Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.
International Workshop on High Level Radioactive Waste and Spent Fuel Management - Storage and Disposal Status of U.S. Used Nuclear Fuel Disposition Program.
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
Presented to: National Radiological Emergency Preparedness Conference Presented by: Corinne Macaluso, Transportation Specialist Office of National Transportation.
Scoping in the EIA process Proposal Identification Screening
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy A History of Standardized, Multipurpose Canister.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
The Yucca Mountain Repository for Nuclear Waste April 23, 2007 Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
1 GAO Study on Radioactive Waste Management Scenarios Ric Cheston US Government Accountability Office (GAO)
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
Developing a Records & Information Retention & Disposition Program:
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy Community Involvement – An Engineering and Project.
An Overview of the Science, Policies and Politics of a Contentious Subject Nuclear Waste Storage in America Dan Sarles Energy Law Final 12/08/10
Wenxin Zhang Department of Civic Design University of Liverpool
Storage and disposal of mercury and mercury waste in Asia - Conclusions Sven Hagemann GRS.
EM - TRANSPORTATION. EM Office of Transportation - Organization & Responsibilities Basis of Organization & Responsibilities Basis of Organization & Responsibilities.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Mid-Shore CEDS Committee Meeting January 6, 2010.
Nuclear Power Discussion March 25, 2009 Joint meeting of the Legislative Energy Commission; the House Energy Finance & Policy Division; and the Senate.
John Wagner Oak Ridge National Laboratory Nuclear Fuels Storage and Transportation Planning Project U.S. Department of Energy 10 th Meeting of the U.S.-Argentina.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Office of Nuclear Energy U.S. Department of Energy
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Eric M. Davied American Nuclear Society Texas A&M University
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
The Swiss geological programme and the role of storage Jürg Schneider National Cooperative for the Disposal of Radioactive Waste International Workshop.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
Long-Term Spent Fuel Management in Canada International Conference on Management of Spent Fuel from Nuclear Power Reactors Vienna, Austria May 31, 2010.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Office of Major Project Development (OMPD) Overview November 2015.
Planning Commission Study Session: Preferred Plan July 23, 2015.
THE ROLE OF ENERGY COMMUNITIES IN A CONSENT-BASED SITING PROCESS Chuck Smith Councilmember, Aiken County, SC Chair, Energy Communities Alliance NEI Used.
Savannah River Site Watch Columbia, South Carolina
Consent-based Siting in the United States Timothy A. Frazier June 9, 2016.
3 Yankee Companies and National Spent Nuclear Fuel Issue Update
3 Yankee Companies Update and Perspective on SNF Issue
Section 180c Ad Hoc Working Group
Spent Nuclear Fuel and Waste Disposition Program Update
Annual Plan Earlier this week, the SNA Board reviewed the progress we have made to date on the new Strategic Plan that was introduced last year.
NRC’s LLW Regulatory Program: Update of Emerging Issues
Implementing the Transportation/Land Use Connection Program
Nuclear Waste Storage Current Status and Plans
DOE’s Centralized Storage Design Alternatives and Security Regulations Jeff Williams Project Director, Nuclear Fuels Storage and Transportation.
Tribal Radioactive Materials Transportation Committee (TRMTC)
REGULATORY ASPECTS OF RADIOACTIVE WASTE MANAGEMENT IN TURKEY Dr
Presentation transcript:

Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning Project Presented to the Institute of Nuclear Materials Management Arlington, VA January 14, 2013

The BRC Recommended: Storage Facilities, Transportation Preparation, and Stranded Sites “First” 2 “Prompt efforts to develop one or more consolidated storage facilities” “Early preparation for the eventual large-scale transport of spent nuclear fuel and high- level waste to consolidated storage and disposal facilities” “Consolidated storage would allow for the removal of “stranded” used fuel from shutdown reactor sites: …the Commission recommends that spent fuel currently being stored at shutdown reactor sites be “first in line” for transfer to a consolidated storage facility.”

BRC Report - Chapter 13 Near-Term Actions “DOE remains responsible for nuclear waste management activities of the Federal Government, it is important that those steps that do not require the new organization to be in place be initiated as soon as possible.” DOE should : Begin laying the groundwork for implementing consolidated storage (e.g. perform system analyses, design studies) Prepare to respond to information requests from communities, states, and tribes interested in hosting a consolidated storage facility Begin providing funding, for working with state and regional-state government groups and training local and tribal officials in preparation for movement of spent fuel from shutdown reactor sites to consolidated storage Work with nuclear utilities, the nuclear industry, and other stakeholders to promote better integration of storage into the waste management system, including standardization of dry cask storage systems 3

Nuclear Waste Policy Act Guidance on Storage Authorizes the Secretary to site, construct and operate one monitored retrievable storage (MRS) facility subject to conditions. Limited the Secretary from conducting a survey and evaluation of potentially suitable sites until after the MRS Commission submitted its report to the Congress. –This report was submitted November 1, The Secretary may not select a site until the Secretary recommends to the President approval of a site for development as a repository. Site specific activities at each site surveyed to support the application for a license for an MRS may be conducted. Construction of an MRS facility may not begin until the Commission has issued a license for the construction of a repository. The quantity of spent nuclear fuel at an MRS is limited to 10,000 metric tons of heavy metal (MTHM) until a repository first accepts spent fuel and may not exceed 15,000 MTHM. 4

Nuclear Fuels Storage and Transportation (NFST) Planning Project Evolution of Used Fuel Disposition to respond to Blue Ribbon Commission Recommendations for near term program shifts and a major restructuring in the longer term Lay the groundwork for implementing consolidated storage and transportation of fuel from shutdown sites Blue Ribbon Commission Used Fuel Disposition Research and Development mission : Develop a fundamental understanding of disposal system performance in a range of geologic media Conduct research to enable long term storage and subsequent transportation of existing and future spent fuel and waste forms 5

NFST Planning Project NFST Planning Project established to plan for potential storage and transportation activities, October 1, 2012 Initial focus consistent with BRC recommendations for near-term actions related to storage and transportation –Perform systems analysis and design studies for storage facility –Promote better integration of storage into waste management system –Begin working with States Regional Groups and Tribes to prepare for transportation Purpose is to make progress on this important national issue –Build foundation that could be transferred to a new Nuclear Waste Management Organization Activities align with BRC recommendations and existing NWPA constraints 6

NFST Planning Project Storage Activities Objective: Begin laying the ground work by conducting feasibility studies and technical evaluations for implementing the concept of consolidated storage Design Concepts: DOE acquired services of industry to develop design concepts of a consolidated storage facility (CSF). –Three contracts were awarded which have developed three Draft Design Concepts Reports. Standardization: DOE has acquired services of the industry (AREVA and Energy Solutions) to evaluate the feasibility of standardized storage, transportation, and disposal canisters. Generic Conceptual Designs: Based on the Design Concepts Reports, the generic conceptual designs for storage facilities will be developed further. 7

Evaluate an integrated approach to storage, transportation, and disposal in the waste management system with an emphasis on providing flexibility. Evaluate the implications of on-site storage of UNF in large dry storage systems on direct disposal options. Consider factors including emplacement capability, thermal constraints, the need for re-packaging techniques, storage alternatives, transportation, impacts on utility operations. Evaluate measures for flexibility and order of magnitude cost factors associated with each alternative. System Analysis - System Architecture Evaluation 8

NFST Planning Project Transportation Activities Examine successful approaches from past experiences. Objective: Ensure the implementation of a collaborative transportation process for UNF and HLW Re-engage with State Regional Groups and Tribes to better understand stakeholder issues related to the movement of used nuclear fuel. Relationships and processes built to support logistics of shipments to the Waste Isolation Pilot Plant (WIPP) have been successful and the infrastructure and lessons learned from this experience will be utilized moving forward 9

NFST Planning Project Transportation Activities Prepare planning report for shipping stranded fuel from shutdown sites to a consolidated storage facility. Collaborate with stakeholders to address their issues and publish revised NWPA 180(c) policy regarding financial and technical assistance to states along transportation routes for UNF. Develop draft National Transportation Plan. Explore preliminary routes for shipments from shutdown sites. 10

Others Considerations Finding a suitable site is the key to success. The approach to siting and NEPA compliance is in the planning stages. DOE is developing a siting data base documenting past siting efforts (recommended by BRC). Completing a report on findings on public attitudes and preferences concerning the siting of nuclear repositories and interim storage facilities. This work will be able to inform policy makers on plans for initiating a consent based siting process. Legislation will be required to permit many activities. –e.g. linkage between storage and disposal is critical but should not restrict forward movement on storage facilities 11

Ideas for Furthering the Generic Design of Interim Storage Design Concepts work ongoing (Shaw, AREVA, Energy Solutions) –DOE did not specify requirement s (looking for industry ideas) –Good inputs received, differing ideas on consolidated storage facilities –All teams agree that getting rail cars compliant with new FRA rail car standards is a critical path item and should start very soon. DOE will need to prescribe requirements consistent with policy direction Develop in a staged manner –Start with what is simplest and easiest (pilot interim storage facility) –Shutdown sites first –Additional fuel handling capability later (larger interim storage facility) –Flexibility Design would be developed consistent with local and state consent –Could include size, fuel handling capability (e.g. pools, hot cells), land requirements –Consideration of jobs and other benefits –Capacity (i.e. amount of UNF) –Type of material to be handled (e.g. DOE owned materials be considered) –Throughput and ramp-up rates 12

Conclusions DOE has initiated activities that align with the BRC near-term action recommendations. –Planning project established to initiate actions –Evaluating consolidated storage options –Focusing initially on stranded fuel at shutdown sites –Established cooperative agreements with State Regional Groups for transportation planning –Progress on siting is key to being able to establish a Pilot Interim Storage Facility by 2021 Activities conducted will stay within existing authorizations (Atomic Energy Act and Nuclear Waste Policy Act) until we have new authorization and money to proceed. If a new organization is established, the Administration will carefully evaluate the appropriate activities to be transferred. 13