North-of-the-Delta Offstream Storage Investigation Planning and Timeline “Planning is bringing the future into the present so you can do something about.

Slides:



Advertisements
Similar presentations
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Advertisements

Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
BoRit Superfund Site Timeline
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
1 NODOS/Sites Reservoir: A Local Perspective Glenn Colusa Irrigation District July 2009.
Department of Water Resources Role in Water Transfers Jerry Johns, DWR
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Wesley Henson, Alex Boswell-Ebersole, Molly Carver, Cristian Pacheco Skills Practicum, Summer 2012.
1 N ORTH - OF - THE -D ELTA O FFSTREAM S TORAGE S ACRAMENTO R IVER C ONSERVATION A REA F ORUM TAC N ORTH - OF - THE -D ELTA O FFSTREAM S TORAGE S ACRAMENTO.
Yakima River Basin Water Storage Feasibility Study 2007 Climate & Water Resource Forecast meeting Kelso, WA Kim McCartney Upper Columbia Area Office October.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
1 Measuring Performance of Resource Management Responses Rich Juricich (DWR) David Groves (RAND)
California: “Water Flows Uphill to Money” DZ05 Lecture 12/5/2005 Sources: Cadillac Desert, by Marc Reisner, 1993, and POD Documents.
Drought and the Central Valley Project August 2014.
Use of Regional Agricultural Economic Models for Policy Analysis Stephen Hatchett CH2MHILL.
Connecticut Department of Transportation Bureau of Policy & Planning.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Design Phase Coordination and the Regional Environmental Coordinator’s Role.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
1 Beyond California Water Plan Update 2005 California Water and Environmental Modeling Forum Annual Meeting, March 3 rd, 2005.
Three Gorges Project: A Project of the Century By: Xinyu Huang.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Urban Water Institute Annual Water Conference August 27, 2015 S ITES R ESERVOIR P ROJECT
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Arroyo.
1 Development of Common Assumptions Common Model Package for the CALFED Surface Storage Investigations Presentation To: California Water and Environmental.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Managing Western Water as Climate Changes Denver, CO February 20-21, 2008.
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Central Valley Project Cost Allocation Study -- Irrigation and Municipal & Industrial (M&I) Benefits Public Meeting August 9, 2013.
UNDERSTANDING THE DELTA - AN ENGINEERING PERSPECTIVE.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
OCAP/SDIP Public Information Meeting Chet Bowling - Intro Ann Lubas-Williams – OCAP Andy Chu – SDIP Jerry Johns – EWA Ron Ott – Other CALFED Activities.
Effects Analysis and Comparison. Objectives Accurately determine which impacts need to be evaluated in the land use plan. Develop a matrix comparing the.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Margaret Byrne, U.S. Fish and Wildlife Service
Project Status South Delta Improvements Program Project Status November 2003.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
BASIN SCALE WATER INFRASTRUCTURE INVESTMENT EVALUATION CONSIDERING CLIMATE RISK Yasir Kaheil Upmanu Lall C OLUMBIA W ATER C ENTER : Global Water Sustainability.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
In-Delta Storage Program Reservoir Operations Stakeholders Committee Meeting January 22, 2003 Pal Sandhu.
Defining Good Ecological Potential : Method used in the UK Niall Jones Hydro-morphology senior advisor Environment Agency.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Road map hydrology and water allocation SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning in Turkey.
December 14, 2011 California Natural Resources Agency Public Meeting.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
GOOSE CREEK WATERSHED LEVEL I STUDY SCOPING MEETING
Anne Arundel County Maryland
Sites Reservoir Project: Water Supply Investment Overview
California Water Commission
Presentation transcript:

North-of-the-Delta Offstream Storage Investigation Planning and Timeline “Planning is bringing the future into the present so you can do something about it now.” -Alan Lakein Begin Presentation

Introduction to the NODOS Presentations ~This is the first presentation in a series of four and will go over the planning work and timeline of the NODOS Project ~The interactive menu to the left can be used to move back and forth within the presentation as well as the buttons down below ~Internet Explorer Users - To exit at any time, click the Back Button on your browser ~All Other Users – To exit at any time, push escape on your keyboard ~This is the first presentation in a series of four and will go over the planning work and timeline of the NODOS Project ~The interactive menu to the left can be used to move back and forth within the presentation as well as the buttons down below ~Internet Explorer Users - To exit at any time, click the Back Button on your browser ~All Other Users – To exit at any time, push escape on your keyboard Introduction Introduction Schedule Publications Analytical Tools Analytical Tools Studies Navigation Menu NextBack

Schedule Reports and Planning Schedule Introduction Schedule Schedule Design & Construction Schedule ► ◄ Planning & Reports Schedule Design and Construction Schedule Navigation Menu NextBack Publications Analytical Tools Analytical Tools Studies Year 8 Year 7 Year 6 Year 4 Year 2 Year 3 Year 5 Year 1 Schedule Design Construction Maximum Estimation Minimum Estimation Design is estimated to be 2 to 3 years Construction is estimated to be 5 to 7 years Initiation of Federal Feasibility Study Notice of Intent/Notice of Preparation Initial Alternatives Information Report Public Scoping Scoping Report Plan Formulation Report Federal Feasibility Study Report and Environmental Documentation State Feasibility Report Draft Final

Publications Introduction Schedule ~NODOS Progress Report (July 2000) ~Memorandum of Understanding between local water agencies and CALFED agencies ~Notice of Preparation and Notice of Intent ~Scoping Report ~Notice of Initiation of Federal Feasibility Study ~NODOS Initial Alternatives Information Report (May 2006) ~Link to DWR-DPLA website to view the publications: ~NODOS Progress Report (July 2000) ~Memorandum of Understanding between local water agencies and CALFED agencies ~Notice of Preparation and Notice of Intent ~Scoping Report ~Notice of Initiation of Federal Feasibility Study ~NODOS Initial Alternatives Information Report (May 2006) ~Link to DWR-DPLA website to view the publications: Navigation Menu NextBack Publications Publications Analytical Tools Analytical Tools Studies

~Completed Studies –ESA Protocol Level Surveys –Wetland Delineations –Engineering Studies Glenn Colusa Irrigation District Canal Feasibility Tehama-Colusa Canal Feasibility Sacramento River Conveyance Funks Reservoir Enlargement Sites Reservoir Dams and Appurtenant Structures Road Relocations –Fish and Wildlife Surveys –Recreation Opportunities ~Completed Studies –ESA Protocol Level Surveys –Wetland Delineations –Engineering Studies Glenn Colusa Irrigation District Canal Feasibility Tehama-Colusa Canal Feasibility Sacramento River Conveyance Funks Reservoir Enlargement Sites Reservoir Dams and Appurtenant Structures Road Relocations –Fish and Wildlife Surveys –Recreation Opportunities Introduction Schedule ~Ongoing Studies –Sacramento River Flow Regime –Cultural and Historic Resources –CALSIM II Operations Modeling Studies of NODOS Scenarios –Indian Trust Assets –Socioeconomics –Environmental Justice –Public Health and Environmental Hazards –Water Quality –Power Production and Energy –Groundwater and Surface Water Resources ~Ongoing Studies –Sacramento River Flow Regime –Cultural and Historic Resources –CALSIM II Operations Modeling Studies of NODOS Scenarios –Indian Trust Assets –Socioeconomics –Environmental Justice –Public Health and Environmental Hazards –Water Quality –Power Production and Energy –Groundwater and Surface Water Resources Ongoing Studies ► ◄ Completed Studies Navigation Menu NextBack Publications Analytical Tools Analytical Tools Studies Studies

Analytical Tools Analytical tools developed by Common Assumptions as part of the Common Model Package Existing Tools in Use ~Water Resource System (CALSIM II) ~Economics (LCPSIM, CVPM) ~Delta Flow and Salinity (DSM2) ~Sacramento River (Keswick to Red Bluff) –Temperature ( SRWQM) –Salmon Production (SALMOD) ~Power Generation and Use –CVP (LTGen) –SWP (SWP Power) Analytical tools developed by Common Assumptions as part of the Common Model Package Existing Tools in Use ~Water Resource System (CALSIM II) ~Economics (LCPSIM, CVPM) ~Delta Flow and Salinity (DSM2) ~Sacramento River (Keswick to Red Bluff) –Temperature ( SRWQM) –Salmon Production (SALMOD) ~Power Generation and Use –CVP (LTGen) –SWP (SWP Power) Introduction Schedule Navigation Menu BackNext Publications Analytical Tools Analytical Tools Studies

Analytical Tools Other physical process and biotic analytical tools are being developed by DWR, Reclamation, and others that may be useful for the NODOS investigation in evaluating the effects of NODOS alternatives, these tools include: Introduction Schedule Navigation Menu Back Publications Analytical Tools Analytical Tools Studies ~Sediment transport ~River meander migration/Habitat species ~Riparian habitat establishment ~Linkages between Sacramento River flows and ecological targets End

End of Presentation ~Internet Explorer Users - To exit, click the Back Button on your browser ~All Other Users – To exit, push escape on your keyboard ~Internet Explorer Users - To exit, click the Back Button on your browser ~All Other Users – To exit, push escape on your keyboard Introduction Schedule Navigation Menu Publications Analytical Tools Analytical Tools Studies