Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Vacuum and cryogenic systems in R5.2 for MICE Presentation to the MICE/ISIS Operations meeting on 16/03/2015.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Electrical & Control Power Supplies Trevor Hartnett.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
1 MICE MPB/RLSR Integration of Step IV Readiness of the major subsystems Installation sequence and schedule considerations Logistics, staffing and local.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE Power Supply System John Joseph LBNL Spectrometer Solenoid Controls & Monitoring Review Dec 11 th 2012.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Power Supply System Discussion Topics Steve Virostek / John Joseph LBNL Spectrometer Solenoid Workshop May 10, 2011.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
MICE Spectrometer Solenoids Step IV running
S A Griffiths CM42 June 2015 Electrical & Control.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Electrical Configuration and System Protection
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
MICE RF System Power Supplies, Control and Monitoring Status report
Electrical & Control.
MICE CM31 Schedule summary
ATF2 Magnet Power Supplies
LV Safe Powering from UPS to Clients
Focus Coil Quench Detector
TEST PLANS for HL LHC IT STRING
Presentation transcript:

Electrical Installation CM39 Andy Gallagher & Ian Mullacrane

Contents Rack Room 2 Electrical Distribution UPS System Network Cooling water for SS energy absorbers SS & FC Magnet Connection Boxes Compressor installation Remaining rack build Vacuum rack & compressor controls Diffuser and Tracker Control rack EMR Rack

Rack Room 2 –Equipment Layout Room complete, all distribution boards installed, UPS & Battery Rack installed, Air Conditioning installed. Allocation and position of racks and equipment for Step IV agreed and finalised. FC Quench Detection Systems – to be installed in RR2. Reserved

Rack Room 2 – Step IV Equipment Layout Step V Not required Step VI Rack space allocated for Step V equipment. 1 Rack space available (no Step VI)

Rack Room 2 – Electrical Distribution Surge protection Chillers no longer required

Rack Room 2 – UPS Battery Pack UPS UPS By-pass switch UPS Distribution Board to include surge protection.

Rack Room 2 – UPS Inverter and Batteries Riello Multi Sentry UPS – 3 Phase - Double Conversion Technology As the cooling water will be supplied from the ISIS system we no longer require total >1hour autonomy. Some spare capacity available. UPS for Critical Loads Batteries

Rack Room 2 - Network Existing network cables to be re- used 24-port Network switch with 100Base-FX uplink allocated in Control Rack UPS & Air Conditioning can be monitored via network if required. Wireless router could easily be installed in RR2

First 2 Racks Delivered From DL - AFC 1/2 Control Rack – Instrumentation delivered by August. AFC 1/2 Power Supply Rack

Cooling Water For Energy Absorbers It has been proposed to utilise the ISIS water cooling system The ISIS system has sufficient capacity. Sufficient cooling in the system to cope with load in the event of a power failure. Water flow and temperature interlocks – control philosophy to be agreed.

Magnet Termination Boxes Spectrometer 1 & 2FC 1 &

Magnet Termination Boxes – South Mezzanine Termination Boxes spaced appropriately along cooling channel

Compressor installation 13 Power Distribution Boards in place. Require Compressor stands to be located to allow power & controls wiring to be installed.

Remaining rack builds. SS Downstream – Basic rack build complete – waiting for equipment from USA. Absorber rack – upstream complete, downstream waiting for equipment from USA. Vacuum control rack – basic rack complete – design work underway. EMR rack – All equipment to be re- located in a new 47u rack. Design agreed. 2 Quench Detection racks to be designed & built. Diffuser & Tracker rack 2. Design complete. Vacuum Rack – design underway.

Spectrometer Solenoid Energy Absorber Rack Upstream SS energy absorber tests complete. Cooling water circuits have been modified and flow indication added. Downstream SS energy absorbers due for delivery late July Energy Absorber Rack-Rear with and without DC Cables Items Required

Quench Detection & Protection Racks SS QD / QP System rack FC QD / QP System rack RFCC QD / QP System rack The location of the FC QD systems is agreed. Reliable operation with 40m voltage tap cable lengths has been confirmed. Two FC QD systems have been assembled and tested. One system is currently being used for training the FCs. The location for SS QD systems to be confirmed. A 3rd SS QD system is to be assembled, tested and installed before Nov 2014.

Focus Coil & Spectrometer Solenoid PSU Racks These 4 racks are all designed. Assembly is completed apart from SS#2 PSU rack.

Diffuser and Tracker Control Rack The rack design is complete. The rack will be assembled ready for population with equipment by September Tracker & cryostat Interlock crates Diffuser control crate Diffuser air valve crate

Compressor & Vacuum Control Rack The control system requirements for the compressors are agreed and the rack physically assembled. Vacuum flow diagram agreed and design is underway.

Questions? CM39 A Gallagher & Ian Mullacrane Acknowledgements Chris White Trevor Hartnett John Webb Steve Griffiths