MRP: MRP: Material Requirements Planning Manufacturing Resource Planning.

Slides:



Advertisements
Similar presentations
Material Requirements Planning
Advertisements

To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Material Requirements Planning
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Managing Production across the Supply Chain
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
Materials Requirements Planning (MRP) Chapter 16 in Schroeder.
Material Requirements Planning Planned Orders Demand BOM Material Data Inputs Output.
4. Production and Material Planning
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles January 2002.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
1 Material Requirement Planning (MRP) Chapter 16 Feb 9, 2006.
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 22 1.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Resource Requirements Planning:
Chapter 16 Inventory Systems for Dependent Demand
MRP.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Material Requirements Planning
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Operations Management MRP Lecture 22 (Chapter 14)
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Master Production Scheduling
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Production Planning and Control
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
Material Requirements Planning
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
SISTEM INFORMASI ENTERPRISE
MATERIAL Requirements planning MRP
Facility Inventory Old Facilities Modern Facilities Classroom Size
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 Materials Requirements Planning
MRP.
MRP and ERP.
CHAPTER 14 MRP and ERP.
MATERIAL Requirements planning MRP
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
MRP Introduction EXAMPLES
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

MRP: MRP: Material Requirements Planning Manufacturing Resource Planning

Make to Order (Pull) Initiate production at the moment that a customer places a firm order Make to Stock (Push) Pre-produce and store in anticipation of forthcoming customer orders Assemble to Order Pre-produce & store sub-assemblies; finish when customer places order

JIT / MRP JIT (Demand Flow) As needed … “Pull” Low variability High predictability (by definition) Kanban MRP In anticipation … “Push” High variability High predictability (Inventory buffers low predictability) Computer-intensive

How much of an item is needed to meet demand? When? What parts and components are required? When? When to order parts and components? Materials Requirements Planning (MRP)

MRP Core Concepts Dependent Demand …Production (or procurement) of parts and materials is directly linked to demand for the final product Time-phased Scheduling …Parts and components must be ordered in advance to accommodate lead times between order placement and receipt

MRP Building Blocks Bill of Material …Hierarchical structure of a product, including quantities …Material - Parts - Components - Sub Assemblies Routing …Detailed production steps in required sequence …Activity equivalent to BOM Demand forecast …Independent => Dependent

Requirements Planning Determining the levels of inputs needed to produce a desired level of output Gross Reqs. (Demand) Planned End Inv. Starting Inv. Net Reqs. + - = EXPLODED Bill of Material Requirements extended successively to each level of the bill of material

Materials Requirements Planning (MRP) Lead Times A1 day B 2 days C1 day D 3 days E4 days F1 day Demand Day A Day 8 20 B (Spares) Day 6 15 D (Spares) Create a schedule to satisfy demand. B(4) E(1)D(2) C(2) F(2)D(3) A

Day ARequired 50 Order placement 50 LT = 1 day.... Demand : When Required Lead Time Offset Manufacturing Order (MO) Purchase Order (PO) Lead Time Offset

Day ARequired 50 Order placement 50 BRequired Order placement Spare Parts B(4) E(1)D(2) C(2) F(2)D(3) A Part(QTY) LT Generate Requirements BOM Explosion

Day ARequired 50 Order placement 50 BRequired Order placement CRequired 100 Order placement 100 DRequired Order placement ERequired Order placement FRequired 200 Order placement 200 B(4) E(1)D(2) C(2) F(2)D(3) A Part(QTY) LT

MRP Consolidate requirements …By part / material …By due date Determine economic lot sizes …Order costs …Quantity discounts …Inventory carrying costs Issue MOs and POs Finishing the Job

MRP Forecasts (Independent Demand) Bill of Material => Dependent Demand Lead Time (by component) Ordering Rules (e.g. EOQ) Key Variables

Materials Requirements Planning (MRP) Key Questions How much of an item is needed to meet demand? When? What parts and components are required? When? When to order parts and components? Key Variables Forecasts (Independent Demand) Bill of Material (Dependent Demand) Lead Time (by component) Ordering Rules (e.g. EOQ)