EVALUATION & RESEARCH IN WAKE COUNTY (NC) PUBLIC SCHOOLS Presented by David Holdzkom, Assistant Superintendent, Evaulation & Research Wake County Public.

Slides:



Advertisements
Similar presentations
[Imagine School at North Port] Oral Exit Report Quality Assurance Review Team School Accreditation.
Advertisements

Measuring Student and Teacher Technology Literacy for NCLB Whats an LEA to do? 2004 National School Boards Association Conference Denver Carol D. Mosley.
Welcome!. Guiding Questions “Alberta Education has set the direction – each district must now set the course…..” (Special Education Conference, 2010)
North Carolina Educator Evaluation System. Future-Ready Students For the 21st Century The guiding mission of the North Carolina State Board of Education.
Arts in Basic Curriculum 20-Year Anniversary Evaluation the Improve Group.
World’s Largest Educational Community
Sub-heading ADMINISTRATOR EVALUATION AND SUPPORT SYSTEM Curriculum, Instruction and Assessment Leader Proposed Adaptations.
CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction Program Improvement Year 3 Corrective Action.
Analysis of Data at South Paulding High School from 2008 to 2010 Kim Huett, Anne Roycroft, Gina Smeeton, and Robin Wofford.
Commitment to Community Presented By: Susan K. Hintz, Interim Superintendent Osseo Area Schools - District #279.
The 10 Components of a Schoolwide Title I Program Presented by: Dr. Denise Ellis Director State and Federal Programs Dr. Ken Wagner Principal Rancho Mirage.
Title I Schoolwide Providing the Tools for Change Presented by Education Service Center Region XI February 2008.
Interstate New Teacher Assessment and Support Consortium (INTASC)
Delta Sierra Middle School Napa/Solano County Office of Education School Assistance and Intervention Team Monitoring Report #8 – July 2008 Mary Camezon,
1 Program Improvement Update Foundations for writing the LEA Addendum.
Implementation of the North Carolina Read to Achieve Program May 7, 2013.
DISTRICT IMPROVEMENT PLAN Student Achievement Annual Progress Report Lakewood School District # 306.
Rutland High School Technical Review Visit Looking At Results Planning Next Steps Learning About Resources.
Summit County’s Changing Demographics Hispanic Population3262,4064,207 Total County Population15,51829,73636,100 Hispanics as percent of.
Bibb County Schools Standard 1: Vision and Purpose Standard: The system establishes and communicates a shared purpose and direction for improving.
DISTRICT IMPROVEMENT PLAN Student Achievement Annual Progress Report Lakewood School District # 306.
Tallmadge High School TALLMADGE CITY SCHOOL DISTRICT CONTINUOUS IMPROVEMENT PLAN Initial Plan: February 1999 Revised: May 2003 Revised: September 30, 2004.
Educator Preparation, Retention, and Effectiveness Ed Fuller University Council for Educational Administration and The University of Texas at Austin February.
1 Executive Limitation 12: Curriculum and Instruction Darlene Westbrook Chief Academic Officer Denise Collier Executive Director for Curriculum Monitoring.
Montgomery County Public Schools, Maryland Middle School Reform in Montgomery County Public Schools Linda Ferrell Director Director Middle School Instruction.
PAULDING COUNTY SCHOOL DISTRICT AdvancED EXTERNAL REVIEW REPORT.
Evaluating a Literacy Curriculum for Adolescents: Results from Three Sites of the First Year of Striving Readers Eastern Evaluation Research Society Conference.
Florida’s Implementation of NCLB John L. Winn Deputy Commissioner Florida Department of Education.
Targeted Assistance Programs: Requirements and Implementation Spring Title I Statewide Conference May 15, 2014.
THE DRAGON CONNECTION March Who are we?  Jefferson City Schools  Small, rural school district 60 miles north of Atlanta, 18 miles north of the.
Implementation of the North Carolina Read to Achieve Program CCSA March 25, 2013.
Marshall Public Schools World’s Best Workforce September 2014.
Contra Costa County Office of Education Court & Community Schools Stakeholder Meetings Local Control Funding Formula (LCFF) Local Control Accountability.
Comprehensive Educator Effectiveness: New Guidance and Models Presentation for the Special Education Advisory Committee Virginia Department of Education.
Comprehensive Educator Effectiveness: New Guidance and Models Presentation for the Virginia Association of School Superintendents Annual Conference Patty.
CommendationsRecommendations Curriculum The Lakeside Middle School teachers demonstrate a strong desire and commitment to plan collaboratively and develop.
Title I and Families. Purpose of Meeting According to the No Child Left Behind Act of 2001, schools are required to host an Annual Meeting to explain.
Title I and Families. Purpose of Meeting According to the No Child Left Behind Act of 2001, schools are required to host an Annual Meeting to explain.
1 August 22, 2008 Jay Doolan, Ed.D, Assistant Commissioner Division of Educational Standards and Programs SURVEY RESULTS OF THE HIGHLY QUALIFIED.
Milwaukee Mathematics Partnership External Evaluation Schools and School Leadership Report by Tanya Suarez, Suarez & Associates June 9, 2005.
No Child Left Behind Tecumseh Local Schools. No Child Left Behind OR... 4 No Educator Left Unconfused 4 No Lawyer Left Unemployed 4 No Child Left Untested.
Title I and Families. Purpose of Meeting According to the No Child Left Behind Act of 2001, schools are required to host an Annual Meeting to explain.
ACADEMIC PERFORMANCE INDEX (API) ADEQUATE YEARLY PROGRESS (AYP) PROGRAM IMPROVEMENT (PI) SEPTEMBER 18, 2014 Accountability Progress Reporting Update.
BOCES Data Collection & Reporting October 10, 2013 Lisa Pullaro Mid-Hudson Regional Information Center.
DEVELOPING AN EVALUATION SYSTEM BOB ALGOZZINE AND STEVE GOODMAN National PBIS Leadership Forum Hyatt Regency O’Hare Rosemont, Illinois October 14, 2010.
No Child Left Behind. HISTORY President Lyndon B. Johnson signs Elementary and Secondary Education Act, 1965 Title I and ESEA coordinated through Improving.
Rochester Area Math Science Partnership Our Mission: To support high student achievement through world class standards in math and science Continuous.
Title I Faculty Presentation Faculty Title I and AYP Combined Presentation.
Mid-Year Formative Updates of the District CSIP and 5 SIPs Presented by Dr. Timothy M. McInnis, and the Administrative Team of Building Level Principals.
Oakboro Elementary School School Improvement Plan Mrs. Julie H. McSwain, Principal Mrs. Jennifer I. Huneycutt, SIT Chair.
The School Counseling Program
OEPA West Virginia Board of Education Policy 2320: A Process for Improving Education: Performance- Based Accreditation System RESA 6 – October, 2014 Office.
Focus on Professional Learning Communities State Personnel Development Grant D. Ahrens 5/10/2013.
Title I and Families. Purpose of Meeting According to the No Child Left Behind Act of 2001, schools are required to host an Annual Meeting to explain.
BUILDING THE MOSAIC OF DIVISION LEADERSHIP FOR VTSS September 25, 2012 Ebbie Linaburg Assistant Supt. Shenandoah County Public Schools.
Quality Assurance Review Team Oral Exit Report School Accreditation Sugar Grove Elementary September 29, 2010.
Three ‘R’s for Evaluating the Memphis Striving Readers Project: Relationships, Real-World Challenges, and RCT Design Jill Feldman, RBS Director of Evaluation.
Effectiveness of Selected Supplemental Reading Comprehension Interventions: Impacts on a First Cohort of Fifth-Grade Students June 8, 2009 IES Annual Research.
School Counselor Evaluation RubricEvaluating with Fidelity Linda Brannan, M.Ed, NBCT K-12 Student Support Services Consultant NC Department of Public Instruction.
Strategic Plan 2017 How will you contribute to our success?
Indicator 5.4 Create and implement a documented continuous improvement process that describes the gathering, analysis, and use of student achievement.
Discussion of W-APT, ACCESS Testing, Adequate Yearly Progress and Annual Measurable Achievement Objectives.
Instructional Leadership and Application of the Standards Aligned System Act 45 Program Requirements and ITQ Content Review October 14, 2010.
Northwest ISD Vision Statement: The best and most sought-after school district where every student is future ready:  Ready for college  Ready for the.
ACS WASC/CDE Visiting Committee Final Presentation Panorama High School March
Effective Professional Learning Communities (PLC) Where do we begin at Myers Middle School? (Adapted from Professional Learning Communities at Work Robert.
Tell Survey May 12, To encourage large response rates, the Kentucky Education Association, Kentucky Association of School Administrators, Kentucky.
Note: In 2009, this survey replaced the NCA/Baldrige Quality Standards Assessment that was administered from Also, 2010 was the first time.
Outcomes By the end of our sessions, participants will have…  an understanding of how VAL-ED is used as a data point in developing professional development.
RTI & SRBI What Are They and How Can We Use Them?
Presentation transcript:

EVALUATION & RESEARCH IN WAKE COUNTY (NC) PUBLIC SCHOOLS Presented by David Holdzkom, Assistant Superintendent, Evaulation & Research Wake County Public Schools

CONTEXT WCPSS serves about 134,000 students, making it the 19 th largest district in the U.S. and the largest district in North Carolina The district has 93 elementary schools, 28 middle schools, 22 high schools and 4 special schools. About 30% of students qualify for FR; 14% are SWD; and 7.4% are LEP.

CONTEXT (cont’d) Wake County includes 12 incorporated towns plus suburbs and rural communities. Since 1990, the county population has increased by 92%. Much of this in-migration has been from areas of the country that have different traditions of school district organization. Major employers in the county include IBM, GlaxoSmithKline, SAS, and Cisco 3 research universities within 25 miles

ORGANIZATION OF EVAL&RES DEPARTMENT Admin: Assistant Superintendent and 3.5 support staff; Testing: Sr. Director and 2 professionals plus 4 support staff; School Accountability: Sr. Director and 5 professionals plus 2 support staff; Program Accountability: Sr. Director and 4 professionals plus 3 support staff; Grants Admin: Sr. Director plus 2 support staff.

STUDENT INFORMATION RESOURCES NC WISE: A comprehensive data base designed by state to provide information (demographic, achievement data) for every student. Student Information Files: Maintained by WCPSS on a mainframe to provide supplementary data for every student. Testing files: Designed by the state to provide both achievement and growth data for all students in Grades 3-8 plus selected high school course takers. Local test files: Designed by WCPSS adds achievement data for students in K-2 as well as some additional information for students in Grades 3-5.

THE EFFECTIVENESS INDEX Designed in WCPSS E&R, this analysis tool results from regression analyses for individual students that control for FR, concentration of FR in school, special education status, special education service method, etc. Provided for each student, with reports aggregated at the class/course and school levels.

KINDS OF RESEARCH Policy Evaluation: Healthy Schools, Magnet Schools, Student Assignment Program Evaluation: Implementation of PBS, AVID, Standards-based grading, IRIS, etc. School Status Evaluation: Accountability measures of state and NCLB. Knowledge Creation: Effectiveness Studies; IRIS

Program Evaluation Standards Utility Standards: Study serves the info needs of the audience. Feasibility Standards: Study is realistic, diplomatic, and economical. Propriety Standards: Study is legal and ethical. Accuracy Standards: Study reveals and conveys technically adequate info.

POLICY EVALUATION Healthy Schools: Values for 100 variables (both input and outcome) are calculated annually. This information is used by the Leadership Team to ensure that schools remain “healthy”. Magnet Schools: Measure the degree to which Board goals for these schools are met. Student Assignment: How well do different schools serve sub-groups of students?

Magnet Program Review (2007) Review examined degree that board’s goals for magnets were realized: 1. Utilization of schools; 2. Use of choice to promote diverse student populations, reduce concentration of poverty; 3. Expand educational opportunity; 4. Promote program innovations.

Magnet Review (cont’d) Examined student assignment data and student demographic for indications of race, FRL-status, assignment to schools. Compared all schools with respect to concentration of FRL Conducted focus group interview/survey of principals to identify innovative programs. Examined differences of achievement between magnet/base populations, compared to district.

PROGRAM EVALUATION Schools seek to implement nationally- developed programs (PBS, AVID, Reading Recovery) to meet specific needs. Evaluation focuses on fidelity of implementation as well as change in student outcomes. Locally developed programs (Standards- based grading, PES, etc.) try to focus more on logic modeling and outcomes.

Evaluation of SES A Title I school in year 2 of school improvement was required to offer Supplemental Education Services. 252 students were provided tutoring service at a cost of $303,000. Interviews were conducted with teachers and parents; student achievement data were examined.

SCHOOL STATUS EVALUATION Accountability measures of state and NCLB. Calculation of absolute measures of achievement (i.e., percentage of students at/above grade level) and calculation of growth. Calculation of student residuals/effectiveness index.

Knowledge Creation Effectiveness Studies: Using Effectiveness index to identify higher/lower performing teachers of 5 high school subjects, studied classroom practice; this method was adapted for elementary & middle schools IRIS: An experimental program designed to provide reading intervention early. Professional Learning Communities: Surveys intended to measure the quality/degree of implementation of PLCs in all schools.

Project IRIS As part of an OCR consent decree, WCPSS agreed to analyze process of referrals to special education services and to design data- driven interventions to improve reading instruction. Intensive Reading Intervention Study (IRIS) was developed to respond The logic: too many poor readers are referred to student support teams and ultimately to special education. If we can improve reading early, referrals will decrease.

Project IRIS (cont’d) IRIS involved random assignment of 169 students to Control or Treatment groups. Treatment lasted for 45 minutes 4 times a week for ten weeks. Students were tested on a variety of measures before treatment, after treatment and end of year. Controls had “mirror” assessments.

Project IRIS (cont’d) At the end of the study, treatment group had more positive outcomes, but these did not reach statistical significance. Three years later, students from both groups were identified and achievement data analyzed. Again, no significant differences were found.

RANDOMIZED TRIALS Only 1 study (IRIS) has used randomization. Teachers, principals, parents object to randomization: “students aren’t guinea pigs”. How does intervention support/detract from the core mission of the school? Currently pursuing a randomized trial project with Duke University related to PLCs.

FUTURE DIRECTIONS/ISSUES Designing training in data use for principals & teachers and experimenting with delivery methods/formats Increased emphasis on logic models and fidelity of implementation Assisting schools to design accountability schemes that include but are not limited to test scores

FUTURE DIRECTIONS (CONT’D) Enhancing teachers’ ability to develop formative assessment plans/items Implementing the evaluation recommendations of the Curriculum Management Audit conducted in 2007