Compressor status AWAKE Technical Board meeting 19 May 2015.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

IP Area Reconfiguration Conceptual Design Five Phases: 1.Transport (A) 2.Gas Chamber 3.Injection Chamber 4.Compressor 5.Transport (B) M. Litos July 24,
The MICE Target Lara Howlett University of Sheffield.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
Vacuum optical compressor: Tentative ideas, layout, size … Mikhail Martyanov, CERN AWAKE TB and PEB meeting December 2014.
PEEM III Endstation Design Review
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
UED ASTA Mechanical Mechanical Design Status Eric Bong 20 May 2014.
ATLAS Pixel Detector Project N. Hartman LBNL 1 Alexis Smith Intern Progress Report Neal Hartman, March 25, 2003.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
Compressor status AWAKE Technical Board meeting 19 August 2015.
EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT ATLAS Roman Pots at IR1 Beniamino Di Girolamo CERN.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Update on the Laser Beam Line
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting February 27, 2001.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Michał Matusiak Sławomir Wronka
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Summary of the AWAKE Technical Board Meetings Edda Gschwendtner.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
IT-4189 Supply and installation of a cryogenic distribution system
1.3-GHz Cavity Vacuum Furnace at IB4
AWAKE e-spectro update
Teleconference ACS – FREIA 18th April 2017
News about the WA104 Programme
Diffuser status October 2017
Spectrometer Solenoid Fabrication Status and Schedule
Far Detector Activities Late 2017 – Early 2018
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Proposals of new electron cloud monitor in the PS
X-ray Pump-Probe Instrument
Teleconference ACS – FREIA 20th February 2018
XFEL Collimation and Beam Switchyard Vacuum Issues
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Teleconference ACS – FREIA 19th June 2017
BGC Collaboration Meeting –
UPPSALA UNIVERSITY_GERSEMI PROJECT
East Hall under construction
Presentation transcript:

Compressor status AWAKE Technical Board meeting 19 May 2015

Technical Offers from Amplitude Technology February 2015 “Standard” vacuum chamber D=1500 mm April 2015: Space limitation of CERN installation taken into account, optical design was modified “Reduced size” vacuum chamber D=1300 mm ø 1500 Details in EDMS document

Content of the Amplitude compressor package  The vacuum vessel with external diameter of Ø1300 mm.  The support to hold the vacuum vessel (height to be defined).  The internal breadboard and the support to accommodate the mechanical mounts of the compressor.  The place for four windows (input beam, output beam, diagnostic beam, and leak).  The place for the vacuum pumps (two flanges) and two flanges for the detectors.  A test report of the vacuum compatibility of the vacuum chamber will be supplied following Amplitude Technologies quality process (inspection of the vacuum chamber with mass spectrometer for the detection of pollutant).  The installation on-site is included (two days). The optical compressor with the optical components (including the windows) and the mechanical mounts are not included. The vacuum pump, the detectors and the controllers are not included and will be integrated by the purchaser.

New layout of vacuum vessel

Positions of beam ports 2500 D=1300 B 170 Values confirmed: 1. Chamber diameter D=1300 mm 2. Distance between output beams A= Position of output beam w.r.t. chamber axis B= Position of input beam w.r.t. chamber axis E=170 Main beam Diagnostic beam CD A E Leak beam 600 Optical table 1000x Values to provide: 1.Positions of input and output ports C, D, F F

Heights of beams

Height of beams and tables H out = 975 Table height 975 – 101 = 874 H in = Table height =875 H tot < Height of output beam H out = 975 mm 2. Height of input beam H in = = Total height H tot < 1600 mm Values confirmed: Numbers in black – extracted from the step files received with first proposal H Amp out = 975 Periscope H P = 67.5 mm For 3” LIOP-TEC mount on 50 mm pedestal ( ) Optical table 1000x900

Integration in the CERN installation updated

Compressor shifted by 200 mm Vacuum group turned by 90 o and placed in front of the turbopump Table extended by 200 mm (2000 -> 2200) =758 Power supply shifted by 200 mm Further adjustment of the integration

Vacuum in the laser compressor for the AWAKE project CERN Technical Specification

Vacuum requirements to be adjusted AMPLITUDECERN A leak rate of mbar l.s-1 is preferable. Outgassing of the laser compressor, that is defined here as the vacuum vessel itself and every component and mount installed in it, should not exceed mbar l s -1 There should not be any reason for a high leak rate. Seals: Amplitude Technologies’ standard vacuum chamber seals are made of FKM O-Rings The top seal of the vessel could be with O-ring, but the other flanges shall be with metallic seal.

Tentative schedule  Study in the research department to adapt the position of the window: four (4) weeks.  Manufacturing at the supplier’s site: seventeen (17) weeks, including summer holidays.  Test at Amplitude Technologies: two (2) weeks  Packing: one (1) week.  Installation on-site: one (1) week.  Compatible with 6 months delivery order if the order is placed soon. Time for transport is not considered. Order in June -- > Delivery in December

Hoist support structure for lifting the compressor lid Size of diffuser more than 100mm Hoist Support Structure Updated by Jean-Louis

Supporting structures

Laser room entrance: door 1

Laser room entrance: door 2

Support for vacuum chamber 2