Partnerships for Assessment Drilling and Development of Geothermal Resources in St. Vincent and the Grenadines Presented by: Melissa A. De Freitas Energy.

Slides:



Advertisements
Similar presentations
Chuck Kutscher National Renewable Energy Laboratory Geothermal Power Potential Energy and Climate Mini-Workshop November 3, 2008.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Geothermal Exploration in Eritrea Ermias Yohannes, Eritrea Ministry of Energy and Mines, Department of Mines Regional Geothermal Working Group Meeting.
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
Commonwealth Utilities Corporation Alan W. Fletcher Executive Director.
STATUS OF GEOTHERMAL EXPLORATION AND PRIVATE SECTOR OPPORTUNITY IN UGANDA DEPARTMENT OF GEOLOGICAL SURVEY AND MINES MINISTRY OF ENERGY AND MINERAL DEVELOPMENT.
Energy Efficiency & Renewable Energyeere.energy.gov Hidda Thorsteinsson Office of Energy Efficiency and Renewable Energy U.S. Department of Energy Hydrothermal.
GEOTHERMAL POTENTIAL OF ST. KITTS AND NEVIS ISLANDS By Gerald W. Huttrer Geothermal Management Company, Inc. For the Eastern Caribbean Geothermal Energy.
Dominica Geothermal Exploration Dr Simon Young Geo-Caraïbes Project Technical Assistance Team.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Adrian Larking, Managing Director 26 November 2007 Green Rock Energy Limited Annual General Meeting.
Renewable Energy in Oman Public Authority for Electricity and Water Khalil Alzidi Senior Renewable Energy Engineer.
Remarks of R.P. Singh CMD, SJVN Limited. Power Scenario in India & Neighboring Countries All India Installed Capacity (As on 30th September, 2014) Sector.
Cost and Supply of Geothermal Power Susan Petty Black Mountain Technology.
Clean, Reliable, and Low Cost Energy for the for theCaribbean December, 2006 Confidential.
The Caribbean Renewable Energy Development Programme, CREDP Roland Clarke, Ph. D. Project Manager, CREDP Tel: thru 9 ext. 2631
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Low Carbon Energy Futures workshop Alison Lax Project Manager – Low Carbon Communities.
Pebble Creek (North Meager Creek)
GEOTHERMAL Renewable resource. Content 1. Geothermal Energy 2. Geothermal Energy utilization 3. Open projects 4. Work flow 5. Cooperation proposal.
Geothermal projects in Iceland
IEE/12/064/SI /02/2015. Municipality of Kecskemét - General economic data  Capital of Bács-Kiskun county  Economic, administrative, educational,
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
Application of decision theory to the procurement of a geothermal power plant April 2nd 2008 Viktor Þórisson.
Geothermal energy GEOTHERMAL ENERGY Fausto Batini Enel – International Rome – Italy Rome, th July.
1 Eastern Caribbean Geothermal Development Project: Institutional and juridical guidelines Denis LEVY GROUPE T I T A N E Member of.
Geothermal Development in the Caribbean and EGS Perspectives ENGINE Launching Conference – Orléans, Feb. 12 th to 15 th, 2006 H. Traineau, B. Herbrich,
Results of the C-SERMS Phase 1 Baseline Report & Suggestions for Moving Forward In partnership with: REETA workshop, Georgetown, Barbados February.
Tecto Energy Pebble Creek Geothermal Project Outline Outline  World Geothermal Power Status  BC Geothermal Prospects  Pebble Creek (North Meager) Prospects.
Mighty River Power’s Geothermal R&D Programme
Technical Conference on Net Metering Load Research Study November 5, 2014.
Geothermal Energy ROSA RUIZ. Geothermal Energy  Geothermal energy is the thermal energy that is generated and stored inside earth.  Heat comes from.
Direct-Heat Geothermal Systems: steps to improve understanding about the source of heat Rick Allis Utah Geological Survey March Workshop.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.

Heat Flow Drilling as a Geothermal Exploration Tool Chris Matthews Technical Manager Australian Geothermal Energy Association Australian Geothermal Energy.
Adaptation to Climate Change Actions in Mongolia Adaptation Workshop IFAD, Rome May 2007.
Geothermal energy. Thermal energy is constantly gene- rated in the Earth interior by the de- cay of radioactive nuclei. The heat content of the Earth.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Geothermal Fields On the Ring of Fire Prospect Developed Fields.
Institute of Volcanology and Seismology FEB RAS
Why a co-ordination action about Enhanced Geothermal Systems ? P. Ledru & A. Genter Engine Launching Conference February 2006 Orléans, France Opening.
GHEOTHERMAL EXPLORATION IN DR CONGO MINISTRY OF RESOURCES HYDRAULICS &ELECTRICITY Mr. KAFINDO RAPHAEL ARGEOC5 Tanzania Arusha) 27 th oct. to2 nd Nov
Geothermal Energy Joanne Smith UK projections February 24 th 2005.
AN OVERVIEW OF THE GEOTHERMAL POTENTIAL OF PAPUA NEW GUINEA
Renewable Energy Strategic Action Plan For American Samoa August 2015.
Yellowhead Area Transmission System Development
Moving Geothermal Sites from Exploration Prospects to Economic Projects Jim Lovekin GeothermEx, Inc. California Geothermal Summit 9 June 2005.
Status of Geothermal Energy Exploration in Fiji National Consultation on Renewable Energy Readiness Assessment NOVOTEL 13 th March, 2014.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Arlene Anderson, Technology Manager Geothermal Technologies Office Introduction and Background Geothermal Direct Use Technology & Marketplace | Canonsburg,
A Summary of Geothermal Development in Vanuatu 12th November 2015
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Geothermal Policy and Regulation Cases from Chile, Kenya, New Zealand and the Philippines November 2015.
Implementing Power Rationing Programs The Tanzania and Uganda Experience Karen Rasmussen (AFTEG)
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Michael Feliks UK Operations Manager Cluff Geothermal.
Erdeneburen HPP Project Implementation Unit
KICK ‘EM JENNY GRENADA’S ACTIVE UNDERSEA VOLCANO Prepared by NEMO Secretariat Saint Lucia With material from the Seismic Research Centre of the University.
Assessment of the Economic Impact of Greening Vehicular Transport in Barbados Winston Moore (PhD) and Stacia Howard Antilles Economics November 2015.
The Karaha-Telaga Bodas Geothermal System, Indonesia
Geothermal Development Facility (GDF) The First Multi-Donor Climate Initiative to Promote Geothermal Energy in Latin America Jens Wirth, Senior Project.
Progress Briefing - Energy Initiative
Rob Conley City of Hamilton
DISTRICT COOLING A promising and sustainable option for HFC phase-down
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
THE INTRODUCTION OF NUCLEAR POWER IN EGYPT AN OVERVIEW
Photovoltaic Systems Engineering Utility Scale Development:
DG ENV C3 Industrial Emissions, Air Quality and Noise 20 January 2012
Presentation transcript:

Partnerships for Assessment Drilling and Development of Geothermal Resources in St. Vincent and the Grenadines Presented by: Melissa A. De Freitas Energy Unit Ministry of National Security, Air and Sea Port Development St. Vincent and the Grenadines

Introduction Population: 109, 373 (2013) Energy Profile: - Installed Capacity: 39 MW - Base Load: 12 MW - Peak Load: 21 MW Approximately 5.6 MW of installed capacity is contributed by hydropower

History of Geothermal Development in St. Vincent & the Grenadines Year Institution Results 1991 Geothermica Italiana Fumaroles appear to be linked to recent volcanic manifestations, rather than to a deep hydrothermal system. It is therefore recommended that no further geothermal exploratory work be made on the island of St. Vincent. 1996 Gerald W. Huttrer Geothermal potential is credible due to recent volcanism displayed by the La Soufriére volcano. Existence of a heat source is evidenced by fumaroles within the crater as well as by hot springs discovered in the Walibou River. GeothermEX Inc. Comprehensive geological and geochemical surveys support the theory that a geothermal resource is present on the Island of St. Vincent. Temperatures may range from 150-175 oC. 1998 Caribbean Power, St. Vincent Ltd. (Dames & Moore) Geochemical sampling confirms a deep reservoir-derived fluid. Resisitivity data (CSAMT) reveal low resistivity areas on the southwest flank of the La Soufriére volcano which support the indications of an active geothermal system. 1999 G.E.A St. Vincent has the potential to support 112 MWe . 2011 GeothermEX supports the previous studies indicating a geothermal resource potential. 2012 NREL NREL is investigating a distributed system utilizing directional well drilling and small modular power generation units 2013 Reykjavík Geothermal & Emera Inc. ON GOING The potential for Geothermal Development is not new to SVG, in fact various developers have being showing interest in St. Vincent for almost 25 years, but for unknown reasons pulled out before any development could have taken place

SVG Geothermal Challenges Risk Details Financial High upfront cost Challenging Terrain Geo-hazards (slope instability, flash floods, seismic events) SVG has a small electric load demand of 21 MW Regulatory No independent regulator Lack of a legal framework Resource/ Exploratory Dry/Unproductive wells Over-sizing of power plant due to over-estimation of recource. In addition to high upfront costs associated with development, SVG’s challenging terrain has been an additional deterrent to investors. The deeply-incised valley-ridge topography poses challenges to field work, rig and equipment mobilization, plant location and electricity T&D. Our physical location, as well as being a volcanically active island has placed us under the risk of natural disasters and other geohazards. Returns on such a large project with a small electric load demand of 21 MW proves to be a very expensive option that may have deterred previous investors. In countries like SVG with limited fiscal resources, this high economic risk and upfront cost generally mean that such projects go undeveloped.

Forming Partnerships The Government of SVG (GoSVG) entered into a Memorandum of Understanding (MOU) in January 2013 with Reykjavík Geothermal (RG) and Emera Caribbean Inc. The signed Letter of Intent (LOI) sets the ownership structure for the proposed Geothermal Company as well as proposes an equity partnership between Emera, RG and GoSVG. Technical support has been given by the Clinton Climate Initiative (CCI), JICA and New Zealand. EC Inc. is a subsidiary of Emera Inc in Nova Scotia. Emera has a regional foothold in Barbados, Dominica, St. Lucia, Bahamas. Additionally, SVGs close proximity to Bbdos may have created additional interest for underwater electrical interconnectivity. RG was founded by a team of geothermal experts and has been responsible for projects in over 30 countries.

Stakeholder Engagement Stakeholder engagement will build broad support for the project and understanding of geothermal energy as well as to manage public expectations Communication will be open and transparent for each phase of the project and as such all stakeholders will receive information via the most appropriate matters.

Technical Results Above: New and old craters of the La Soufriére volcano Below: Fumarole on the dome inside the new crater.

Technical Results Geochemistry: Geochemical analysis of thermal manifestations have indicated the presence of a high enthalpy resource located at the base of the volcano. A conservative estimate of temperature lies in the range of 200 – 300 oC, although it may in fact be higher. Throughout the years, many fluid and gas samples were taken from the hot springs found in the Walibou River and from the fumarole present on the dome inside of the crater. Recent samples taken in 2012 has remained more or less unchanged during the past 20 years.

Technical Results Geophysics: In October 2013, a team from RG assisted by local workers, have carried out geophysical surface explorations on the western and eastern flanks of the volcano. Several Magnetotelluric (MT) and TEM surveys were carried out to determine the exact potential of the geothermal resource and the boundaries of its reservoir. This will assist in to identifying suitable area(s) for drilling and ultimately determine whether the project is feasible. Early indications yielded positive results. However, there are some gaps in the data in areas that were inaccessible by foot. A preliminary resistivity survey was carried out in 1998 by Caribbean Power, SVG Ltd. It revealed low resistivity areas on the southwest flank of the La Soufriére volcano which support the indications of an active geothermal system.

Technical Results In September 2014, additional MT and TEM surveys were conducted mainly on the North-Eastern portion of the island that confirmed the presense of a high enthalpy resource >200 C

Shallow low resistivity layer interpreted as the Clay-Cap layer is mapped under all the survey area. Depth to this layer is most often 300-600 m. High resistivity underlaying the low resistivity CC denotes the upper part of the geothermal reservoir

Results of the Resistivity Survey as well as preliminary structural studies revealed that the prospective well field area be located on the east of the island, hence the focus of the LiDAR survey can be seen in the image.

From the slope analysis and the DTM, the following areas were deemed the best candidates for well location. A team consisted of representatives of RG, Emera, Stantec, VINLEC and the Government visited each site. Potential site locations were narrowed down from eight sites to two.

Next Steps for Development The GoSVG is currently seeking financing to lower the project’s total cost. -ADFD: $15 Mil -JICA -Development Bank Legal Framework - Geothermal Bill will be passed in Parliament in mid 2015 The GoSVG is also actively pursuing grants to lower the overall project cost

Next Steps for Development Environmental and Social Impact Assessment - baseline study completed Community Engagement - Emera/RG have already untaken meetings with residents in the north of SVG. Plans are being prepared for a third round meetings Business Model - will be presented at the end of June 2015.

Next Steps for Development Test Wells - RG/Emera are presently finalizing the assessment of the drill site. -Drill plan and conceptual well design has been prepared -Request for Proposals document is being prepared to issue to suitable qualified drilling contractors. Construction of a 10-15 MW geothermal plant