ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – 4 4 4 2 – P R E – 0 0 0 0 0 1 1 6 - B.

Slides:



Advertisements
Similar presentations
Categories of I/O Devices
Advertisements

Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
User Oriented APIs for Timing System Jim Chen Hytec Electronics Ltd Timing Workshop – 5 th June 2014, Prague.
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
New hardware and setups New short pulse regime Experimental results TW power Future plans on laser development ATF CO 2 LASER progress Vitaly Yakimenko.
256 channel data acquisition system for VISTA focal plane to readout sixteen 2k x 2k Raytheon VIRGO detectors Largest ever such system Leander H. Mehrgan.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut SwissFEL Timing System.
EML 2023 – Motor Control Lecture 4 – DAQ and Motor Controller.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
CCFE is the fusion research arm of the United Kingdom Atomic Energy Authority Real time operation of MAST TS diagnostic S. Shibaev, G. Naylor, R. Scannell,
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 26/4/2004 Multi-channel Data Acquisition System Final_A Presentation.
Progress in sub-picosecond event timing Ivan Prochazka*, Petr Panek presented at 16 th International Workshop on Laser Ranging Poznan, Poland, October.
The importance of switching in communication The cost of switching is high Definition: Transfer input sample points to the correct output ports at the.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Yu. Artyukh, V. Bespal’ko, E. Boole, V. Vedin Institute of Electronics and Computer Science Riga, LATVIA 16th International Workshop on Laser.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
Data Acquisition. Data Acquisition System Analog Signal Signal Conditioner ADC Digital Processing Communication.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Engineering 1040: Mechanisms & Electric Circuits Fall 2011 Introduction to Embedded Systems.
The TIMING System … …as used in the PS accelerators.
FID Based Pulse Generators for Accelerator Applications Vladimir M. Efanov FID GmbH, 25 Werkstrasse, Burbach, D-57299, Germany 2006.
Moore’s Law and Modular Instrument Technology Speaker/Author:Paul Packebush Senior Group Manager Corporate Metrology, R&D National Instruments N.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Computer Organization ANGELITO I. CUNANAN JR. 1. What is Computer?  An electronic device used for storing and processing data.  It is a machine that.
30. Nov I.Will, G. Klemz, Max Born Institute: Optical sampling system Optical sampling system for detailed measurement of the longitudinal pulse.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Hardware.
PH4705 & ET4305: Digital Sensors
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
GBT Interface Card for a Linux Computer Carson Teale 1.
Digital Electronics and Computer Interfacing
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
REDNET Prototype overview Rok Stefanic the best people make cosylab.
The PITZ Timing System Frank Tonisch DESY - Zeuthen.
Casper 2010Marc Torres Part 2: Building blocks for the next generation.
General Concepts of Computer Organization Overview of Microcomputer.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
REDNet - Status overview Rok Stefanic Ziga Kroflic
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
NCSX NCSX Project Meeting March 21, 2003 G. E. Oliaro Slide 1 WBS5 Central Instrumentation/Data Acquisition and Controls G. E. Oliaro Computer I&C, Network.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
ESS Timing System Prototype 2012 Miha Reščič, ICS
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting June 5, 2001.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Page Beam Instrumentation mini- workshop Conclusions from the Hardware, Timing and MPS mini-workshop Lund, Miha Reščič Deputy Head of
Gamma Beam System at ELI–NP The ELI–NP Team* ELI–NP, IFIN–HH, Bucharest–Magurele, Romania * The ELI–NP Gamma Beam System (GBS) will.
Marseille 29 January 2013 Diego Real IFIC (CSIC – Universidad de Valencia) Instrumentation for Optical Calibration: Laser Beacon and Nanobeacon.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
9530 T IMING C ONTROL U NIT Features TCU-1 Key Features 250ps timing resolution with < 50ps jitter 8 independent outputs with full individual programming.
Status of the SPARC laser and “dazzler” experiments
Synchronization issues
LCLS_II High Rep Rate Operation and Femtosecond Timing
LASER SAFETY External EHS Expert Panel Workshop
UK FEL development package WP6:
Y.Chen1, B.J.Xiao1, 2, F.Wang1, S.Li1, F.Yang1, 3
PADME L0 Trigger Processor
Timing and synchronization at SPARC
Status of Fast Controller EPICS Supports for ITER Project
FPGA Based Trigger System for the Klystron Department
asyn Driver Tutorial Measurement Computing 1608GX-2A0
Presentation transcript:

ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B

ELI Facility Timing System E L I – B L – – P R E – B ELI Beamlines Facility Structure Physical structure of ELI Facility: ● 4 lasers ● 5 experiments ● Server room ● Main control room Technology Subsystems of ELI Facility: ● High power lasers and diagnostic lasers ● Beam distribution ● Beam alignment ● Beam diagnostics ● Experiments

ELI Facility Timing System E L I – B L – – P R E – B Main Roles and Tasks of Electronic Timing System (ETS) ● The facility level timing system is part of facility level control system ● All lasers are complex subsystems from the point of view of facility level control and timing systems ● The facility level timing system must provide required functionality to all facility subsystems: 1.Synchronization of all subsystems during operation 2.Trigger signals for all devices during operation Tasks provided by facility level depends on: ● Facility structure (beam distribution) ● Functionality provided by each subsystem

ELI Facility Timing System E L I – B L – – P R E – B Main Roles and Tasks of Electronic Timing System (ETS) Laser subsystem Each laser is driven by its local timing system. Local timing systems are not based on the same technology: ● L1 in house developed (MRF based ETS) ● L2 will be delivered later (Unknown) ● L3 contracted to LLNL (Greenfield based ETS) ● L4 will be delivered later (Unknown) Therefore each laser subsystem must provide basic interfaces for proper operation in complex technology: ● Access for laser subsystem settings and driving ● Input for central clock signal for synchronization ● Input for laser triggering

ELI Facility Timing System E L I – B L – – P R E – B Main Roles and Tasks of Electronic Timing System (ETS) Alignment, Diagnostics and Experiment subsystems Requirements depends on type of devices which would be triggered ● High speed devices (Streak cameras, Alignment lasers, high speed digitizers and other high speed detectors) ● Low speed devices (CCD/CMOS cameras, lower speed ADC and other detectors) Therefore two types of delay generators are required: ● High precision delay generators ● Low precision delay generators

ELI Facility Timing System E L I – B L – – P R E – B Timing System Levels There are three different levels when looking at the expected timing accuracy: ● Femtosecond level that is required whenever two or more femtosecond beams are overlapping at the focal spot. Typical requirement would be a timing overlap better than half the pulse duration (ie. ~10fs range). ● Picosecond level that is commonly accessible with electronic devices. Most sophisticated timing triggering can reach ~10ps jitter. This is the best available accuracy for typical laser experiments when driving streak cameras (best resolution is ~20ps). ● Low level that is not requiring any precise timing when pulse duration and pulse rise time are greater than 100ps (typically CCD cameras, Osciloscopes etc.). Levels 2 and 3 are to be discussed, these levels may be realized using Electronic Timing System (ETS)

ELI Facility Timing System E L I – B L – – P R E – B ELI Beamlines – Beam Distribution

ELI Facility Timing System E L I – B L – – P R E – B Facility level timing system architecture

ELI Facility Timing System E L I – B L – – P R E – B Integration to Facility Level Control System Facility level control system is based on these technologies ● Optical network ● Linux OS ● TANGO control system (provides support for Matlab/Simulink, Labview, Python etc.) Facility level Control computer and DAQ system ● High level control and DAQ systems are based on rack mounted servers with PCIe interface ● Local machines may be based on other bus technologies (cPCI(e), PXI(e) or others), these may be used in experimental rooms Synchronization of real time values of control computers and DAQ system ● NTP/PTP support ● Support for “White rabbit” open timing system

ELI Facility Timing System E L I – B L – – P R E – B Integration to Facility Level Control System

ELI Facility Timing System E L I – B L – – P R E – B Functional Requirements ● Signal of timing system must be able to be distributed up to 500m ● The master must be able to drive up to 200 delay generators. ● Expandable up to 2000 adjustable and independent trigger channels ● The timing system must provide sequences: single shot, repetitive shots, single burst, repetitive bursts etc. ● Output adjustable with repetitive frequencies for users: 1Hz, 10Hz, 100Hz, 1kHz, 2kHz, 100kHz ● The communication channel must provide users messages ● The information in the users messages must be able to identify all triggers at the facility level ● The user must be able to read and write user messages ● The timing system must provide PCI express based card which provides read/write access to users messages ● The timing system must be able to provide delay generator cards based on PCIe, cPCI, cPCIe, PXI and PXIe (future) buses for future users requests ● Delay generator cards must be able to read/write user data for local time stamping

E L I – B L – – P R E – B