Jonathan E. Aberts Spring 2009

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Structural System Overview
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
BWI Hilton Hotel Thomas Sabol The Pennsylvania State University
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
H OTEL | N ORTHEAST U.S. J ORDAN R UTHERFORD | S TRUCTURAL O PTION F ACULTY A DVISOR | D R. T HOMAS B OOTHBY AE S ENIOR T HESIS | A PRIL 8, 2013.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
N EW Y ORK, N EW Y ORK 100 Eleventh Avenue © Tyler E. Graybill | Structural Option AE Senior Thesis Presentation | April 12, 2010 Faculty.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Student Health Center Jacob Brambley - AE (structural option)
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Agricultural Hall and Annex Easting Lansing, MI
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Jonathan E. Aberts Spring 2009 Architectural Engineering: Structural Option Thesis Presentation Best Buy Main Corporate Campus: Building D Richfield, MN Jonathan E. Aberts Spring 2009

Presentation Outline Introduction Building description Existing structural conditions Project Proposal Building Redesign Columns PT floor system Lateral system Foundation Cost Comparison Architectural Comparison Conclusions 4/19/2017

Introduction Building Name: Best Buy Main Corporate Building Location: Richfield, MN Function: Office building Occupants: Best Buy corporate employees Architects: Perkins & Will (www.perkinswill.com) Minneapolis, MN Engineers: Opus Northwest (www.opuscorp.com) Minnetonka, MN CM: Opus Northwest Chris Johnson 4/19/2017

Introduction 4/19/2017

Building Description Architecture Precast curtain wall Ribbon windows Curtain wall consists of 6” architectural precast panels tied into the steel structure Prefinished aluminum closure panel holds the ribbon of windows on each floor 4/19/2017

Structural System Floor System Composite beam framing system 6¼” slab, 3” 20 gauge deck and 3¼” lightweight concrete Spray on fireproofing 4/19/2017

Structural System 4/19/2017

Structural System Lateral System Braced frame consist of 3 - W14 columns spliced together at the 3rd and 5th floors Heavier beams, W16x57 4/19/2017

Project Proposal Proposed Solution: Redesign Best Buy Corporate Building D as a full concrete system Floor system will be redesigned post-tensioned slab with beams Columns will also be redesigned into concrete Lateral bracing system will be shear walls Goal is to allow for a larger bay size in the short direction of the building Cost Comparison of structural system The impact of the change in architecture on the tenant and rentable area 4/19/2017

Project Proposal Solution Method: Utilize ACI 318-05 Building Code Requirements for Structural Concrete Utilize ADAPT-PT to design beams and slab Utilize PCA Column and ETABS to design columns and shear walls Utilize RS Means Building Construction Cost Data for a structural cost analysis Compare and contrast new vs. old architecture 4/19/2017

Building Redesign Columns PT floor system PT beams Shear Walls Foundation 4/19/2017

Columns Design floor layout to support larger bays with fewer columns PCA Columns aided in design of reinforcement ETABS used to verify column sizing 4/19/2017

Columns 4/19/2017

Columns 4/19/2017

Columns 4/19/2017

Columns 30”x30” columns requiring 32-#11 vertical reinforcing 4/19/2017

Post-tensioned Slab Design post-tensioned slab using ADAPT-PT as an aid Keep slab thickness close to 8” as recommended by span/depth ratio 4/19/2017

Post-tensioned Slab 4/19/2017

Post-tensioned Slab Unit strip method Determined a 9.5” slab was required 2 tendons required for first and last 2 spans 1 tendon for the remaining spans 4/19/2017

Post-tensioned Slab 4/19/2017

Post-tensioned Slab 4/19/2017

Post-tensioned Beams Design post-tensioned beam using ADAPT-PT as an aid Keep beam thickness close to 27” as recommended by span/depth ratio 4/19/2017

Post-tensioned Beams 4/19/2017

Post-tensioned Beams 2 different beams had to be designed 2 span (57’6”,57’6”) 3 span (42’6”,30’,42’6”) Designed 28” deep for both spans 27 tendons needed for 2 span and 19 tendons for 3 span 4/19/2017

Post-tensioned Beams 4/19/2017

Post-tensioned Beams 4/19/2017

Lateral System Redesign braced frames into shear walls while maintaining current location 4/19/2017

Lateral System 4/19/2017

Lateral System 4/19/2017

Lateral System ETABS assisted in the design Found that a 12” wall was a sufficient thickness Boundary elements were designed to fit inside the 12” wall 4/19/2017

Lateral System 4/19/2017

Foundation Considered, however, not redesigned Heavier concrete columns and shear walls Larger piers and slabs Stronger concrete 4/19/2017

Foundation 4/19/2017

Cost Analysis Beams and Girders Size Quantity Average Length Cost per ft Cost per Floor W8x15 3 10 $37.00 $1,110.00 W12x14 8 $36.00 $2,880.00 W12x19 5 15 $2,700.00 W14x22 2 13 $47.00 $1,222.00 W16x26 42 30 $53.00 $66,780.00 W16x31 1 $63.50 $1,905.00 W16x57 4 $98.50 $11,820.00 W18x35 25 $81.00 $60,750.00 W18x40 81 42.5 $72.00 $247,860.00 W21x44 34 $87.50 $2,975.00 W21x50 27 $79,785.00 W24x55 33.2 $107.00 $10,657.20 W24x62 $121.00 $3,630.00 Total Cost per Floor $494,074.20 Total Building Cost $2,964,445.20 4/19/2017

Cost Analysis Slab Columns Beams Depth Area # of Height Length 0.83 46575 51 11.84 6.25 16 115 4.72 Total (c.y.) 1431.75 139.78 321.66 Cast-in-Place Concrete Cost per c.y. 610 1375 1200 Cost per Floor $873,367.50 $192,194.44 $385,991.11 CIP Costs per Floor $1,451,553.06 Total Building CIP Costs $8,709,318.33 4/19/2017

Cost Comparisons A considerable increase in costs of materials and erection 38%   Beam Columns Floor System Total Steel $2,964,445.20 $909,422.64 $2,443,540.96 $6,317,408.80 Concrete $2,315,946.67 $1,153,166.67 $5,240,205.00 $8,709,318.33 4/19/2017

Architecture Comparisons Increased open space bays from 42’6” to 57’6” No fireproofing Fewer columns for partitioned rooms to work around 4/19/2017

Architecture Comparisons 4/19/2017

Architecture Comparisons 4/19/2017

Conclusions New floor system increased bay sizes without sacrificing ceiling/floor height Cost of new system far exceeds cost of existing system 4/19/2017

Acknowledgements Thesis Advisors: Industry Contacts: Other Mentors: Dr. Thomas E. Boothby Industry Contacts: Gary R. Strand, P.E. - Simpson Gumpertz & Heger David B. Smith, P.E. - Holbert Apple Associates Richard Apple, P.E. - Holbert Apple Associates Other Mentors: Professor M. Kevin Parfitt Professor Moses Ling 4/19/2017

Questions ? 4/19/2017