«Ερευνητικές Υποδομές», 21/12/2004 OPTICON The Optical Infrared Co-ordination Network for Astronomy. Αιμίλιος Χαρλαύτης, ΕΑΑ και Ι. Σειραδάκης, Παν. Θεσσαλονίκης.

Slides:



Advertisements
Similar presentations
- Slide 1 OPTICON Optical-Infrared Astronomy for Europe EC Infrastructures press day 7 July 2005 EC Infrastructures press day 7 July 2005 Gerry Gilmore.
Advertisements

Information about the Integrated Infrastructures Initiatives (I3) instrument Daniel Pasini EC, DG Research, Unit B3 – Research Infrastructures EC, Brussels,
OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.
Philip Diamond RadioNet Co-ordinator University of Manchester Jodrell Bank Observatory.
1 23/05/2015 Networking Research Infrastructure NCPs National Hellenic Research Foundation (EKT/NHRF) Project Monitoring & Coordination Unit EuroRIs-NET.
Research Infrastructures 2004 Call for: Integrating Activities Transnational Access Accompanying Measures.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Research Infrastructures The Research Infrastructures in FP7.
OPTICON Summary by John Davies. OPTICON The Optical Infrared Co-ordination Network for Astronomy. Overview John Davies OPTICON Project Scientist. UK Astronomy.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
NA5: Interferometry Forum Andreas Quirrenbach (U Leiden / U Heidelberg)
AM, TA, CA and I3 projects selected in previous calls.
Research Infrastructures Infodays in Greece December 20 and 21, 2004.
OPTICON Board Meeting, Grenoble October Project Scientist Report John Davies UK Royal Observatory Edinburgh.
Emilios Harlaftis, National Observatory of Athens OPTICAL AND IR Coordination Network An EU Infrastructure Cooperation Network (FP5) with the aim to bring.
John Davies. FP7 Planning Meeting, UKATC June OPTICON FP7 Networking Plans John Davies OPTICON Project Scientist.
EARLINET-ASOS Symposium 20 September 2010, Geneva, Switzerland EARLINET: Future plans Gelsomina Pappalardo Consiglio Nazionale delle Ricerche-Istituto.
1 ASTRONET PROGRAM STATUS as of Preliminary Board 1 st Meeting Paris, 31 May 2005.
OPTICON Access Programme. OPTICON Access Programme. Mid-term review September Corfú OPTICON Trans-national Access Programme under the auspices of.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
Research Infrastructures in FP7 On behalf of : Anna Maria Johansson, Hervé Péro European Commission, DG RTD/B3 MarineERA workshop Feb
The European Science Foundation is a non-governmental organisation based in Strasbourg, France.
Hands-on experience on medium-sized telescopes or: The need to train young researchers in observing techniques M. Dennefeld IAP-Paris and University Paris.
OPTICON The Optical Infrared Co-ordination Network for Astronomy. Overview and Status Report. John Davies OPTICON Project Scientist. UK Astronomy Technology.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
AVO Status June 2002 Status M. Dolensky. AVO Status June 2002 WA0 - European Initiatives Enabling a Virtual Observatory for Europe EVOE –Submitted expression.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
Our Mission Visible detectors fully matching the requirements of Adaptive Optics wavefront sensors for 10m class telescopes do not yet exist: current detectors.
Opticon Porto 1 High Time Resolution Astrophysics Network Andy Shearer Centre for Astronomy School of Physics, NUI, Galway Ireland.
OPTICON is funded by the European Commission under Contract no RII3-CT Site Characterization of the Canarian Observatories: Different activities.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
Key Technologies Network Colin Cunningham. 11th Oct 2004 OPTICON Key Technologies Network Grenoble2 Objectives WP5.1: Workshops & Roadmapping: WP5.1:
An I3 funded by the EU through FP6 Alastair G Gunn University of Manchester Jodrell Bank Observatory OPTICON BOARD MEETING – 11 th /12 th October 2004,
NUVA Mission NUVA will map and review the instrumental performance of existing and near future capabilities in the UV on a global scale. It will assess.
OPTICON JRA4 Coordinator Dr Alain Chelli Laboratoire d’Astrophysique de Grenoble & Jean-Marie Mariotti Center, Universite Joseph Fourier, BP53, Grenoble.
Opticon FP6 status FP7 status Gerry Gilmore coordinator.
Solar Physics within OPTICON O. von der Lühe Kiepenheuer-Institut für Sonnenphysik Freiburg, Germany.
Status and achievements of Opticon FP6 (+FP5) Gerry Gilmore coordinator.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory Overall Objectives MTR: 12 April 2007 Grenoble.
OPTICON The Optical Infrared Co-ordination Network for Astronomy. FP7: Plans and Opportunities John Davies OPTICON Project Scientist. UK Astronomy Technology.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
NFFA-Europe has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No AN OPEN ACCESS.
1 ASTRONET Coordinating strategic planning for European Astronomy.
EURO-VO Structure Data Centre Alliance (DCA) A collaborative and operational network of European data centres who, by the uptake of new VO technologies.
E-Science Research Councils awarded e-Science funds ” science increasingly done through distributed global collaborations enabled by the Internet, using.
© 2004 NMI31 Integrated Infrastructure Initiatives I3: A brief introduction Integrating projects for a common type of Research Infrastructure.
Dr. Filippo M. Zerbi OPTICON JRA6 Coordinator INAF- Osservatorio di Brera Via Bianchi, 46 I Merate (Lc) Italy Telephone:
OPTICON Board Meeting Porto 2008 The OPTICON I Million Euro EC grant over 5 years 47 partners, many involving several labs/telescopes under single.
NFFA-Europe has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No AN OPEN ACCESS.
ILIAS Project Summary ILIAS is an Integrated Infrastructure Initiative that has pulled together all of Europe's leading infrastructures in Astroparticle.
Introduction to the VO ESAVO ESA/ESAC – Madrid, Spain.
The Role of an Access Programme: Lessons for FP7 Birgitta Nordström Niels Bohr Institute, Copenhagen University Denmark.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
The European Science Foundation is a non-governmental organisation based in Strasbourg, France.
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
Bob Jones EGEE Technical Director
An FP5 RTD programme Participants: University of Manchester: UK
2nd ILIAS-GW Meeting – 25th Oct. 2005, Palma de Mallorca
Εθνική Αστρονομική Επιτροπή, ΓΓΕΤ
9 April 2018 Phil Brown, Met Office, UK
ASTRONET Coordinating strategic planning for European Astronomy
OPTICON The Optical Infrared Co-ordination Network for Astronomy.
Maria Teresa Capria December 15, 2009 Paris – VOPlaneto 2009
Experience of the implementation of FP6; preparations towards FP7
Presentation transcript:

«Ερευνητικές Υποδομές», 21/12/2004 OPTICON The Optical Infrared Co-ordination Network for Astronomy. Αιμίλιος Χαρλαύτης, ΕΑΑ και Ι. Σειραδάκης, Παν. Θεσσαλονίκης Εθνική Αστρονομική Επιτροπή, ΓΓΕΤ

«Ερευνητικές Υποδομές», 21/12/2004 In FP5 ( ) OPTICON was an EU funded thematic network bringing together national funding agencies and users with common interests in optical-infrared astronomy. What is OPTICON? PI. Gerry Gilmore, Institute of Astronomy, Cambridge PS. John Davies, UK Astronomy Technology Centre, Edinburgh

«Ερευνητικές Υποδομές», 21/12/2004 FP5 OPTICON Objectives/Deliverables Very large telescopes Virtual Observatories Access to large databases Common data standards Future of 1-4m telescopes co-ordinated Instrumentation developments Exploitation of spacecraft data Lasting integration of EU Astronomers. Create opportunities for mobility. Remove duplicated or obsolescent facilities to release funding for new initiatives. Rationalise use of existing facilities Use astronomy as an educational tool

«Ερευνητικές Υποδομές», 21/12/2004 OPTICON Accomplishments AVO contract from EU Astrowise contract from EU EURO-3D contract from EU EU funds for feasibility study of elite fellowship scheme A coherent and widely supported approach to FP6 (including co-ordination with Radionet and AVO).

«Ερευνητικές Υποδομές», 21/12/2004 The OPTICON I3 Integrated Infrastructure Initiative Contract : 19.2 M Euro (from 255 total) Networking via working groups similar to OPTICON FP5 Transnational access to 22 Night-time and solar telescopes (combining activities such as COMET and FP5 ENO) 6 Joint Research Projects in Technology

«Ερευνητικές Υποδομές», 21/12/2004 Management OPTICON Board (18 partners) sets overall strategy and priorities at annual meeting (Εθνική Αστρονομική Επιτροπή) Oversight committee (~9 agencies) make the detailed decisions, especially about money, ~ 6 monthly. Cambridge (Gerry Gilmore) is co-ordinator and finance office. Project Office (John Davies, UKATC) supports board, runs some networks, attends board, proposes budgets etc Access Office (Jesus Burgos, IAC) runs telescope grants (ΑΡΙΣΤΑΡΧΟΣ τηλεσκόπιο, ΕΑΑ) JRA’s and some networks have internal management

«Ερευνητικές Υποδομές», 21/12/2004 Projects funded under the FP6 1st call for Transnational Access and Integrated Infrastructure Initiative (FP Infrastructures-1). Transnational access:  OASIS: Optimising Access to SPOT Infrastructure for Science (RITA-CT )  High Field research: Access to research in very high magnetic fields (RITA-CT )  CoSTaR: Coal Mine Sites for Targeted Remediation Research (RITA-CT )  WISSMC: Access to the Braun Submicron Center for Research on Semiconductor Materials, Devices and Structures (RITA-CT )  ALOMAR eaRI: Arctic Lidar Observatory for Middle Atmospheric Research (RITA-CT )  ENGAS: Environmental Gas Management Research Infrastructure(RITA-CT )  SOLFACE: High Flux SOLar FACilities for Europe (RITA-CT )  ULTI: Ultra Low Temperature Installation (RITA-CT )  IHÉS Euro-programme 2: European Visitors Programme at the Institut des Hautes Études Scientifiques to Conduct Advanced Research in Mathematics, Theoretical Physics and other theoretical sciences (RITA-CT ) Integrated Infrastructure Initiatives (I3):  RadioNet: Advanced Radio Astronomy in Europe (RII3-CT )  ILIAS: Integrated Large Infrastructures for Astroparticle Science (RII3-CT )  NMI3: Integrated Infrastructure Initiative for Neutron Scattering and Muon Spectroscopy (RII3-CT )  HadronPhysics: Study of strongly interacting matter (RII3-CT )  HPC-Europa: Pan-European Research Infrastructure on High Performance Computing (RII3-CT )  SYNTHESYS: Synthesis of Systematic Resources (RII3-CT )  LASERLAB-EUROPE: Integrated European Laser Laboratories (RII3-CT )  CARE: Coordinated Accelerator Research in Europe (RII3-CT )  OPTICON: Optical Infrared Co-ordination Network for Astronomy (RII3-CT )  EUROCHAMP: Integration of European Simulation Chambers for Investigating Atmospheric Processes (RII3-CT )  EU-ARTECH: Access Research and Technology for the conservation of the European Cultural Heritage (RII3-CT )  IA-SFS: Integrating Activity on Synchrotron and Free Electron Laser Science (RII3-CT )  EMMAinf: European Mouse Mutant Archive Infrastructure (RII3-CT ) Coordination Actions - ENSCONET: European Native Seed Conservation Network Design studies, Construction of new infrastructures, Accompanying Measures (under negotiation)

«Ερευνητικές Υποδομές», 21/12/2004 OPTICON I3 Networking Structuring European Astronomy (J.Davies). This includes ELT science working group (Hook), AVO/Interoperability (Quinn), HTRA (Spruit), NUVA (Gomez de Castro), Key Technologies (Cunningham), Software (Grosbol) Interferometry working group (A. Quirrenbach, Andrzej Niedzielski, Romain Petrov, Jean Surdej) Telescope Directors Forum (J.Davies) Fellowships and large scale projects (J-LPuget/M. Kessler) NEON Research Experience (M. Dennefeld, IAP) Structuring the ENO (ORM + Izana) Round tables with Radionet, ALMA, NGST etc_

«Ερευνητικές Υποδομές», 21/12/2004 The Telescope Network Anglo Australian Observatory 3.5m Telescope Anglo Australian ObservatorySchmidt Telescope UK Infrared Telescope, Hawaii 3.8m Telescope Canada France Hawaii Telescope3.5m Telescope La Silla, ESO, Chile 3.6m Telescope La Silla3.5m Telescope La Silla2.2m Telescope Isaac Newton Group, Canary Islands 4.2m Telescope Isaac Newton Group2.5m Telescope TNG3.5m Telescope Nordic Optical Telescope2.5m Telescope Centro Astron. Hispano Aleman, Spain 3.5m Telescope Centro Astronomico Hispano Aleman2.2m Telescope Aristarchos, NOA, Greece 2.3m Telescope Observatoire Haute Provence, France1.9m Telescope Telescope Bernard Lyot, France2m Telescope Telescopio Carlos Sancez, Canary Islands1.52m Telescope THEMIS,Solar Telescope Swedish Solar TelescopeSolar Telescope Vacuum Tower TelescopeSolar Telescope Liverpool Telescope2m Telescope Dutch Open TelescopeSolar Telescope

«Ερευνητικές Υποδομές», 21/12/2004 The 2.3m ARISTARCHOS telescope at a new ground-based station at the 2.3 km “Neraidorahi” peak of Chelmos mountain, Peloponese, South Greece (see arrow on map).

«Ερευνητικές Υποδομές», 21/12/2004 The Challenge Create a mechanism for improving access to non- national observing time Provide resources for operation of the telescopes and support of observing runs Implement common R & D projects for infrastructure improvements Calls to non-national users. Same peer review committee, same standards (no special OPTICON TAC). Successful qualifying applicants will get travel support. Telescopes receive audited ‘user fee’

«Ερευνητικές Υποδομές», 21/12/2004 Joint Research Projects VPH Gratings (I) Optical Detectors for HTRA (D) Fast Detectors for AO (F) Smart Focal Planes (UK) Interferometry (NL) Adaptive Optics. (ESO) Details of each JRA is linked from the OPTICON web page In general they are not open to new partners as the contract is signed However, several of them have associated network activities to provide science input

«Ερευνητικές Υποδομές», 21/12/2004 Greece participates in 3 activities: N5: European-wide astronomy (GNCA) N9:OPTICON Telescope Network (GNCA) (Budget: 10 kEuro) A9: Aristarchos telescope (NOA) (Estimated budget: 50 kEuro/year for 20% of telescope time as European time)

«Ερευνητικές Υποδομές», 21/12/2004 Conclusion Εθνική Αστρονομική Επιτροπή στο Managerial Board του μεγαλύτερου Ι3 Open to networking and JRAs for local groups A wide range of EU optical-IR-night-solar telescopes are wide open for new users (T&S for Greek observers) ARISTARCHOS operation fees (20% European time), EAA  international visibility Possibility to use Greek telescopes for teaching schemes (eg NEON- Dennefeld) Greece has entered the European family for R&T in astronomy and participates in a project aiming toward the integration of European astronomical infrastructure