Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.

Slides:



Advertisements
Similar presentations
Controls Configuration Service Overview GSI Antonio on behalf of the Controls Configuration team Beams Department Controls Group Data & Applications.
Advertisements

Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
 M.A - BIS Workshop – 4th of February 2015 BIS software layers at CERN Maxime Audrain BIS workshop for CERN and ESS, 3-4 of February 2015 On behalf of.
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
ToPOTools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April –
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
controls Middleware – OVERVIEW & architecture 26th June 2013
130 October 2009 PIC - WIC - LHC_CIRCUIT UNICOS PVSS.
Industrial Control Engineering UNICOS-PVSS evolution Hervé Milcent EN/ICE/SCD 07/10/
CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA UNICOS: UN IFIED I NDUSTRIAL CO NTROL S YSTEM CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA 1 Marco Boccioli -
Industrial Control Engineering PXI software support and accelerator integration.
Pierre Charrue – BE/CO.  Preamble  The LHC Controls Infrastructure  External Dependencies  Redundancies  Control Room Power Loss  Conclusion 6 March.
Novel techniques while developing on the WinCC OA Experience with the UCPC library.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
FAIR Accelerator Controls Strategy
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Industrial Control Engineering UNICOS device and front-end Hervé Milcent UNICOS device front-endHervé Milcent1.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
Prepared by: Zorin Evgeny Today, everybody wants a dashboard. Like many newcomers to the technology scene, dashboards are sexy. Stephen Few, Information.
Industrial Control Activities Forecast Philippe Gayet on behalf of EN-ICE.
PVSS: Windows  Linux. 13th May Outline Current software architecture PVSS on Linux Demo What has to be redone for Linux console Vacuum, GCS, cryogenics.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
UNICOS Roadmap 2015 Enrique Blanco On behalf of the UNICOS team EN-ICE 1 March 2015 CERN March 27, 2015 GSI - CERN Collaboration.
60kW Thermosiphon control system
Industrial Control Engineering Infrastructure: EN/ICE needs Wrap up Mandate: WG Infrastructure to establish the needs for an ICE server pool and study.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
European Organization for Nuclear Research Industrial Controls Group Workshop on QPS Software Layer, 26/08/15
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
UNICOS F RAMEWORK Enrique BLANCO* Industrial Controls & Electronics Group Engineering Department, CERN Geneva, Switzerland * On behalf of the UNICOS team.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
The MA section of AB/CO FirstEvent Welcome ! RADE Information Event Adriaan Rijllart (AB/CO) 2 Outline 10:00 The context 10:15 Introduction to RADE 10:35.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Industrial Control Engineering ADE Rapid Application Development Environment.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
ToPO Tools for PS Operation
Introduction to RBAC Wojciech Sliwinski BE/CO for the CMW/RBAC team
CV PVSS project architecture
ICE Monitoring – status 10 February 2010
The Control System For LHC Hardware Commissioning
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Presentation transcript:

Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop 2011

Industrial Control Engineering  Involvement in injectors  PVSS based application and its integration  POPS  Vacuum Isolde  WIC PS/SPS  CIS  RADE based application and its integration  PS beam spectrum analyzer  Linac 4 emittance scanner  Future projects  Support  Summary IEFC workshop 20112Hervé Milcent Outline

Industrial Control Engineering IEFC workshop 20113Hervé Milcent POPS: architecture Ethernet (TN) Private Ethernet POPS SCADA Data Server FESA FGC CONVERTEAM TE/EPC EN/ICETE/EPC CMW CMW

Industrial Control Engineering  Use of UNICOS framework with custom development  E.g.: Event list  EN/ICE:  Widget, device development  Deployment  Correct functioning of the PVSS infrastructure  Interface to knob/working set  TE/EPC:  View drawing IEFC workshop 20114Hervé Milcent POPS supervision POPS SCADA Data Server CONVERTEAM

Industrial Control Engineering  Re-engineering: by TE/VSC, EN/ICE:  functional analysis and specifications  Continuous Process Control UNICOS application  EN/ICE:  Turn key for the first implementation  Coaching TE/VSC  Transferred to TE/VSC  EN/ICE:  Correct functioning of the PVSS infrastructure IEFC workshop 20115Hervé Milcent Vacuum Isolde Ethernet (TN) SCADA Data Server

Industrial Control Engineering  Re-use of WIC LHC software  EN/ICE:  Standard and safety Siemens PLC: programming, bug fixing, update, etc.  PVSS: turn key application  deployment, device, monitoring  Correct functioning of the PVSS infrastructure  TE/MI:  Cabling  Hardware deployment in situ  PS complex:  Linac 3, LEIR  SPS complex:  TI2, TI8, TT40, TT60  HiRadMat (03/2011) IEFC workshop 20116Hervé Milcent Warm Interlock Controller (WIC) PS complex/SPS complex Ethernet (TN) SCADA Data Server

Industrial Control Engineering  EN/ICE:  Reverse engineering of supervision based on HP/UX and PLC adaptation  Monitoring, backup of HP/UX supervision  Next Christmas technical stop: replacement IEFC workshop 20117Hervé Milcent Control Interlock System (CIS) Ethernet (TN) CIS SCADA Data Server CIS HP/UX Supervision

Industrial Control Engineering  Expert applications, operational applications IEFC workshop 20118Hervé Milcent UNICOS: integration within the accelerator complex LHC Logging LASER/DIAMON Application A UNICORE UNICOS CPC package (Vacuum, …) PLCs CPC PLCs (non CPC) Application packages (WIC,..) Application packages (POPS,..) Control layer UNICOSUNICOS Supervision layer DIP DIM CMW (Full interface) RBAC Post-Mortem (Linux only)

Industrial Control Engineering IEFC workshop 20119Hervé Milcent PS beam spectrum analyzer Analog input (1 GHz) LabVIEW-RTLabVIEW Prévessin PXI EN/ICEBE/OP EN/ICE Ethernet (TN)  EN/ICE:  Correct functioning of the application

Industrial Control Engineering IEFC workshop Hervé Milcent Linac 4 Emittance scanner LabVIEW + RADE EN/ICE BE/BI Ethernet (TN)

Industrial Control Engineering  MD applications, expert application, prototyping IEFC workshop Hervé Milcent RADE: integration within the accelerator complex Defined GUI Application templates Configuration files Documentation SDDS PM files JAPC LabVIEW CMW PLC Modbus/S7 PXI LASER DIP DIM LHCLogging Layout DB LSA DB

Industrial Control Engineering  Applications  All CV applications in the injectors: new systems and renovations (e.g. RFQ cooling)  Use of UNICOS CPC: PVSS and PLC (Siemens & Schneider)  WIC for HIE ISOLDE, Booster  POPS post mortem  Dashboard ……  Support to the injectors projects  Vacuum  Cryo Instrumentation Expert Tool (HIE ISOLDE)  Cryogenics (HIE ISOLDE) …… IEFC workshop Hervé Milcent Future Projects

Industrial Control Engineering  List of equipment established with CERN PLC user community  Spare part PLC(Siemens and Schneider):  Critical spare equipment handled by EN/ICE  Fast delivery for replacement of equipment in critical stock  If missing equipment, contact EN/ICE  Will be extended to PXI (Q3 2011) IEFC workshop Hervé Milcent Support: Spare parts

Industrial Control Engineering  Depends on the project responsibilities  EN/ICE: control infrastructure, e.g. link with the PLC, CMW interface.  Expert/equipment group: controlled process, e.g. interlock problem.  Request via the application expert or equipment group  EN/ICE: Monitoring of control infrastructure of the application  In order to anticipate the problems  3 times a day  With an extended diagnostic tool, complementary to DIAMON  EN/ICE rely on BE/CO for servers, front-end and console IEFC workshop Hervé Milcent Support: Applications

Industrial Control Engineering  EN/ICE standby service:  Outside working hours on call  Control infrastructure of the PVSS based Applications (not the controlled process)  PS beam spectrum analyzer  Post Mortem SDDS software  Spare parts PLC & PXI  EN/ICE application expert on best effort during working hours  PVSS based Applications infrastructure (interfaces, etc.)  RADE based application IEFC workshop Hervé Milcent Support: Whom to contact

Industrial Control Engineering  Industrial systems are already deployed and used in the injectors.  ICE involvement according to the needs  Use standard CERN accelerator hardware and software frameworks.  EN-ICE is providing a Standby Service, to cope with hardware and software failures. IEFC workshop Hervé Milcent Summary

Industrial Control Engineering Questions? IEFC workshop Hervé Milcent