1 Andrew Howard UNFCCC secretariat Progress in implementing the international transaction log Consultations on registry.

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

1 Toshiaki Nagata UNFCCC secretariat Progress on CDM registry development Inter-sessional consultations on registry systems.
Health Records Management Practitioner
Registry system data exchange General design requirements Pre-sessional Consultations on Registries 19 October 2002 New Delhi, India UNFCCC secretariat.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
Applying the SOA RA Utah Public Safety ESB Project Utah Department of Technology Services April 10, 2008 Prepared by Robert Woolley.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
1 Andrew Howard UNFCCC secretariat International transaction log Roles and functions Intersessional consultations on.
1 Andrew Howard UNFCCC secretariat International transaction log Checks, public information and modalities Intersessional.
GRETA GREENHOUSE GAS REGISTRY FOR EMISSIONS TRADING ARRANGEMENTS Overview of the UNFCCC registries Workshop on China’s National administration and approval.
1 Andrew Howard UNFCCC secretariat Checks to be performed by the international transaction log Consultations on registry.
Draft Operational procedures for registry systems 09 November 2004 Bonn, Germany Technical Breakout Group.
8.
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
Copyright  Larry Dribin, Ph.D. SE470_EngFlows_v1.ppt SE470 EngFlows - 1 Excellence in Software Engineering Repeatable Level Defined Level Manage.
1 United Nations Framework Convention on Climate Change UNFCCC press conference, Bonn, 20 November 2007 Kyoto Protocol “go-live”: data, policies, infrastructures.
1 Andrew Howard UNFCCC secretariat Registry systems and transaction types Consultations on registry systems prior to.
1 Andrew Howard UNFCCC secretariat Cooperation among administrators of registry systems Consultations on registry systems.
1 Andrew Howard UNFCCC secretariat Registry systems and the data exchange standards Intersessional consultations on registry.
Accounting of Emissions and Assigned Amount under the Kyoto Protocol Clare Breidenich UNFCCC Consultant.
Data Exchange Standards for the interaction with the ITL 08 November 2004 Bonn, Germany Peggy Quarles Perrin Quarles Associates, Inc.
The United Kingdom’s Experience and Perspective The Way Forward on Registries Martin Hession International Climate Policy DEFRA UK.
1 United Nations Framework Convention on Climate Change UNFCCC press conference, Bonn, 17 November 2008 by Sergey KONONOV (UNFCCC secretariat) UNFCCC data.
1 Andrew Howard Climate Change Secretariat Emissions trading and project-based mechanisms 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop.
UNFCCC Information Event
1 Transaction log and the data exchange standards Introduction Pre-sessional consultations on registries 2 June 2003 Bonn, Germany Andrew Howard UNFCCC.
Data Exchange Standards in support of transaction processes 08 November 2004 Bonn, Germany Peggy Quarles Perrin Quarles Associates, Inc.
Discussion Forum Bridge Consulting 9 November 2012.
1 Andrew Howard UNFCCC secretariat International transaction log Transaction checks Intersessional consultations on registry.
CHICAGO PUBLIC SCHOOLS IMPACT Gradebook Core Team Support Guidelines July 7, 2008 Instructional Management Program & Academic Communication Tool I M P.
Joint implementation, eligibility and the Compliance Committee Andrew Howard, Reporting Data and Analysis Cam Carruthers, Legal Affairs Bonn, October 2007.
Roles and Responsibilities
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
1 SERINGAS FRENCH GHG NATIONAL REGISTRY UNFCCC Intersessional Consultations on Registry Systems 8-10 November 2004.
Software Testing Life Cycle
UNFCCC secretariat Session 4 Meeting eligibility requirements First UNFCCC workshop on implementation of Article 6 projects under the Kyoto.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Understand Application Lifecycle Management
Options and Recommendations Pre-sessional consultations on registries June 2002, Bonn, Germany DEVELOPMENT OF A NATIONAL REGISTRY IN BULGARIA Options.
Possible elements of the technical standards Pre-sessional consultations on registries Bonn, 2-3 June 2002 Andrew Howard UNFCCC secretariat
OPTIONS TO USE EXISTING INTERNATIONAL OFFSET PROGRAMS IN A DOMESTIC CONTEXT Case Study: The use of CDM in support of domestic offset schemes Sacramento,
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
© Mahindra Satyam 2009 Configuration Management QMS Training.
UNFCCC secretariat, MDA Jean-Francois Halleux, Programme Officer Institutional framework for registries Sacramento, California, 23 September 2015.
September Interface Kickoff Sunflower Project Statewide Management and Reporting Tool Update September 02, 2009.
European Commission: Environment Directorate General Slide: 1 Registry systems for the EU emissions trading scheme SBSTA pre-sessionals Bonn, Germany,
Questionnaire on the development of national registries Andrew Howard UNFCCC secretariat Pre-sessional consultations on registries Bonn,
September 25, 2015 Sacramento, CA Frédéric DINGUIRARD WB PMR Expert Connecting registries Workshop “Building Registries to Support the Next Generation.
Seite Hier steht ein thematisches Foto Demand side perspective on JI UNFCCC Side event on Joint Implementation Gertraud Wollansky Federal Ministry.
Setting the scene: A framework of technical standards for data exchange Pre-sessional consultations on registries October 2002 New Delhi, India UNFCCC.
CONNECT CCB Meeting May 16, Balancing current + future needs CONNECT needs to support the current 2012 production and operational needs of the Federal.
1 Andrew Howard UNFCCC secretariat Cooperation among administrators Overview and evolution Intersessional consultations.
1 Andrew Howard UNFCCC secretariat Cooperation among administrators Structure and modalities Intersessional consultations.
Project management Topic 8 Configuration Management.
Introduction to registry systems
 Project Team: Suzana Vaserman David Fleish Moran Zafir Tzvika Stein  Academic adviser: Dr. Mayer Goldberg  Technical adviser: Mr. Guy Wiener.
EUETS Registry EUETS Registry; the UK Experience and Changes for Phase III Lee Oliver Workshop on EU Emission Trading Scheme – Monitoring, Reporting and.
Review of IT General Controls
Introduction to DBMS Purpose of Database Systems View of Data
JISC – work accomplished and challenges ahead
THE STEPS TO MANAGE THE GRID
Eligibility issues and joint implementation
Validation & conformity testing
Issues in linking registries and the transaction log
Software Development Process
Analysis models and design models
Introduction to DBMS Purpose of Database Systems View of Data
Joint implementation and eligibility requirements
The FPH e-Portfolio management system
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

1 Andrew Howard UNFCCC secretariat Progress in implementing the international transaction log Consultations on registry systems prior to SBSTA 22 Bonn May 2005

2 Technical design work Applicability of the CITL for ITL development Development schedule Initialization of registries Overview

3 Basis for the ITL established in the standards Transaction types Checks to ensure conformity with rules Reconciliation to eliminate inconsistencies Electronic communications with registries Data records to be kept Administrative processes Version 1.0 of the technical specifications for the standards Data exchange standards

4 Version 1.0 (draft #7) of the ITL technical design specifications Database design and structure Logical flows for transaction and reconciliation processes Detailed specifications of coding components Detailed methods for ITL checks Links to other databases for reference information -Compilation and accounting database -CDM information system -JI information system (track 2) Detailed specifications for ITL notifications ITL technical design

5 Review ITL technical design Create database Develop programme code and an administrator interface Establish hardware environment Testing (individual components and overall functionality) ITL deployment in a production environment Initialization of secure communications with registries Documentation (plans, guides, training) Public website ITL development tasks

6 EU ‘Community Independent Transaction Log’ Performs checks on transactions under the EU trading scheme Modelled on Kyoto’s ITL Development based on ITL technical design CITL programme code provides a robust basis for the ITL Strong architecture for transactions, data integrity and checks Around half of required ITL functionality contained in CITL code Challenge is to safely and seamlessly adapt, remove and add code A head start through the CITL

7 EU transaction log (CITL) EU communications hub National registry EU Member State registries EU checks Current EU communications

8 Future Kyoto Protocol communications Kyoto international transaction log Kyoto communications hub EU transaction log (CITL) UN checks Other supplementary transaction logs Other checks National registry EU Member State registries National registry CDM registry National registry Other Kyoto registries EU checks

9 Create new database or modify CITL database Add web service communications (tCERs and lCERs, notifications, STL communications) Add functions to interact with STLs (routing and processing communications, reconciliation, data sharing) Add transaction types (replacement, expiry date change) Add ITL notification functions and running totals Modify existing checks and add ITL-specific checks (tCER and lCER checks, transaction-specific checks, reconciliation checks) Remove unneeded CITL code (account management, EU-specific checks, EU supplementary unit and transaction types) Adaptation of CITL code

10 Unit testing on individual code and database components Integration testing of compiled ITL code (with registries and STLs) -Cover all transaction, reconciliation and notification cases -Cover all ITL check cases Regression testing (after fixes made through earlier testing) Performance testing (for efficiency improvements) -In actual hardware/software environment -Under realistic load scenarios Testing the ITL

11 Indicative ITL development schedule Estimated completion Review of ITL technical design Establish development environment Creation/modification of databaseDec 2005 Programme code development and unit testingMar 2006 Administrator interface development and unit testingApr 2006 Establish hardware environment Integration and regression testing (non-STL case)May 2006 Integration and regression testing (STL case)Jun 2006 Performance testingJul 2006 ITL deployment (including prototype)Jul/Aug 2006 ITL administrator training

12 Administrator training Receipt and review of initialization documentation Establishment of VPN connection Transaction and reconciliation tests (web services tests) Tests for other data submission to ITL Full registry tests Activation of production environment connection Concentrate initially on registries not associated with an STL Initializing registries

13 CITL initialization Similar process as for registries Establishment of secure ITL-CITL connection Data migration schedule (coordinated with EU registry migration), including standardized data migration procedures and scripts Migration of registry connections from the CITL to the ITL One migration round or several? Coordination through the administrators cooperative forum The special EU case

14 Communications and planning through the cooperative forum ITL requirements Planning and schedules for development, testing, deployment, initialization (including data and registry migration in the EU case) Support for initialization Provision of ITL prototype VPN purchase/configuration support for registries Further guidance on documentation Initialization support being incorporated in contractor selection Communications with administrators