Life Cycle Analysis The ODOT Way 2003 Transportation Estimators’ Association Burlington, Vermont September 4, 2003 Jennifer McAllister TEA 2003 – LCCA.

Slides:



Advertisements
Similar presentations
AD/AB - LCCA 2 nd Session Wednesday, January 29th.
Advertisements

Transportation Estimators Association Annual Conference Synthesis on Construction Unit Cost Development Stuart D. Anderson, PhD, PE Texas Transportation.
1 Bid Evaluation - Goods Objective Secure goods/services at most economical cost Price only one factor Other optional factors Time of delivery/completion.
ASPHALT PRICE ADJUSTMENT PRICE ESCALATION IN THE 21 ST CENTURY.
Maintenance Forecasting and Capacity Planning
Federal department of environment, transport, energy and communications ETEC Federal Office for the Environment FOEN Risk Assessment on Pipelines: the.
Life-Cycle Cost Analysis
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
Pat Gardiner Bureau Of Maintenance And Operations 1.
US Department of Energy Smart Grid Computational Tool (SGCT) Overview Note: View presentation in Slide Show mode for best results
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Cost Estimating TRT Initial Meeting Executive Summary Salem, Oregon May 20 – 22, 2008.
Prepared by: Carol Eddy, CPM / Eddy Management Group
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding Virginia Concrete Conference Richmond, VA March 6, 2014.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
Chapter 5 Time Series Analysis
1 8 Concepts of Database Management, 4 th Edition, Pratt & Adamski Chapter 8 Database Administration.
OPIM 310 –Lecture # 1.2 Instructor: Jose M. Cruz
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
Journal Article Presentation: Shocks and Valuation in the Rental Housing Market Alm, James and Follain, James “Shocks and Valuation in the Rental Housing.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
Thermally Insulated Concrete Pavements: Life-Cycle Cost Analysis Methods and Preliminary Results January 10, 2011 John Harvey Nick Santero Lev Khazanovich.
CHAPTER 7 Managing Inventories
LADOTD CONSTRUCTION COST ESTIMATING Charles Nickel, P.E. Cost Estimate & Value Engineering Director Office: (225)
EM15 – Contractors COST MANAGEMENT
MR2100 (c) Paul Tilley Pricing: Building a Price Foundation Chapter 13 Marketing 2 MR2100.
Quantities 2 Plans Prepared by Heath Bielefeldt Wisconsin Department of Transportation
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
TEA, Portland, Maine Travis Koestner Missouri Department of Transportation October 20, 2006 Alternate Paving Update $$ Cost Control at MoDOT $$
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
1. GROWTH OF REAL GDP AND BUSINESS CYCLES Learning Objectives 1.Define real gross domestic product and explain how its calculation avoids both double-counting.
GPD and Changes in Price Level Chapter 13, Section 2.
Lecture 6 Dr. Haider Shah.  Understand what are the primary tools for forecasting  Understand regression analysis and when and how to apply it.
O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n Ohio Construction Cost Indices and Inflation Forecasts TEA Conference October 6, 2007 Prepared.
Cost Estimation System CES Implementation at NDOR TUG 2006.
Webinar Texas Department of Transportation : Costs Associated with Conversion of Surfaced to Un-Surfaced Roads August 30, 2012.
Bill Savings Costs and Bill Saving in the Low Income Energy Efficiency Programs for 2002 to 2004 Bill Savings Public Workshop April 15, San Diego.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
Budget Analysis Ag Management Chapter 4. Planning a Budget GGood planning = Increased Returns TThe job you do when your budget for your farm or ranch.
Update.  FY 2014 Appropriations Act (Notice PIH )  FY 2015 Appropriations Act  Interim Rule published in the Federal Regulations, October 8,
Exemplary Steps A general reference for estimating with Oman BidTabs Professional Division of Project Management Indiana Department of Transportation.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #9.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
HealthCarePolicy& Financing SB15-228: RateReview Schedule Wilson D. Pace, MD Review Panel Member Slides from HCPF – Comments and Views Solely Those of.
United Nations Statistics Division Dissemination of IIP data.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Office of Estimating 2015 OCA Leadership Forum.
PRODUCTION & OPERATIONS MANAGEMENT Module II Forecasting for operations Prof. A.Das, MIMTS.
CONTEMPORARY ECONOMICS© Thomson South-Western 11.4Aggregate Demand and Aggregate Supply  Explain what is meant by aggregate output and the economy’s price.
HMA Warranties The Wisconsin Experience Presentation to the California Department of Transportation.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 8 Forecasting To Accompany.
F5 Performance Management. 2 Section C: Budgeting Designed to give you knowledge and application of: C1. Objectives C2. Budgetary systems C3. Types of.
Welcome to MM305 Unit 5 Seminar Dr. Bob Forecasting.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
(Additional materials)
2013 Specification Implementation
Life Cycle Cost Analysis
Cost estimation and behaviour
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
Concrete Pavement Analyst 1 ADTT / 2.25 SN
2013 Specification Implementation
AUG Query Responses 21st November 2013.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
What is it and how is it measured?
School Finance Update CASE Nuts & Bolts
Presentation transcript:

Life Cycle Analysis The ODOT Way 2003 Transportation Estimators’ Association Burlington, Vermont September 4, 2003 Jennifer McAllister TEA 2003 – LCCA – J. McAllister

How it Was Pavement Engineering Office provided quantities and items Office of Estimating supplied unit prices –Based on estimator’s judgment –Completely subjective TEA 2003 – LCCA – J. McAllister

What Prompted Change? New pavement selection process required documentation of all aspects, including life cycle cost analysis. In particular, methodology for determining unit prices. TEA 2003 – LCCA – J. McAllister

Estimating’s Role Document methodology for determining unit prices. Determination should be completely objective. Remove the “human factor” TEA 2003 – LCCA – J. McAllister

Disclaimer “The methods described herein are utilized solely for determining unit prices for comparison analysis and planning, and are not representative of methods used in the preparation of the Ohio Department of Transportation’s Official Engineer’s Estimate.” more…

Disclaimer (continued) “The Engineer’s Estimate is refined as job parameters unknown at the time of LCCA are identified. Some of the parameters impacting the final unit price include anticipated market conditions, seasonality, time restrictions, and material cost fluctuations due to economic conditions.” more…

Disclaimer (continued) “The Life Cycle Cost unit prices reflected in this study assume equality of these parameters for each scenario, and attempt to eliminate judgments from the final figures.”

Methodology – Warranty Asphalt Three year average unit price by county Compare each county to statewide average Calculate adjustment factor (level the playing field) Sort warranty asphalt bid data by county Apply adjustment factor Find base price for quantity range TEA 2003 – LCCA – J. McAllister

Methodology – Warranty Concrete Compare against non-warranty concrete Data not as plentiful Fluctuations between counties appear to be minute Convert all warranty concrete bids and quantities to 9” thickness & plot the data points Determine the equation of the line TEA 2003 – LCCA – J. McAllister

Warranty Concrete (cont.)

Maintenance Schedules Quantities for future maintenance supplied by Office of Pavement Engineering Unit Prices supplied by Office of Estimating Same constraints – Prices must be objective for major cost items Regression used to formulate matrices for all items TEA 2003 – LCCA – J. McAllister

Updates to the Process Schedule for updating methods and matrices to be determined As contents of the data universe expand, methods may be revised Objectivity, objectivity, objectivity TEA 2003 – LCCA – J. McAllister