Zebra connectors KAREN PALMER SARAH JONES. Companies Company Price/100 connectors ($) Additional Charges ($) Estimated Delivery notes Fujipoly< 17.13*

Slides:



Advertisements
Similar presentations
Basics of Job-Order Costing
Advertisements

O T F O R D T O O L & G A U G E C O M P A N Y L I M I T E D The Design and Manufacture of Mini Applicators O T F O R D T O O L & G A U G E C O M P A N.
Using MPanel Shade Designer
Power Screw and Springs
The Electric Materials Company Right the First Time On Time Every Time.
Puzzle Cube Project Ms. Bruce Grove City High School.
Sodick High-Speed Small Hole Driller
ACH Connectors PURPOSE:
Welcome to Bamar Plastics, Inc S. Robinson St., South Bend, IN (574) Phone, (574) Fax First in Class:
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Soldering Jumper Wires SPIRIT Strip about ¼” of insulation Apply solder until wire appears soli d “Tin” the wire.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Home Work #4 Due Date: 18 Mar, 2010 (Turn in your assignment at the mail box of S581 outside the ME general office) The solutions must be written on A4.
1 As Class Convenes u Find your team table u Pick up your folders u Sign attendance sheets.
Sheet Metalworking Chapter 20- Part 1
P14311: PCB Isolation Routing System Problem Definition Review.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
Lean Manufacturing Auburn Engineering Value Stream Mapping By Bill Carver.
Mold Design Guidelines Chapter 4
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
FCAT Review Students will write, interpret, and use mathematical expressions and equations.
Basic Machine Processes Competency D Identify the basic concepts of the manufacturing processes.
5 Tips to Creating a Line Sheet That Retailers Understand Presented By:
Job-Order Costing Is used when different types of batches or products are produced special order printing, construction, law office.
9/9/2015IENG 475: Computer-Controlled Manufacturing Systems 1 IENG Lecture 07 Process Planning.
12600, Cardinal Meadow #405, Sugar Land, TX , Cardinal Meadow #405, Sugar Land, TX
Dimensioning & Tolerances 2 Manufacturing Costs Breakdown BREAKDOWN Manufacturing Cost Analysis 3.
Presentation of HanKing
Principles of Manufacturing M anufacturing Mathematics Copyright Texas Education Agency (TEA)
Designing for 3D Printers PART 1: KNOW YOUR PRINTER.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
MOULDING. Fibres, Fabrics, Foams, Moulds A fibre can only be moulded if it can be heat set. Moulding a fibre is to stretch it to a new shape take it to.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. PowerPoint to accompany Krar Gill Smid Technology of Machine.
Module 17 Product Costing.
THE COST OF MANUFACTURING How much does manufacturing cost?
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
 What type of Inspection procedures are in use  Where in the process should inspection take place  How are variations in the process detected before.
IENG 217 Cost Estimating for Engineers Product Estimating.
Make a Model A box company makes boxes to hold popcorn. Each box is made by cutting the square corners out of a rectangular sheet of cardboard. The rectangle.
ZDC CRANE PROJECT Y. Onel September 28, Progress since last meeting Our Mock-up is found at CERN, inspected by CERN Engineering and found satisfactory.
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
Modelling and Prototyping Aims: To be able to DESCRIBE the process of SKETCH MODELLING and BLOCK MODELLING. To be able to EXPLAIN the reasons for using.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
Various shapes and sizes of steel are available for different purposes. Blooms, billets, and slabs arrive at finishing mills, where they are formed into.
SWQ Review 1-1,1-4,1-5,1-6,1-7. Write an equation to represent the relationship “a number decreased by negative 2 is equal to 21.” Then solve the.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
Production Planning and control – ME 1009 Unit 1 Introduction.
HLH Technology Offers Plastic Molding In China
Types of Blades used on Cutoff Saws and Tips on using Saws
Your first, second and third choice for tooling
Introduction To Challenge Coins
Introduction to New Product Development (Documentation)
AUH Connectors PURPOSE:
HLH Prototypes is Offering Plastic Prototyping, Tooling and Production services.
BULK DEFORMATION PROCESSES IN METALWORKING
7/9/2018IENG 475: Computer-Controlled Manufacturing Systems 1 IENG Lecture 07 Process Planning.
Visit for more Learning Resources
ACHF Connectors PURPOSE:
IENG 475: Computer-Controlled Manufacturing Systems Process Planning
Home You can view all Flo Fab rep order that been sold so you can easily get end user feedback Call factory for password.
ACHL Connectors PURPOSE:
IENG 475: Computer-Controlled Manufacturing Systems Process Planning
Välkommen/Welcome – who ever concerned…
Presentation transcript:

Zebra connectors KAREN PALMER SARAH JONES

Companies Company Price/100 connectors ($) Additional Charges ($) Estimated Delivery notes Fujipoly< 17.13* 588  prototype tooling 1650  production tooling > 2 weeks30 um diameter copper wire Ruter  shipping 2-3 weeks** 30 um diameter copper wire um pitch Z-Axis  one-time setup 4 weeks*** 50 um diameter copper wire um pitch * FujiPoly’s quote was for 75 connectors ** includes getting through UA procedures *** estimated delivery to UA Most charges expected to decrease with a larger order

Types of connectors FujiPoly has two types of connectors we are interested in: FG-S  wires are embedded in the silicone D-type  wires are wound around 3 sides of connector Multiple materials: Gold, Silver, Carbon Ruter and Z-axis offer gold connectors in “FG-S” style

Details on companies availability Ruter and Z-axis dimensions: height = mm length = 103 mm width = 3 mm wire pitch = 100 um wire width = 30 um All companies were given relatively the same dimension specifications Some companies do custom dimensions and designs Typically there is a min/max dimension range for these companies FujiPoly issues: **dimensions were set by their “type” of connector Series 8000C (D-type) Prototyping tool: for 75 connectors, would have to purchase another if dimensions changed they are not currently manufacturing FG-S unfortunately Min order amount  $250 FujiPoly dimensions: height = mm length = mm width = mm wire pitch = ~152 um** wire width = ~ 70 um **

Testing System CONNECTOR IS TOO SHORT: FAR LEFT PAD NEVER CONNECTS. TESTING IS DONE IN 8 SETS OF 31 1K Ω RESISTORS.

Testing System Detail

EXAMPLES OF FLAWS IN RUTER GOOD CONNECTOR FLAWS IN FUJIPOLY

Machining: cost prohibitive Sample quotes for professional machine shops CustomPart.net Part Quantity 4700 Workpiece: Rectangular bar Price per bar $17.48 Total Material Cost: $30, First Cut Material:ABS Black Shipping:3 business days (no expedite charge) Quantity:1 Cost: $ Hourly Rates: $30 - $40Very Small (no overhead shop) $60 - $80Standard shop w/ overhead and inspection $150 - $200Large shop and machinery $ $ $85http://

In-house Machine Shop In-house CNC Machining ABS plastic not rigid Master Machinist on campus G-10 plastic is rigid labor cost for 1 holder: $200 3-D Printing There are limited options for plastic material Small printer: one holder may be done at a time Dissolving support material takes several hours Final product is flimsier than ABS holder

Injection Molding CompanyPriceMoldnotes Protomold $ 10, $ 2, parts; mold price includes $500 setup charge + 25 samples QuickParts $ 12, $ 5, parts; mold price includes 25 samples RedEye $ 11, $ 8, parts; Sept 28 (quote valid for 2 weeks) PlastikosN/A Aug 28-29: company specializes in smaller parts. CAD drawing sent, no response from company after that. Protomold is interested in our business They have continued to make contact They have kept our records while we finish designing

Concerns Companies have varying pricing This has shown up in the quality control! Ruter connectors have little better than 50% success rate in testing Fujipoly cost and communication issues Longer connectors are needed A re-design of the holder may be required Significant compression is necessary for connection