tech, Inc. September 2009.
TRACER and NGT Estimation Kyle Knudson, TRACER Product Manager Teresa Franklin, Trnsport Product Manager October 25, 2006 Earth Tech & Info Tech Collaboration.
Florida Department of Transportation Citrix Implementation
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
AASHTO Trnsport ® Contractor’s Report Thomas P. Rothrock, Ph.D. Senior Vice President October 14, 2004.
TUG Overview David Castleberg (TUG Vice Chair, Wisconsin Dept. of Transportation) November 6, 2005.
Improving Process for Better Software. Who We Are An experiential learning program that provides technology solutions for our partners, and real- world.
Next Generation Trnsport Presented by Paul Neumann, TTF Chair, Colorado DOT Ian Baldwin, Info Tech, Inc. November 2005.
Trns*port Data Model Unification Joe Pugh Virginia Department of Transportation Peggy Leight Info Tech Inc 11/06/05.
EGEMS A Dedicated Web Based System for Ground Water Data Processing Analysis and Storage.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
PopMedNet Software Development Life Cycle Chayim Herzig-Marx Harvard Pilgrim Health Care Institute Daniel Dee Lincoln Peak Partners.
TUG, AASHTO, TTF Primer Class Tim Lindberg (TTF Member from South Carolina) October 6, 2007.
TUG, AASHTO, TTF Primer Class Tim Lindberg (TTF Member from South Carolina) November 6, 2005.
Working with Info Tech, Inc. Teresa Franklin Trnsport Product Manager November 6, 2005 A Primer for Trnsport Users.
AASHTO Trnsport ® 2009 Contractor’s Report Thomas P. Rothrock, Ph.D. Senior Vice President September 25, 2009 Omaha, NE.
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc.
INDOT’s Scheduling / Project Management System (SPMS) Vision & Objectives for Next Generation SPMS Mike Jenkins, Indiana DOT Teresa Franklin, Info Tech,
UMT and Microsoft Presenting Tips and Tricks Basics What’s new in Microsoft Project 2010 Brian Feder, MBA, PMP Senior Vice President UMT Consulting Group.
Status Update Chad Schafer / JoAnn Vanasco Info Tech, Inc.
AASHTO Trnsport ® 2007 Contractor’s Report Thomas P. Rothrock, Ph.D. Senior Vice President October 7, 2007 ‘Meet me in St. Louis’
Learning with a Purpose: Learning Management Systems Patti Holub, Director District Initiatives and Special Projects Miguel Guhlin, Director Instructional.
Web Trnsport Development Update Presented by Monelle McKay, Info Tech, Inc. October 2008.
Next Generation Trnsport Trnsport Users Group Conference Field Management TAG November 7, 2005.
1 Open Library Environment Designing technology for the way libraries really work December 8, 2008 ~ CNI, Washington DC Lynne O’Brien Director, Academic.
FieldNet 2.0a Joe Bruewer Michigan Department of Transportation 2004 AASHTO TUG Mobile, Alabama.
Trns port What is Trnsport? Trnsport is a of suite software modules, developed by AASHTO, designed to support state construction programs.
ODRC Mainframe Systems Migration Project
CMS Migration to SiteManager Division of Construction Management.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Next Generation Trnsport Presented to the AASHTOWare Trnsport User Group October 14, 2004.
Cloverleaf and TeamTrack Teresa Franklin Trnsport Product Manager October 26, 2006.
Trns port Modification Reports Process Presented at the Trnsport User Group Conference Burlington VT by Shirley Daugherty NE DOR Chair, Trnsport Task Force.
Enhancements in Estimation and Bid Analysis Randy Lawton Info Tech, Inc.
Materials Update Denis Glascock, Missouri DOT. or What are the Lab Rats up to?
Jim Ferguson, Nebraska DOR Trnsport User Group Chair It’s a TUG Chair’s Life A 2005 Review Welcome to 2005 TUG Conference Daytona Beach, Florida.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
TUG Chair Report Report for the Fiscal Year of 1999.
Project 2003 Presentation Ben Howard 15 th July 2003.
TUG Overview Brian Parnell (TUG Chair, South Carolina Department of Transportation) October 6th, 2007.
Cost Estimation System CES Implementation at NDOR TUG 2006.
Cloverleaf and TeamTrack Teresa Franklin Trnsport Product Manager October 9, 2007.
Next Generation Trnsport Current Development Update Presented by Ian Baldwin, Info Tech, Inc. October 2006.
Trnsport Test Suite Status Presented to the AASHTOWare Trnsport IT TAG October 12, 2004.
2005 Trnsport Task Force Report Trnsport Users Group Conference November 6, 2005 Daytona Beach, Florida Paul Neumann, Colorado DOT Chair, Trnsport Task.
FieldNet 2.x Enhancement TUG – September 8, 2003 Andres Marin, Info Tech Inc.
State of Georgia Release Management Training
Next Generation Trnsport Impact Assessment Sub-project Jim Johnson, Florida DOT and Pamela Barry, Info Tech, Inc.
SiteManager/FieldManager Interface
BAMS/DSS® Data Warehouse
Enterprise Program Management Office
General Services Department State Purchasing Division
Presentation transcript:

AASHTO Trnsport ® Contractor’s Report September 8, 2003 Thomas P. Rothrock, Ph.D. Senior Vice President

Presentation Overview Quality Initiatives Some Highlights Trnsport Long Range Work Plan Trnsport Licensing/Implementation Status Trnsport Marketing Trnsport Enhancements and Maintenance Trnsport Related Work Status Conclusion

Quality Initiatives Contractor-TTF-TRT Interactions User participation in rigorous TMR review and error corrections (CIRT, MIRT, TTF) Improved installation processes –e.g., simplified SiteManager object store Improved Testing and Release procedures –Early code lock down –Expanded Test Labs –Better configuration management Investing heavily in project management CMMI and Project Management Initiatives

Some Highlights New products introduced this year DSS Standard (Nov 2002) SitePad Pocket PC (Feb 2003) Interactive Product Tour (IPT) (April 2003) Test Suite Phase I completed, Phase II underway Web Enabling Trnsport CES Parametric Estimation SiteManager 3.2 Improvements FieldManager Awards –Computerworld Honors Program Laureate (2003) –Center for Digital Government Best of Breed Award (2002) –CI0 Magazine Enterprise Value Award (2002)

Trnsport Long Range Work Plan* (LRWP) *Posted on Cloverleaf

LRWP Strategic Focus Web enabling Trnsport XML Initiatives Test Suite Initiative TrnsNet Process Improvement

Web Enabling Strategy Web-based functionality will be added incrementally to the client/server environment Target areas where it makes the most sense –Distributed users –User’s needing limited access to a few functions –Provide easy-to-use capabilities for more complex operations –Interactive analysis CES Parametric Estimation will be the first function addressed

XML Initiatives eXtensible Markup Language (XML) Currently Used in SitePad, Estimator, PES, and CES Using for the SiteManager/FieldManager Interface and other Trnsport interfaces in the future Worked with MnDOT & Bentley on aecXML standard resulting in Quantity Manager Interface between InRoads (design) and Trnsport TRB TransXML project in RFP phase –Goal is to provide data interchange standards for sharing transportation data between systems and users

Test Suite Initiative Will provide an automated, uniform, integrated test suite for all of Trnsport Creation of a robust test-case repository along with standard test data across all modules of Trnsport Resulting in reduced effort for regression testing and increased quality of software Support for onsite validation at agency

TrnsNet Facilitate communications between… –Trnsport components –Trnsport and other systems –Agency and other stakeholders Workflow management FieldNet Rewrite currently being funded by Michigan DOT could be leveraged

TrnsNet - Vision SiteManager Non-Inspector Estimator SiteManager Central SiteXchange Other Systems (Design, LIMS, Bid Express) TrnsNet FieldManager CES PES and LAS SitePad FieldBook FieldPad

Process Improvement Testing Installation and Configuration Security Documentation Incremental Development TMR management –Annual Review –Functional Grouping –Bundling with Enhancements

Licensing and Implementation Status

Trns port Licensees 40 Agency DOTs, 1 Canadian Province, DC Dept. of Public Works, and The Philippines Dept. of Public Works and Highways Alaska Hawaii Philippines New Brunswick

Trnsport Expedite ® 40 Trnsport BAMS/DSS ® 36 Trnsport PES/LAS ® 32 Trnsport Estimator ® 23 Trnsport CES ® 16 Trnsport Intranet ® 12 Agency Licensees by Module Trnsport SiteManager ® 23 Trnsport CAS ® 11 Trnsport SitePad ® 8 Trnsport FieldManager ® 8 Trnsport SiteXchange ® 10 Trnsport FieldNet ® 5

Beyond State DOTs Trnsport Licenses –Washington D.C. Dept. of Public Works –Philippines Department of Public Works and Highways –Oklahoma Transportation Authority (OTA) –Penn Turnpike –FHWA Federal Lands –New York Thruway Authority (Evaluating) FieldManager Licenses –Over 150 Local Government –Over 400 Consultant/Contractor

Service Unit Activity 70 trips to 13 Agencies Began 5 new implementation projects Completed approximately 394 Service Units ($5.25M), a 24% increase over the previous year On-site dedicated teams in 6 Agencies Completed 15 Evaluation License Units in 6 agencies

Client/Server Implementation Status 28 Agencies in production with one or more modules 6 Agencies implementing one or more modules for first time 5 Agencies migrating from mainframe 2 Agencies on mainframe that haven’t started migration June 30, 2004 Mainframe Unsupported

Customer Support Activities Improved on-line electronic support –Enhanced Upcoming Releases Info –Agency Product & Platform Information Haval Aloussi Mary Johns Matt Barreto Nicolas Kitsikis Hans- Georg Lerdo Darleen Randall Handled 3,019 Call tickets

Trnsport Marketing

Trnsport Marketing Activity 9 Tradeshows Attended 8 Meetings/Seminars Attended & Presented 20 Agency Visits with Presentations New and Improved Materials Available –Trnsport Interactive Product Tour –Trnsport Product Sheets (Updated) –Trnsport Newsletters (Fall & Spring) –FieldManager Web Site (Redesigned & Updated) –FieldManager Project Spotlights (Case Studies)

Trnsport Enhancements & Maintenance

General System Enhancements Currency Field Width Expansion –BAMS/DSS, CES, Estimator, Expedite, PES/LAS-SAPW Trnsport Interactive Product Tour (IPT) BAMS/DSS Standard Trnsport Test Suite Phase I SiteManager Contract Sampling and Testing SitePad on Pocket PC

General System Enhancements SiteManager/FieldManager Interface Trnsport Test Suite Phase II Currency Field Width GUI and Reports –BAMS/DSS, CES, Estimator, Expedite, PES/LAS-SAPW Web Enabling Trnsport CES Parametric Estimation Proposals under consideration for materials enhancements and SitePad II enhancements

TMR Summary for * SiteManager Sept 23 rd delivery included

Product Updates and Releases In there were 30 Updates/Releases –Delivering nearly 800 TMRs In the plan is for 32 Updates/Releases –Additional Modules/Releases Supported –Focus on one mid year update and end of year release per module Deliver updates via Cloverleaf Testing Approach –Emergency fixes: limited testing based on agency impacted –Product Updates and Releases: full release testing

SitePad Initiatives and Status SitePad 2.x – (Windows CE version) –Continue maintenance and support –Proposed Enhancements: Add attachments, DWR templates, material sampling and materials testing capabilities SitePad 1.x – (Palm OS version) –Continue maintenance and support –No future enhancements planned 9 Licensees –(AL, AR, MO, NE, TN, TX, VT, FL, Philippines)

Trnsport Interactive Product Tour (IPT) Series of Macromedia Flash® movies on the modules in the Trnsport suite Designed to show features and benefits of the suite to new and potential users Delivered on CD in April 2003 and also available on Cloverleaf Copies in Info Tech demo room

Trnsport Related Activities

Third-Party Interfaces Completed Bentley – Geopak Quantity Manager Surety 2000 and InsureVision – Electronic Bid Bond Validation

Electronic Bidding with Expedite and Bid Express 12 In production with 2-way Bidding 7 Implementing 2-way Bidding 18 Evaluating 1 or 2-way Bidding

Scheduling / Project Management System (SPMS) Developed and maintained by INDOT since 2000 Enterprise level planning, scheduling, coordinating, tracking and reporting for the entire project life cycle Tracks project costs through all phases of activity Client/server product built using the same technology and architecture as Client/Server Trnsport Interfaces to Trnsport CES with other interfaces planned for the future

Collusion Detection Training Workshops Held every February at Info Tech office in Gainesville, Florida Provide hands-on, in-depth training using BAMS/DSS with case studies using real Agency data Next workshop scheduled for February 24-26, 2004 Sign-up available on Cloverleaf Events

Conclusion

Lessons Learned Put greater emphasis on testing –Lock down code earlier –Test Suite will provide more automated testing –Create independent testing lab Increase the amount of user interaction –TRTs and TTF Test Results Validation –List Servers, Groove (collaboration tool)

Info Tech Support Organization Three Organizational Units –Customer Services – Joe Phelan –Implementation Services – Terry Sullivan –Development Services – Margaret Andraka Level 1, 2, and 3 Support Assigned Client Reps to each Agency Maintain the Cloverleaf web site to provide timely, up-to-date information to users, including software updates

Info Tech Improvements Project Management –Continue to provide formal training classes –Implementing an enterprise level project management system (PlanView) Development Methodologies –Focusing on Iterative and Agile Development CMMI Initiatives Maintain a continuous level of R&D activity

2003 TUG Special Demos Web Prototype Demos –CES: Parametric estimation –SM: Contract status summary, Cont mod approval Wireless synchronization of SitePad to SiteManager Plansheet access via Bid Express Interactive Product Tour

AASHTO Trnsport ® Contractor’s Report September 8, 2003 QUESTIONS?