TVD process. Features & Benefits Increases productivity and shortens the erection time. Lowers non-productive work (forms and shuttering). Heavy building.

Slides:



Advertisements
Similar presentations
COST EFFECTIVE MASS HOUSING TECHNOLOGY
Advertisements

USC Viterbi School of Engineering. Automated Imbedding of Steel Reinforcement Mesh.
Innovative New Technologies in Building & Construction.
An-Najah National University
Clark–Reliance Company Manufacturing Update Presented to General Electric July 17, 2007.
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Brief Introduction of 3D Construction System
Optics Career Path Works with engineers to produce optics, and assists with research and development Associate Degree Pay Range: $14-$20/hr Generates designs,
Striving to exceed customer demands by delivering the best.
Cement plant 1.5 / 1.2 / 0.6 Mio TPA Brand NEW. World cement production 2012 Source: Wikipedia.
OSHA Subpart Q Concrete and Masonry Construction.
Computer Integrated Manufacturing CIM
MMEC LLC dba MidwestMetalcraft & Equipment 200 Industrial Drive Windsor, MO Office: (660) Fax: (660)
By:Gord Darling Construction Technology
Simple Machines. Would it require more work to take 100, 1kg books to the book room one at a time, or to take them in stacks of 20? Why?
Reinforced Concrete VS Steel
Predictive Maintenance: Condition monitoring Tools and Systems for asset management September 19, 2007.
BHEL Haridwar. BHEL – A Glance Indian integrated power plant equipment manufacturer, established in Products and services available for Power, Transmission,
3200A Electrical Test Equipment Calibrator. Automatic Loop Correction To simplify calibration of loop testers, the 3200A can be fitted with the Auto.
Lathe and drilling machines
Chapter 4 Measuring Concrete Work
Tools of the Trade Common Tools used with Master Wall Systems Presented by With thanks to.
Designing Goods and Services and Process Selection
Output Devices.
Process (Job Shop) Layouts
Free Powerpoint Templates Page 1 Free Powerpoint Templates Page
From Research Prototype to Production
Lathe and drilling machines
Hand Tools, Fasteners, and Hardware
Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
1. Out line  Site description  Architectural Design.  Structural Design  Environmental Design.  Mechanical design  Safety design An-Najah National.
ANKITHA CHOWDARY GARAPATI
Demonstration of Vulcan Software. Content Demonstration Introduction to Vulcan GUI Project Description Creation of Model Analysis.
WAEM WIRED Alliance M3 Credential Modern, Multi-Skill, Manufacturing.
Simple Machines.
Session 3 Classification of lathes Kinematics system of centre lathe
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Objective 6.03 Remember tools and their safety practices related to the agricultural mechanics industry.
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
The four basic types of structures are :
Agricultural Mechanics Career Development Event Concrete and Masonry
Designing Goods and Services Chapter 3, Part 1. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work.
Agricultural Engineering 7.0 Careers related to the agricultural engineering industry.
Tool Identification 1. Adjustable Wrench 2. Allen Wrench.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
Introduction to Building Trades Denver High School.
Automation of the 27.1 kN Dead Weight Machine at NIST Kevin Chesnutwood, Samuel Ho NIST Mass and Force Group Stop 8222, 100 Bureau Drive Gaithersburg,
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Use of Hand Tools In Agricultural Mechanics Shops
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
IA II Tool ID Metals.
Constraints Space Load Capacity Costs Operating hours.
A machine is a device that helps make work easier to perform by accomplishing one or more of the following functions: transferring a force from one place.
IA II Tool ID Metals.
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Remember tools and their safety practices related to the agricultural mechanics industry. Objective 6.03.
Work and Simple Machines
Concrete and Masonry Construction 29 CFR 1926, Subpart Q
Wrangle Hill Elementary School New Castle, DE
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Work and Simple Machines
What are the Requirements of an Effective Construction System?
Analysis And Design Of AS-Shorooq Residential Building
Presentation transcript:

TVD process

Features & Benefits Increases productivity and shortens the erection time. Lowers non-productive work (forms and shuttering). Heavy building machines are unnecessary. Diminishes need for qualified workers. High thermal and sound insulation qualities. High seismic resistance. High quality building with simple maintenance. Lower building costs for up to 30%.

TVD Certificates International Patent Certificates

TVD safety and quality assurance Structural tests and verification calculations Faculty of Civil Engineering, Mostar,BH Institute of Civil Engineering,Osijek,HR

TVD design

TVD design-1 Social housing and luxurious habitations

TVD design-2 Structural analysis and details

TVD design-3 Items supplied for TVD design L.1. Computer hardware consisting of: -two Power Macintosh 9100 as a work station with 20” monitor; -two laser HP printers; -two high speed modem for communication with the Office; -one flat-bed scanner; -one A0 Ink-jet plotter; -four bureau tables and chairs L.2. Computer software consisting of: -two sets of TVD software packages for design, calculation, and supervision of building. For TVD design a design team consists of: - one architect, one engineer and two technicians.

ne production line produces enough TVD panels for m2 of buildings. TVD panel production line One production line produces enough TVD panels for m2 of buildings.

TVD panel production line-1 Axonometric view of production line and storage area

TVD panel production line-2 Samples of production’s line machines

TVD panel production line-3 Items supplied for TVD panel production line: In its minimal configuration with a capacity of ca ,00m2 of finished TVD panels. –Item A: (a) wire uncoiling reels for drawn wire consisting of: –wire rod holding fingers to hold wire bar coils for vertical pay-off; –one machine for bar straightening and cutting at required length; –one machine for bar bending. (b) adjustment of reinforcement meshes; –one machine for mesh cutting; –Item B: (a) one machine for steel connection elements – consisting of an hydraulic press and forming tiles; (b) one machine for Polyethylene connection elements – consisting of the PE production machine and forming tiles.

TVD panel production line-4 –Item C: (a) one machine for Polystyrene block cutting –consisting of a fixed support, mobile carriage, insulated support, current generator and monitoring electric board. (b) two machines for Polystyrene punching –Punching of the polystyrene foam blocks at the size of panel so that they are placed in vertical position and hydraulically pressed against preheated thermo-spears placed in the positions required for the fixing of the connection elements. Thermo-spears can have variable positions in order to suit the particular structural need. –Item D: (a) three machines for assembling of panels –Panel assembling is done in a vertical position so that reinforcement meshes and thermo elements are placed in their final position. Connection elements are then fixed manually in the particular position.

TVD panel production line-5 –Item E: (a) one machine for packing finished panels –Stacked finished panels (6 panels in a stack) are placed on the machine and tied together with stripes for easier manipulation and transportation –Item F: (a) two fork-lift trucks (10 kN) –Item G: (a) one set of tools for electrical and mechanical maintenance –hand drill with D=13mm –set of screw keys and tools for mechanical maintenance –set of accessories and instruments for electrical maintenance –arch welder for electrodes –column drill with D=16mm –column grinding wheel –working bench and two shelves

TVD panel production line-6 –Optional items: –Item H: Complete automation of production and storage lines –To connect production to storage lines with steel frames and guiding rails to enable easier, faster and semi-automatic transport of the elements. –Item I: Polystyrene foam unit –To transform polystyrene granulates into foam blocks. –Item J: Electrowelded mesh unit –To produce electrowelded reinforcement meshes. –Production building For the production line in its minimal configuration (with the possibility of later additions), the building should be around 1650m2, i.e. 27m large x 60m long and 6m high; a storage surface place of ca. 650m2 would also be recommended to stock the panels.

TVD building TVD building phases for a storey

TVD building-1 TVD building phases for a storey

TVD building-2

TVD building-3

TVD building-4 Items supplied for TVD building: Corresponding to the estimated need of one 8 hours/day shift. –Item K: 1.(*)two concrete mixers for concrete preparation 2.(*)two “gun” machines for spraying of concrete 3.(*)set of accessories for the montage consisting of: –four electric circular saws for cutting out of openings; –two electric hammers; –four scissors for reinforcement cutting; –two sets of accessories for panel and slab placement: – two sets of accessories for concrete works consisting of: shovels, buckets, wheel barrows; – two sets of accessories for wall finishing consisting of: trowels, floats, hand levels, templates and finishing lineals; – two sets of accessories consisting of: hammer, sledge hammer, chisel, crow bar, pliers.

TVD building Apartment building on the island Krk, HR

TVD building Multi-storey block house in Zagreb, HR

TVD building Apartment building in Bos. Petrovac, BH

TVD and other building methods CIB World Building Congress 1998, Gavle, Sweden

TVD process The complete TVD process system package consists of: A. TVD design comprising a 5 year licence, know-how and software (Item L) B. TVD panel production line in its minimal configuration (which could be enlarged to suit particular needs). Following option(s) can be added: Complete automation of the production line; Electrowelded mesh unit; Polystyrene foam unit. C. TVD building comprising the equipment needed for building process (Item K), technologies for concrete preparation and building erection. D. One year technical assistance comprising control of equipment, training of staff for TVD design, TVD panel production and TVD building), as well as supervision of a site. E. Preliminary design or adaptation of a project for every situation will be dealt separately.

TVD process Sustainable building system for the next century Info: Prof. dr. sc. Vladimir Sigmund, BCE Faculty of Civil Engineering Drinska 16a, Osijek Croatia