Performance Based Maintenance Objectives, Strategies & Processes December 1998.

Slides:



Advertisements
Similar presentations
Analysis of NZ electricity company sale prices in relation to ODV Prepared by Utility Consultants August 1999.
Advertisements

Maintenance Planning and Control : Modeling and Analysis
Total Productive Maintenance
MAINTENANCE MANAGEMENT Module 9
StormingForce.com Motion. StormingForce.com StormingForce’s technology is significantly increasing productivity and quality of manual repetitive tasks.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
Asset Management Planning Objectives, Issues & Processes December 1998.
Assignment Nine Actuarial Operations.
Powerpoint Templates Page 1 Powerpoint Templates Page 2 Something you own that has value There can be assets that gain value over time…. What is an Asset?
Service Design – Section 4.5 Service Continuity Management.
Lesson 5 Computer-Related Issues
© ABB Group May 15, 2015 | Slide 1 The MotorAdvantage – how to save UK industry Steve Ruddell, Division Manager, Discrete Automation and Motion, ABB Ltd.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
All activities involved in keeping a system’s equipments working are the part of maintenances management. Maintenance of machine involves the efforts.
CHAPTER 1. MAINTENANCE “Act of causing to continue ” [New Oxford Dictionary]
Chapter 7: Managing Risk
NGEC - SFTF Structure and Finance Task Force Eric Curtit, MODOT Section 6 Project Update.
FLAIR ENGINEERING Ltd.. Learning Objectives  Understand how real life organizations develop and implement strategy  Show how staff can be motivated.
Introduction and Course overview by S. O. Duffuaa.
Non-functional requirements
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Computerised Maintenance Management Systems
W504 - Management of asbestos containing materials.
Software Dependability CIS 376 Bruce R. Maxim UM-Dearborn.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Utility Risk Management Definitions, Objectives & Processes January 1999.
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
MAINTENANCE STANDARDS & PLANNING
Maximising Investment Opportunities: releasing value from estates Barclays Private Equity 15 th May 2008.
Information management Issues & trends January 1999.
Case 6.3 WorldCom Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Constant Crushing Programme. The Programme The Benefits The Options The Figures.
How Aircraft Operators Can Benefit from PHM Techniques Big Sky - Montana 2012 IEEE Aerospace Conference Leonardo Ramos Rodrigues EMBRAER S.A., São José.
The Water Industry In England & Wales Structure, issues & strategies January 1999.
Presentation on Preventive Maintenance
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Risk management (lecture). D efinitions of risk General: standard deviation Finance: volatility of return and costs Risk in project management (Lockyer.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
Unit 4 Accounting and Finance GCE A2 Business Studies.
Jonathan McCoy Regional Property Underwriting Manager Zurich Energy Supply chain insurance and risk assessment Protecting profitability.
Maintenance McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Information Security 14 October 2005 IT Security Unit Ministry of IT & Telecommunications.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introducing Project Management Update December 2011.
The Gas Industry In New Zealand Structure, issues & strategies May 2000.
The Risk Management Process
Maintenance Strategies
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Auditing Internal Control over Financial Reporting Chapter Seven.
Computerised Maintenance Management Systems
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
Modern Maintenance. Management
TPCM Supporting World Class Standards Supporting World Class Mining Standards Driving Efficiencies in the Pilbara.
Financial Accounting 1 Lecture – 21 Recap Up to now we have covered following areas in this course We started off with the basic concepts of accounting,
Chapter 6 Personal Risk Management. Slide 2 What Is Risk? 6-1 Risk Assessment and Strategies Risk is the chance of injury, damage, or economic loss. Probability.

Maintenance strategies
Fixed Assets and Intangible Assets
MAINTENANCE ENGINEERING
Risk management - HIRAC awareness presentation
Total Productive Maintenance and Quick Changeover
Bluetooth Based Smart Sensor Network
Lesson 5 Computer-Related Issues
TPM Definitions Goals and Benefits Components GEOP 4316.
Risk management.
Unit I Module 3 - RCM Terminology and Concepts
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Risk management.
Operations Management
Presentation transcript:

Performance Based Maintenance Objectives, Strategies & Processes December 1998

This presentation is confidential to the intended recipient and may not be divulged to any other parties without the explicit written permission of Utility Consultants.

This presentation is for promotional purposes only. Utility Consultants accepts no liability for any action or inaction arising from its’ use.

This presentation is copyright, and may not be reproduced in whole or in part without explicit written authority from Utility Consultants Ltd.

What is maintenance ? Work that restores an assets’ lost capacity for production, or work done with a view to preventing loss of production capacity (preventive maintenance). Loss of capacity may occur due to wear, rust, rot or a wide variety of other physical and chemical processes.

What is maintenance ? Loss of capacity may occur independently of operation eg. rust.

What is an asset ? An asset is a physical object that is made up of components that must interact to achieve an objective. Components may have specific tasks eg. provide electrical insulation, transmit rotary motion, contain pressure etc.

What is an asset ? These components will need to be maintained to replace the loss of ability to perform their specific tasks eg. insulating oil needs to be filtered to restore any loss of insulation.

Why perform maintenance ? Helps prevent an asset breaking down, which usually interrupts production. Helps extend the life of the asset, meaning that purchasing a new asset can be deferred.

When should maintenance be performed ? Ideally, just before the assets’ performance drops below a minimum required performance level (this level may include “break down”).

When should maintenance be performed ? Most maintenance is based on implying a components ability to continue performing from an easily observable parameter such as breakdown, calendar hours, running hours, number of starts etc. This has given rise to a wide variety of maintenance strategies.

Maintenance strategies Breakdown. Time based. Fixed interval. Combination. Condition based. Design out. Opportunity based.

Breakdown maintenance Occurs when a component breaks and the asset ceases to function. Need to perform maintenance is obvious. Scheduling work may be difficult depending on when breakdown occurs.

Breakdown maintenance Scope of work may include repair of associated catastrophic damage. Probably will involve an unplanned asset outage.

Time based maintenance Performed at fixed calendar intervals. Implies component condition from elapsed calendar time. Scheduling work is simple. Scope of work involves rejuvenating or replacing components.

Time based maintenance Breakdown may still occur between maintenance intervals. May result in assets being “over- maintained”.

Fixed interval maintenance Performed after a fixed number of events eg. trips, starts, running hours. Implies component condition from elapsed events. Scheduling work becomes more difficult.

Fixed interval maintenance Scope of work involves rejuvenating or replacing components. Breakdown may still occur between maintenance intervals. Less likely to result in assets being “over-maintained” than time based maintenance.

Combination maintenance Performed on a combined time and fixed interval basis eg. annually or after 500 trips. Implies component condition from a combination of elapsed calendar time and events. Scheduling work becomes more difficult.

Combination maintenance Scope of work involves rejuvenating or replacing components. Breakdown may still occur between maintenance intervals. May result in assets being “over- maintained” because of time based driver.

Condition based maintenance Performed when component conditions reach a predefined trigger level rather than implying component condition from elapsed time or events. Assessing component condition adds an extra layer of work to the process. Scheduling work can be difficult.

Condition based maintenance Scope of work involves rejuvenating or replacing components. Breakdown unlikely to occur between maintenance intervals. Less likely to result in assets being “over-maintained” due to condition assessment preceding maintenance.

Design out maintenance Eliminates maintenance by replacing components with different components that require less maintenance. Scope of work involves design, specification, purchase and installation. May involve lengthy asset outages.

Design out maintenance Likely to be run as a capital project rather than a maintenance exercise. May involve a rigorous cost-benefit analysis before approval is given. Will significantly alter future maintenance requirements.

Opportunity based maintenance Maintenance that can be performed during an unplanned outage eg. car hitting a pole requires a section of 11 kV line to be isolated. Work such as replacing insulators can be piggy- backed into this unplanned outage. Usually restricted to minor maintenance or defect repairs.

Opportunity based maintenance Requires all opportunity based work to be readily identifiable when an unplanned outage occurs. Requires resources to be available at short notice. Overall philosophy is “buying” higher system availability by avoiding planned outages.

The costs of maintenance Cost of actually doing the work. Value of lost production or customer good will if outages are required. Value of component life discarded if maintenance is performed too soon.

The benefits of maintenance Minimises unplanned lost production or loss of customer good will. Helps prevent catastrophic failure. Allows work to be performed under planned, controlled circumstances. Assists in preserving future earnings for asset owners.

Performance based maintenance Objective is to not only perform maintenance based on the condition of components, but to consider the performance requirements of the asset in deciding when and how to maintain.

Case study - wooden poles A hard-wood pole in a 110 kV line would be inspected and maintained differently to the same pole in a remote rural 11 kV line. Even though both poles are physically identical and subject to the same degradation processes, the pole in the 110 kV line is obviously more critical to the owners business.

Case study - transformer oil Oil in a 350 MVA generator transformer would be DGA tested monthly because its performance is critical to the owners business. The same oil in a 10 kVA distribution transformer would be replaced every 12 to 15 years without any inspection when the transformer is bought in for an overhaul.

Performance based maintenance Key processes are: Developing a comprehensive component register. Defining each components’ objectives, its performance requirements and it’s the relevant mode of performance degradation. Defining suitable tests and inspections for assessing component condition. Performing the inspections and tests.

Performance based maintenance Comparing the actual condition to the trigger level at which maintenance must be performed. Performing the maintenance if required. Recording the results of inspections and tests, and the scope of work performed. Modify the inspection and test requirements as required. Repeating the cycle.

Developing the component register Augment the asset register to the level of individual asset components. Identify each components’ objective eg. provide electrical insulation between live components and the metal case. Identify the relevant mode of performance degradation eg. loss of dielectric strength due to oxidation.

Developing the component register Identify the components’ performance requirements eg. minimum dielectric strength of 55 kV/cm. Identify a suitable trigger level at which maintenance will be performed eg. 60 kV/cm for a an 11.5 MVA transformer, but 70 kV/cm for a 350 MVA generator transformer.

Setting the trigger level Depends on the criticality of the asset and the consequences of getting it wrong eg. the oil dielectric strength in a 350 MVA generator transformer is more critical than in a 10 kVA distribution transformer in a remote rural area, and merits a higher trigger level to avoid failure.

Setting the trigger level Super-critical applications such as military and aviation may permit the discarding of unconsumed life in order to stay well above the trigger levels. This may be done on a time or fixed interval basis.

Defining suitable tests & inspections Requires measurement of the relevant mode of performance degradation. Requires the frequency of measurement to be defined.

Comparing actual performance with trigger levels Requires comparison of the actual component performance with the predefined trigger level eg. the dielectric strength of the latest oil sample is 72 kV/cm, which is much greater than the 60 kV/cm trigger level for an 11.5 MVA transformer.

Performing maintenance Requires the defined scope of work to be performed, and the asset to be confirmed as suitable for return to service. Requires information to be recorded, such as scope of work performed, any defects noted, modifications made etc.

Changing the culture Like any organisational change, changing maintenance strategies requires a thorough change management process. May well be entrenched attitudes that will covertly resist any change in strategy, particularly any that reduce overtime payments.

Is it the best strategy ? May not always be the best strategy because of the expense of assessing component condition. Requires the criticality of the asset and the consequences of breakdown to be quantified. Perform cost-benefit analysis.

Maintenance strategy selection If criticality is very low, use Breakdown. If criticality is medium, and cost of condition inspections is low, use Performance Based. If criticality is medium, and cost of condition inspection is high, use Time, Fixed Interval or Combination.

Maintenance strategy selection If criticality is high, and cost of condition inspection is low, use Performance Based. If criticality is high, and cost of condition inspection is high, use Design Out. If work scope is minor and criticality is low, use Opportunity Based.

Life cycle planning Important that the chosen maintenance strategy integrates into the overall life cycle plan. Most asset owners have a capital development plan that considers changing asset requirements over time, whereas the maintenance plan may only consider maintaining status quo performance.

Life cycle planning Important that the maintenance plan (regardless of which strategy is chosen) reflects the requirements of the capital development plan eg. a transformer that will removed and scrapped in the 2007/08 financial year should not be given a full overhaul in 2005/06 (filtering the oil and minor testing should suffice).

Conclusions Maintenance strategies must be justified on a cost-benefit basis. Performance based maintenance may always not be the best strategy. Consideration must be given to the possibility of catastrophic failure and the loss of customer service in the event of breakdown.

Conclusions Maintenance plans must reflect the requirements of the capital development plan.

For more information…. Visit Utility Consultants Web Site with a specific question Subscribe to our free newsletter