Task Force meeting #29, Lund, November 2012 - Task 8 1 Some ideas for continuation of Task 8 Task 8 is intended to lead to:Task 8 is intended to lead to:

Slides:



Advertisements
Similar presentations
Section 13.3 & 13.4 Centripetal and Centrifugal Forces
Advertisements

Sources of water (RAIN)
W.BrewitzEuradwaste_041 Site Specific RTD (BfS) Characterisation of the Gorleben Site moratorium (max. 10 ys) Applied Basic RTD (BMWA) RTD on Radwaste.
Commercial / Residential Applications. Why Water? Most efficient 5,1 cm water pipe = 61 cm air duct Less space Higher mass and thermal conductivity Benefit.
Oil & Gas drilling.
Lithuanian concept for disposal of
KBS-3H Initial State Lucoex Workshop: Installation, closure and initial state May 13-14, 2014 Antti Öhberg.
Geothermal Alliance of Illinois Getting it Right the First Time.
EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
OCEAN WAVES CHANGE COASTLINES.
Foundations Purpose – To transfer weight of structure (including live loads) to the ground within allowable settlement criteria.
 Location – Maneri to Uttarkashi, India  Length – 8.56km long, diameter 4.75m  Use – a power tunnel, part of the hydro-electric project on the River.
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
Foundations and basements
GROUNDWATER CONTROL.
ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.
Geological Problems Encountered and Solutions Implemented
 Abandon the site and locate the structure elsewhere  Design deep foundations to carry the weight of the structure to competent stratum  Redesign the.
Henderson Mine Site. Henderson Mine Central Campus Shaft Collar Elev 10,400 ft Shaft Bottom Elev 7,500 ft LA Ramp Primary Access Ramp 3600 ft Central.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
How to Calculate the Volume of a Well. Introduction Discuss which dimensions are needed. How to obtaining the dimensions. Example Alternative method.
Task #8: Hydraulic interaction rock/bentonite Objectives: Scientific understanding of the exchange of water across the bentonite-rock interface. Better.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Sources of water (RAIN)
Posiva Oy Olkiluoto Eurajoki Puh. (02) 8372 (31) faksi (02) DOPAS Demonstration of Plugs and Seals Posiva Plug Experiment POPLU at URCF.
LUCOEX Large Underground Concept EXperiments 2011 – 2014 Work Package 5 KBS-3V Emplacement tests in ONKALO Progress and Plans Project Progress Meeting.
1 Modelling Task 8 EBS Task Force Meeting 16, Lund, 28 November 2012 Dr. David Holton Dr. Steven Baxter
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Problem: surface ponding. Solution: surface or subsurface drainage.
Handling of Future Human Actions in the safety assessment SR-Site Eva Andersson.
Discussion on Modeling Stefan Finsterle Earth Sciences Division Lawrence Berkeley National Laboratory 29. Task Force Meeting Lund, Sweden November 29-29,
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
1 7. R EPETITIVE C ONSTRUCTION Objective: To understand how production and production rates are affected by repetition of tasks, and to learn how to plan.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Runs of Material. Fatal (Traumatic) Accident Analysis Efffort Fatal Report 1970 – 2012 April 7/12 TotalPercentage Explosives16 4.6% Fall of Rock7822.3%
Nova R&D – Access to the largest geosphere laboratory in the world –Äspö HRL Marcus Laaksoharju and Anna Rockström
高階核廢終極處置的基本信念:人不能勝天 Rocky Lai 10/05/2015. High-level radioactive waste management in Sweden 10 operating nuclear reactors that produce about 45% of its.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
1 Sergeants Time TrainingVisitorsBook. 2 Water Purification and Collection.
Sulfate Ion Wet Deposition
Ammonium Ion Wet Deposition
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
The Natural Pool To advance to the next slide, click your mouse button. To end the show, close the window.
Devico AS Olkiluoto September, Olkiluoto nuclear power plant Olkiluoto Nuclear Power Plant is one of Finland's two nuclear power plants. The Olkiluoto.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Borehole drilling.
Report from the Crystalline rocks & buffer workshop Mattias Åkesson, Clay Technology AB.
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
Construction Beam Tunnel
Bobcats On Tracks :
Section Engineers Meeting March 6, 2014 Lexington, KY.
1 António Pereira Fysikum The backend of the nuclear fuel cycle in Sweden.
Bruno POTTIN, Anne-Catherine CHAUVEAU
CLIC / ILC Collaboration for CFS works
Latest ILC tunnel cross section May 2017
Tunnelling under lake Geneva
Software Engineering Architectural Design Chapter 6 Dr.Doaa Sami
EAG346-Sem II 2014/2015 Lesson 2.
Hoover Dam.
الوحدة 20 مهارات التواصل مع الآخرين
EROSION.
November 6, 2014.
Diaphragm Wall Construction Long sections of the cut and cover use diaphragm walls to support the sides of the open excavation, while work on the.
EROSION.
Dolphin 5 Introduction Provisional Patent Draft Drawings for “Article of Manufacture” Drawings A to D 3/4/2012 Provisional Patent Draft Drawings D5-A to.
Work Breakdown Structure Tasks and Sub-Tasks
BET403 Cost Engineering Individual Assignment & Group Report
Presentation transcript:

Task Force meeting #29, Lund, November Task 8 1 Some ideas for continuation of Task 8 Task 8 is intended to lead to:Task 8 is intended to lead to: –Scientific understanding of the exchange of water across the bentonite-rock interface –Better predictions of the wetting of the bentonite buffer –Better characterisation methods of the canister boreholes –Better methods for establishing deposition hole criteria

Task Force meeting #29, Lund, November Task 8 2 Some ideas for continuation of Task 8 Task 8e Prediction of deposition hole interactions Stand alone simulations (no direct BRIE interaction) Open and closed deposition hole issues Back filled deposition tunnels issues

Task Force meeting #29, Lund, November Task 8 3 Some ideas for continuation of Task 8Synthetic siteAnother site e.g. ONKALOPrototype

Task Force meeting #29, Lund, November Task 8 4 Some ideas for continuation of Task 8

Task Force meeting #29, Lund, November Task 8 5 Some ideas for continuation of Task 8

Task Force meeting #29, Lund, November Task 8 6 Some ideas for continuation of Task 8

Task Force meeting #29, Lund, November Task 8 7 Some ideas for continuation of Task 8 A Tunnel Boring Machine (TBM) was used for excavating the drift, 65 m long and 5 m in diameter. A data acquisition tunnel was excavated sub parallel to the repository drift. A sump was bored so the wet inner part of the tunnel could be drained. Six vertical deposition holes, 8.37 m deep and 1.75 m in diameter, were bored in the tunnel. The Prototype Repository is divided in two sections, both ending with a concrete plug. The deposition holes are equipped with heaters and buffer as in CRT. The first 11 m tunnel in section 1 is backfilled with crushed rock and the remaining tunnel with 30% bentonite and 70% crushed rock.

Task Force meeting #29, Lund, November Task 8 8 Some ideas for continuation of Task 8