5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.

Slides:



Advertisements
Similar presentations
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Advertisements

Installing & Testing Regulators
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
3.3.3 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders Operating a dispenser to fill DOT.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
Identifying Equipment & Procedures Used on Propane Transports
4.1.9 Student Book © 2004 Propane Education & Research CouncilPage Sizing and Selecting Vapor Meters for Gas Distribution Systems Vapor meters.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
Module 4: Storage and Dispensing Locations. 2 Objective Upon the successful completion of this module, participants will be able to discuss common and.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
2.3.6 Student Book © 2004 Propane Education & Research CouncilPage Performing a Walk-Around Inspection of the Transport After Loading Performing.
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
4.1.7 Student Book © 2004 Propane Education & Research CouncilPage Selecting Regulators for Vapor Distribution Systems Regulators are mechanical.
4.1.4 Student Book © 2004 Propane Education & Research CouncilPage Designing Aboveground ASME Tank Installations A very important decision in designing.
Transporting ASME, DOT Portable, and Intermodal (IM) Tanks
4.1.6 Student Book © 2004 Propane Education & Research CouncilPage Designing Underground ASME Tank Installations A very important decision in designing.
3.1.5 Identifying Procedures for Evacuating ASME Tanks at Bulk Plants or at Customer Locations A full understanding of the operation of the liquid evacuation.
Student Book © 2004 Propane Education & Research CouncilPage 1 To provide safe and efficient transporting of bulk containers, such as ASME tanks.
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
3.5.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Following the proper procedures for filling bobtails is essential to a safe and efficient.
In this module you will learn to identify:
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
3.4.7 Student Book © 2004 Propane Education & Research CouncilPage Examining Bulk Plant Electrical Systems Prevention of gas ignition in transfer.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Preparing Foundations for Cylinders & ASME Tanks
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
Indiana Fire Code.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
MODULE 6 Vehicle Parking, Servicing, and Security.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
7.4.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Systematic Troubleshooting Techniques and Guidelines for Gas Operated.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
MODULE 3 Bobtail Equipment and Systems.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
MODULE 2 Operate the Propane Liquid Supply System.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
Anhydrous Ammonia Storage and Handling Original Power Point Created by Brandon Ritter Modified by Georgia Agricultural Education Curriculum Office June.
Installing DOT/ICC Exchange or Stationary Cylinders
Designing DOT Exchange and Stationary Cylinder Installations
Presentation transcript:

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane tanks used to supply dispensers. Selecting or verifying that dispenser tank valves and fittings are proper for a certain installation requires an examination of the application and operating requirements for the dispenser, and company operating procedures Identifying Required Dispenser Tank Valves and Fittings In this module you will learn to: 1.Identify NFPA 58 code requirements for ASME tank valves & fittings 2.Verify proper specifications and protection measures for tank relief valves 3.Verify that proper components for the dispenser installation are provided

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 Identifying NFPA 58 code requirements for ASME tank valves and fittings NFPA (11) Propane dispensers located at multiple fuel refueling stations shall comply with NFPA 30A, Code for Motor Fuel Dispensing Facilities and Repair Garages. NFPA 58 definitions of propane dispensers are given in: Dispensing Station Vehicle Fuel Dispenser

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 2 NFPA 58 required dispenser tank valves and fittings generally include : 1.Double backflow check filler valve (tanks with filler opening less than 1½ inch diameter) 2.Manual shutoff valve for vapor service 3.Fixed maximum liquid level gauge, often a component of a multi-valve including a manual shutoff valve 4.Internal spring-type relief valve (aboveground tanks; external type for underground tanks) 5.Float gauge 6.Actuated liquid withdrawal excess-flow valve (this valve is optional when a liquid withdrawal valve with excess-flow is provided)

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 2 Dispenser tank valves and fittings that are optional or not specifically required by Table generally include: 7.Backflow check and excess-flow vapor return valve(s) 8.Manual shutoff liquid valve with internal excess-flow check valve 9.Pressure gauge (tanks greater than 4000 water gallons) Dispenser supply tanks typically incorporate items 1, 2, 3, 4, 5, and 8.

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 3 Figure 1. Required and Optional Dispenser Supply Tank Valves & Fittings

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 3 Figure 2. Dispensing Station/Vehicle Fuel Dispenser Component Diagram

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 4 NFPA Containers in dispensing stations not located in LP-Gas bulk plants, industrial plants, or industrial applications shall have an aggregate water capacity not greater than 30,000 gallons ASME containers over 4000 gallons water capacity shall also be equipped with the following appurtenances: 1)An internal spring-type, flush-type full internal, or external pressure relief valve (see Annex E) 2)A fixed maximum liquid level gauge 3)A float gauge, rotary gauge, slip tube gauge, or a combination of these gauges 4)A pressure gauge 5)A temperature gauge

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 5 Verifying proper specifications and protection measures for tank relief valves Courtesy of Sherwood Division of Harsco Figure 3. Internal Type Relief Valve Figure 4. Container Surface Area (97.5 SQ. FT.) On ASME Data Plate

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 5 NFPA Rain caps or other means shall be provided to minimize the possibility of the entrance of water or other extraneous matter into the relief device or any discharge piping. Provision shall be made for drainage where the accumulation of water is anticipated The rain cap or other protector shall be designed to remain in place, except during pressure relief device operation, and shall not restrict pressure relief device flow The pressure relief valve discharge on each aboveground container of more than 2000 gallon water capacity shall be piped vertically upward to a point at least 7 feet above the top of the container, and the discharge opening shall be unobstructed to the open air.

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 7 Verifying that proper components for the dispenser installation are provided Filler valve or other filling systems Figure 5. Double Backflow Check Filler Valve for Tanks with Filling Opening Less Than 1½ Inch Courtesy of Sherwood Division of Harsco

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 7 Dispenser supply tanks over 4,000 gallons water capacity or having a filling opening diameter 1½-inch or larger require a transfer bulkhead equipped with an emergency shutdown valve (ESV) for the vapor equalizing connection (if 1¼-inch or larger), and an ESV for the liquid fill connection. A backflow check valve may be used for the liquid line if flow of liquid is limited to one direction (into the dispenser supply tank). Figure 6. Transfer Bulkhead and Emergency Shutdown Valves for Supply Tank with Filling Opening 1½ Inch (Liquid) or Larger

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 8 Internal valves and excess flow requirements The dispenser supply tank liquid opening that connects to the propane transfer pump must be fitted with an internal excess- flow valve. For supply tanks not located in a bulk or industrial plant having water capacities of 4,000 gallons or less a positive shutoff valve must be provided in conjunction with the internal excess-flow in one of the two methods listed below: 1.A manual valve located in the piping immediately down- stream of the excess-flow 2.An internal valve which incorporates the excess-flow and a positive shutoff

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 8 Figure 7. Excess Flow Valve and Manual Valve for Liquid Withdrawal

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 9 Figure 8. Internal Valve for Liquid Withdrawal (Shown in a Vertical Tank)

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 9 Emergency shutdown systems Figure 9a. Cable Actuated Liquid Withdrawal Valve Figure 9b. Pneumatic Actuated Liquid Withdrawal Valve

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 10 Manual valves Figure 10. Multi-valve Courtesy of Sherwood Division of Harsco Courtesy of Engineered Controls International Inc (REGO) Figure 11. Manual Valve with Excess-Flow Courtesy of Jomar International Figure 12. Ball Valve

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 11 Tank Fittings Courtesy of Sherwood Division of Harsco 13. Float Gauge a.b. 14a. Fixed Maximum Liquid Level Gauge with Dip Tube 14b. Multi-valve with Fixed Maximum Liquid Level Gauge

5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 12 Optional Gauges (Required for tanks larger than 4000 Gallons) Figure PSI Pressure Gauge Figure 16a. Tank Thermometer Well Figure 16b. Dial Indicating Thermometer

5.1.? Student Book © 2005 Propane Education & Research CouncilPages Time to See If You Got the Key Points of This Module… Complete the Review on pages See if you are ready for the Certification Exam by checking off the performance criteria on page 15.