The proposal in the context of the CHy programme of work Paul J. Pilon Advisory Working Group Member (Leading Activities associated with Basic Systems.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Developing people, improving young lives MTL Logistics workshop 14 May 2009 Mark McKiernan – Lead for MTL Logistics Joaquin Perez – MTL logistics.
PROPOSAL FOR THE ASSESSMENT OF THE PERFORMANCE OF FLOW MEASUREMENT INSTRUMENTS AND TECHNIQUES Paul J. Pilon(1), Janice M. Fulford(2), Zurab Kopaliani(3),
TASK TEAM ON THE WIGOS REGULATORY MATERIAL Third Session GENEVA, SWITZERLAND, NOVEMBER Work of Other WMO Bodies Relevant to the Development.
THE FIRST MEETING IMPLEMENTATION 1. Goals Set Direction Establish Agreed Upon Necessity Establish Lead Individuals Team Building Management Support Success.
Table of contents 1 Manual of Operational Procedures (MOP) 2
NICE and National Clinical Audit Participating Trust Perspective Jean Schofield Clinical Audit Development Manager.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
WMO Flow Measurement Instruments & Techniques AWRA Conference, 3-7 November 2014 World Meteorological Organization’s Project X Janice M. Fulford 1, Paul.
Development of a Regional DRM Strategy for the Tourism Sector in the Caribbean Regional Workshop – May 5th, 2009 – Trinidad & Tobago The Sixteen Steps.
Humanitarian Programme Cycle Updates
Way forward Florence, 13/09/2013. Timeline Report of Florence and framework proposal 1 ?/10 Call for proposals => 15/11 Concept Note By 7/10 Guidelines.
Patient Involvement in Pain Guidelines Judy Birch Pain Alliance Europe NHS Evidence Accreditation Advisory Committee.
INTEGRATING BENEFICIARY FEEDBACK INTO EVALUATION- A STRUCTURED APPROACH Presentation to UKES Conference May 2015 Theme: Theory and practice of inclusion.
Background Implementation Process Experiences Implementing the IPF/IFF Proposals for Action Workshop Enhancing the NFP process of,
PISA FOR DEVELOPMENT Technical Workshops Project up-date 8 th April 2014 OECD Secretariat 1.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
The Development of a Higher Level Apprenticeship in Construction Operations Management and an Integrated Foundation Degree.
Draft model for the Annual and Final implementation report under the Investment for Growth and Jobs goal Marko Prijatelj Directorate General for Regional.
Summary Report On Urban Flood Risk Management Project (UFRM ) Derek Leong Meteorologist Typhoon Committee Secretariat 1/18.
ICA Transport Sector Platform ICA Member’s Meeting Paris, 17 May, 2011 Japan International Cooperation Agency (JICA)
A Strategic Economic Plan for the Humber. Overview An overarching economic strategy for the Humber Forms the basis of a Growth Deal with Government Contains.
WMO Data Management and Data Policy Mike Manore Environnent Canada ICG-WIGOS-4, Feb 2015.
Overview of New Funding Model May 17, 2013 Astana, Kazakhstan.
 Commissioners in Somerset wanted to test whether outcomes based commissioning would lead to better outcomes and greater financial sustainability  External.
© Crown copyright Met Office Requirements, objectives and desired outcomes for the Workshop Stuart Goldstraw, CBS IOS ET-SBO Chair, 24 th April 2013.
Process Assessment Method
ESPON 2013 Programme Info Day on New Calls and Partner Café Call for Proposals on Applied Research.
Need to Invest Investment Objectives and Case for Change Programme Option Identification and Assessment Analysis Strategic Case: Economic Case: Financial.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO WMO STRATEGIC PLAN Timelines and expectations.
TOWARDS THE APPRAISAL OF THE CUMULATIVE AND DYNAMIC IMPACT OF DISASTERS ADVISORY GROUP - FIRST MEETING INFORMATION AND INDICATORS PROGRAM FOR DISASTER.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Grand Rapids 2030 District Summit October 30,
REPORT OF THE TASK FORCE ON IMPACT ASSESSMENT OF FELLOWSHIPS IN THE UN SYSTEM AND AGENCIES Dr Alexandre Goubarev, WHO/Impact Assessment Taskforce Chair.
Title page. Vision Where we’ve come from From draft to final.
NHS Education & Training Operating Model from April 2013 Liberating the NHS: Developing the Healthcare Workforce From Design to Delivery.
ESS Vision 2020 Strategic Risk Management Risk Mitigation Involvement of the DIME-ITDG DIME-ITDG Steering Group – item 07 Luxembourg,
GESAMP (IMO/FAO/UNESCO-IOC/WMO/WHO/IAEA/UN/UNEP Joint Group of Experts on the Scientific Aspects of Marine Environmental Protection) February 7-8, 2002,
Material produced under Phare 2006 financial support Phare TVET RO 2006/ Project financed under Phare EUROPEAN UNION MERI/ NCDTVET-PIU.
FBAG- Catchment Planning Floods Directive and Flooding Bill Flood Risk Management Planning.
Summary of the Submission of the United States On the development of a five-year programme of work on the scientific, technical and socio-economic aspects.
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 May 1, 2014.
The Panafrican Programme Reference Group on Infrastructure February 2016 Addis Ababa.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Large Facilities Manual New Guidance on Cost Estimating and Analysis 2016 NSF Large Facilities Workshop Kevin Porter Large Facilities Advisor, LFO, NSF.
Preparations for the third meeting of the Technical Expert Group to develop a framework for the ESM of wastes Briefing to the Permanent Missions in Geneva.
Implementation of the SDG indicator framework
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
COMMISSION FOR HYDROLOGY (CHy)
Preparations for the third meeting of the Technical Expert Group to develop a framework for the ESM of wastes Briefing to the Permanent Missions in Geneva.
Decisions on developments in Service Delivery including PWS
Version 0.1Assessment Method Overview - 1 Process Assessment Method An objective model-independent method to assess the capability of an organization to.
Project Management Tools
Final Report of TF-CS/OTA September The Amba Hotel, London
Overview of WMO Strategic Planning Initiative
INSPIRE Test Framework
…and still actual for a post-2010 strategy!
Overview What is evaluation? Why an evaluation framework?
UK Link Programme and ‘Nexus’ UNC Modifications
Government of Sri Lanka A project implemented in partnership with ITC
Scientific and Operational Context and Requirements for JCOMM Doc 3. 1
Conclusions of the seminar
ET-CAC Report Kevin ALDER Agenda item 6-3 (1)
Bernie Thomas, LCA Policy Adviser
Item 11. Overview of EG activities
FUTURE INFRASTRUCTURES
Decisions on developments in Service Delivery including PWS
Commission on Instruments and Methods of Observation
Presentation transcript:

The proposal in the context of the CHy programme of work Paul J. Pilon Advisory Working Group Member (Leading Activities associated with Basic Systems (Hydrometry and Hydraulics) Geneva April 25-27, 2007

CHy Terms of Reference Objective: –Develop a proposal and implement a project to assess the performance of flow measurement instruments and techniques against WMO standards Expected Output/Outcomes: –Publications on the performance of flow measurement instruments and techniques –Identification of new technologies and practices for potential inclusion in HOMS Guidance material, manuals… Success is dependent on contributions and participation on individuals and organizations

Overview of Approach Develop a framework and identify/build the required “infrastructure” that will allow: –development of assessment capabilities –posting of results in agreed upon formats so that they may be “pooled” and used by others –Understanding the limitations of the instruments and techniques the uncertainty of the estimates of flow Draft proposal –Purpose and scope –Approaches to be taken in the project –Implementation Plan (timelines, key players, associated costs)