Www.risoe.dk Hybrid System Performance Evaluation Henrik Bindner, Tom Cronin, Per Lundsager, Oliver Gehrke Risø National Laboratory, Roskilde, Denmark.

Slides:



Advertisements
Similar presentations
WHAT IS DRS? Thermoflow, Inc.
Advertisements

Software Tools Supporting Village Power System Design
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
Sistan & Balouchestan Electric Power Distribution Company
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
L2 Compliance: Project Darwin
1 Western Wind & Solar Integration Study Phase 2: Cycling Impacts on Thermal Generators Dick Piwko, Gary Jordan March 16, 2011.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Aditya Pavan Kumar.T (08FE1A0202) VIGNAN’S LARA INSTITUTE OF TECHNOLOGY AND SCIENCE 1.
Modeling and simulation of the Power Energy System of Uruguay in 2015 with high penetration of wind energy R. CHAER*E. CORNALINOE. COPPES Facultad de Ingeniería.
1 July 2001 SMES Modeling and Simulation Benchmarking Paulo F.Ribeiro Calvin College / BWX Technologies, Inc.
RENEWABLE ENERGY INTEGRATION IN OFF-GRID APPLICATIONS:
1 Training Session on Energy Equipment Electricity Presentation from the “Energy Efficiency Guide for Industry in Asia” ©
Plant Utility System (TKK-2210)
Hybrid Island Initiative for Integrating Renewable Energy in Pacific Islands Tadayuki OGAWA Japan International Cooperation Agency (JICA)
Unintended Consequences: The Impacts of Wind Energy on Rural Alaska Diesel Power Systems David Lockard and Alan Fetters, Alaska Energy Authority.
Hybrid power systems and renewable energy: Prospects from the IRENA point of view Roland Roesch IRENA Innovation and Technology Centre (IITC)
1 Training Session on Energy Equipment Electrical Systems Presentation to Energy Efficiency Guide for Industry in Asia Chapter 1 © UNEP GERIAP Electrical.
Introduction to Optimization (Part 1)
Wind Turbines and Water Heaters Load Control For Providing Power System Balancing Services Ken Dragoon Renewable Northwest Project PNDRP July 2010.
Aspects of Relevance in Offshore Wind Farm Reliability Assessment Nicola Barberis Negra 2 nd PhD Seminar on Wind Energy in Europe Risø.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Performance modeling of a hybrid Diesel generator-Battery hybrid system Central University of Technology Energy Postgraduate Conference 2013.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Demand Response – A New Option for Wind Integration ?
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
CCU Department of Electrical Engineering National Chung Cheng University, Taiwan Impacts of Wind Power on Thermal Generation Unit Commitment and Dispatch.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
SYSLAB A platform for research and testing of decentralised energy resource based power systems Henrik Bindner Wind Energy Systems Wind Energy Division.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Extrapolation of Extreme Response for Wind Turbines based on Field Measurements Authors: Henrik Stensgaard Toft, Aalborg University, Denmark John Dalsgaard.
Hinchinbrook Island Researcher: Gordon Dalton PhD student Supervisor: Dr David Lockington.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
GE Energy GE 2.x Zero Power Voltage Regulation Measurement Results Vincent Schellings.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
SINTEF Energy Research 1 Planning And Operation Of Large Wind Farms In Areas With Limited Power Transfer Capacity by M. Korpås, J. O. Tande, K. Uhlen,
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 11/17/2015 Power Quality Correction. 2 11/17/2015 Power Quality Correction.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
Renewables and System Services Ann Scully.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
Chapter 10 Verification and Validation of Simulation Models
A Closer Look at Energy Demands: Quantification and Characterisation.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Horizontal Axis Wind Turbine Systems: Optimization Using Genetic Algorithms J. Y. Grandidier, Valorem, 180 Rue du Marechal Leclerc, F B ´ Begles,
Optimal Power Flow- Basic Requirements For Real Life.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
IRP Review  IRPs with Significant Detail on Flexibility Assessment  Portland General Electric  Puget Sound Energy  Other IRPs.
Optimal Power Flow- Basic Requirements For Real Life Their Problems And Solutions.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
© ABB Group October 1, 2016 | Slide 1 DynaPeaQ ® SVC Light ® with Energy Storage FACTS.
SmartNet: A European research project to study TSO-DSO coordination for ancillary services provision from distribution networks Gianluigi Migliavacca (RSE)
Minnesota Renewable Energy Integration and Transmission
Market Architectures Integrating Ancillary Services from Distributed Energy Resources Olivier Devolder Head of Energy Group N-SIDE.
GENESYS Redevelopment Strawman Proposal
PSCAD models.
Control Schemes for Distribution Grids with Mass Distributed Generation AUTHOR: UMAIR SHAHZAD.
HOMER.
Chapter 10 Verification and Validation of Simulation Models
EU-IPA12/CS02 Development of the Renewable Energy Sector
Opportunities for Hydrogen-Based Energy Storage for Electric Utilities
Additional clarifications on economic and adequacy running hours
Presentation transcript:

Hybrid System Performance Evaluation Henrik Bindner, Tom Cronin, Per Lundsager, Oliver Gehrke Risø National Laboratory, Roskilde, Denmark EWEC, 2nd March 2006, Athens

Hybrid System Performance Evaluation Hybrid Systems – the Problem How will SYSTEM 1 perform at SITE 1? Is SYSTEM 1 better than SYSTEM 2 at SITE 2? Can you trust the answers? Key Issue: Develop method for system performance assessment Main ingredient: System modelling, especially supervisory controller modelling

Hybrid System Performance Evaluation This Work – the Questions The presentation deals with the following issues of modelling of hybrid system:  The optimum timestep to adequately take account of the wind variability.  Sensitivity of various performance criteria to the choice of timestep.  The nature of controller approximations necessary for longer timesteps.

Hybrid System Performance Evaluation This Work – the Approach Model simple system with 2 diesel gensets, 3 wind turbines and 3 loads Specify performance criteria Investigate performance for 2 different controllers and for 3 different simulation time steps

Hybrid System Performance Evaluation IPSYS – an explanation IPSYS is a flexible framework for simulation of integrated energy systems IPSYS is a dispatch model - modelling timesteps are in the range 10s-60min IPSYS explicitly models the power system and does load sharing between the frequency controlling units IPSYS is multi-domain – it models the electrical, mechanical, thermal, water or other domains IPSYS is very flexible in modelling configurations and supervisory controllers

Hybrid System Performance Evaluation Layout of the Simulated Hybrid System G Combined Load 1 Combined Load 2 Combined Load 3 WTG Dump Load G

Hybrid System Performance Evaluation Main System Details 2 x diesel generators: 780kW Generation voltage: 400V Step-up transformer: 1.7MVA Distribution voltage: 22kV 3 x 300kW wind turbines No-load reactive power compensation: 250kVA 900kW dump load 3 x geographically dispersed loads

Hybrid System Performance Evaluation Load Profiles

Hybrid System Performance Evaluation Droop Curve for Diesel Generators and Dump Load

Hybrid System Performance Evaluation Diesel Generator Controls ON: 75% Pr = 570kW OFF: 25% Pr = 195kW ON: 75% Qr = 510kVAr OFF: 25% Qr = 170kVAr Threshold Controller Margin Controller Reserve Capacity = (α × load kW) + (β × wind kW) Controller turns on another diesel if present generator cannot meet the current load plus the Reserve Capacity. Controller turns diesel off if it is not needed to meet the current load plus the Reserve Capacity.

Hybrid System Performance Evaluation Diesel Generator Fuel Curve No-load offset

Hybrid System Performance Evaluation Graphical Output from IPSYS

Hybrid System Performance Evaluation Running of the Diesel Generators 1 min 10 min 60 min Active Power (kW)

Hybrid System Performance Evaluation Numbers of Starts for Diesel No. 2 and Hours Run

Hybrid System Performance Evaluation IPSYS Outputs for this Assessment Total energy generated during the simulation Wind energy generated Wind usage Wind share Dump load share Diesel generator starts Diesel generator run time Total diesel fuel used

Hybrid System Performance Evaluation Simulation Cases Investigated Base Case Threshold Controller & Raw Wind Input Threshold Controller with min runtime adjustments & Raw Wind Input Threshold Controller & Filtered Wind Input All simulations run with 1, 10 & 60 minute timesteps Margin Controller & Raw Wind Input

Hybrid System Performance Evaluation Accuracy is necessary in modelling limits in even simple controllers. Both controllers show a sensitivity to a change in limits

Hybrid System Performance Evaluation ….but the timestep can influence the effect. The effect of changing the minimum run time is reduced as the timestep is increased.

Hybrid System Performance Evaluation Timestep impact on long-term performance indicators is relatively small

Hybrid System Performance Evaluation Major impact of timestep is on diesel start/stops

Hybrid System Performance Evaluation Impact of Wind Sampling Period (1) Raw Wind Data Series Power Frequency Filter

Hybrid System Performance Evaluation Impact of Wind Sampling Period (2)

Hybrid System Performance Evaluation Conclusions Simulation timestep has only a limited impact on overall system performance in terms of fuel consumption and wind usage Simulation timestep has a significant impact on operating conditions of components e.g. number of start/stops of genset Wind filtering has only minimal impact on fuel consumption For feasibility studies long timesteps (1h) give results of adequate accuracy Short timesteps (1min) are necessary for study of controllers and interaction between components, component operating conditions and wear and tear It is important to model reactive power aspect of controllers, as this has a considerable impact on the system operation and simulation results. Short time steps will allow real controllers to be implemented in simulation tool – IPSYS is designed for that

Hybrid System Performance Evaluation Limitations on Results Only one hybrid system configuration has been simulated. No storage included in studied configuration. Only simple controllers investigated. System parameters were adjusted to ensure all runs at all timesteps would run – this could hide the full of impact of timestep changes. Only a short step towards system testing – Lots of work required