Line of balance and elemental trend analysis Project management.

Slides:



Advertisements
Similar presentations
Math in Our Environment Created by:. List your location here Discuss the location and what math concepts are going to be in the problem.
Advertisements

Gantt Chart.
MAINTENANCE PLANNING AND SCHEDULING
464 Lecture 09 CPM Revision. Scheduling Techniques r The scheduling techniques are î To plan, schedule, budget and control the many activities associated.
Scheduling.
Process Selection and Facility Layout
1 Inventory Control for Systems with Multiple Echelons.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
© 2007 Pearson Education DD DD GG GG GG MM MM MM AA AA L LL LL LL L Process Layout Chapter 8.
Line of balance and elemental trend analysis
WEEK 04C – PROCESSES AND TECHNOLOGY (CH 6) Process types and selection, automation, line balancing SJSU Bus David Bentley1.
Inverses of n x n Matrices. The Inverse Matrix If A is an n x n matrix, the inverse of A (call it A -1 ) is the matrix such that A * A -1 is equal to.
CSE 421 Algorithms Richard Anderson Lecture 6 Greedy Algorithms.
Materials Requirement Planning (MRP)
Quality Function Deployment Quality Function Deployment QFD Vivian Cherie KJ.
PRE-FABRICATED STRUCTURES
ETF Haulage Trucks Agadir, May, 2013 Advanced Maintenance Systems.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Chapter 12 Inventory Models
CHAPTER 18 OPERATIONS MANAGEMENT. OPERATIONS MANAGEMENT (OM) n The Nature of Operations Management u Innovative managers do not just manage people--they.
Industrial Engineering I
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 12 MACHINE SETUP AND OPERATION SEQUENCING E. Gutierrez-Miravete Spring 2001.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
Hierarchy of Production Decisions
Assembly Lines – Reliable Serial Systems
MATERI XI PRODUKSI & OPERASIONAL. 5 ISSUES That arise when trying to produce a product or service Capacity (How much can I produce) Scheduling (How am.
Resource analysis Project management (lecture + seminar)
Project Management Inspections and Reviews 1 February.
Resource analysis 1 Project management (seminar).
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
Industrial practice Industrial production methods There are four main types of industrial production methods: One-off production is when only one product.
Master Production Scheduling (MPS)
ABOUT THE SEMINAR Project Management may be defined as “discipline of initiating, planning, executing and controlling a set of activities to achieve specific.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Chapter 3 Project Management. Chapter 3 Project Management.
Project Management Operations -- Prof. Juran.
Maintenance Scheduling
Introduction to Project Management
Introduction to Linear Programs
Hospital Establishment
Using ITEMPLANNING with SALES FORECASTING
MAINTENANCE PLANNING AND SCHEDULING
ENGINEERING MANAGEMENT (GE 404)
Problem solving.
Chapter 2 The Process of Design.
FACILITY LAYOUT Facility layout means:
Line of Balance (LoB) and elemental trend analysis
ENGINEERING MANAGEMENT (GE 404)
دانشگاه شهیدرجایی تهران
Chapter 6 Network-Based Scheduling
تعهدات مشتری در کنوانسیون بیع بین المللی
Introduction Foundation Re-design Analysis
Basic Project Scheduling Line of Balance
3 Types of Secondary Manufacturing
Gantt Chart.
PROJECT MANAGEMENT (BSBI 622)
Facilities Planning and Design Course code:
2) Identify Requirements 1) Define the Problem 3) Gather Information
Introduction to Scheduling Chapter 1
Swarm Intelligence: Bucket Brigade Assembly Lines
Process Layout Chapter 8 L L M M D D D D L L M M L L M M G G L L G G A
Capstone Team Project title
Summer Training Industrial Engineering Department
LINEAR BALANCE METHOD & MATRIX SCHEDULE
Line of Balance (LoB) and elemental trend analysis
Scheduling.
Presentation transcript:

Line of balance and elemental trend analysis Project management

Line of Balance (LoB) A conventional network technique applied to develop and control a single batch. It was developed as a production planning tool before PNTs. It has a much less wide application area.

Requirements of LoB Identifiable stages in production to exert managerial control. Known manufacturing times between stages. Delivery schedule. Resources can be varied as required.

Elemental trend analysis (= LoB) requirements Items in the batch are independent of each other Same resource carries out the same activity on every item of the batch Only one resource can work on a given item Any resource constraints must be removed before the analysis

Where it is useful? Construction industry Heavy engineering assembly Road or railway building … Why not using a PNT here?

Problem solving example There is a project of building 5 identical row houses. On each house 4 work units (items) should be made, each by a specialized team of workers: – Foundations (team A): 1 month per house, – Brickwork (team B): 2 months per house, – Roof construction (team C): 2 weeks per house, – Internal works (team D): 1 month per house a)Plot a LoB chart. Follower team can start working on a given unit immediately after the predecessor team finished. Calculate the TPT. b)Redesign the LoB chart to eliminate idle time of teams and minimize the TPT.

Solution (a) Month 1Month 4Month 3Month 2Month 6Month 5Month 7 House 1 House 3 House 2 House 4 House 5 Month 8 Month 11Month 12 Month 9 Month 10 TPT 12.5 months Month 13

Solution (b) Month 1Month 4Month 3Month 2Month 6Month 5Month 7 House 1 House 3 House 2 House 4 House 5 Month 8 Month 11Month 12 Month 9 Month 10 TPT 14 months Month 13Month 14

Control with LoB If the 2 nd team performing only on 75%...

Control with LoB Month 1Month 4Month 3Month 2Month 6Month 5Month 7 House 1 House 3 House 2 House 4 House 5 Month 8 Month 11Month 12 Month 9 Month 10Month 13Month 14Month 15Month 16Month 17 TPT 17 months

Thanks for the attention