Construction Management

Slides:



Advertisements
Similar presentations
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Advertisements

Skyscraper Construction
Chilled Beam Presentation
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Capital One Lecture Hall Sean C. Ehlers – Construction Management Capital One Lecture Hall McLean, VA Sean C. Ehlers Construction Management Advisor: Dr.
C AMPUS S QUARE H ARRISBURG, P ENNSYLVANIA A NDREW M ARTIN | C ONSTRUCTION M ANAGEMENT | A PRIL 12, 2010.
BECOMING GREEN Santa Margarita High School Academic Building.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
George Read Hall The University of Delaware
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
AE Senior Thesis 2007 Bloomindales Department Store Chevy Chase, MD.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Architectural Engineering Construction Management Senior Thesis April 11 th, 2011 Consultant: Dr. Riley Architectural Engineering Spring 2011 – Senior.
Greg Blatt Penn State Architectural Engineering Construction Management April 12, 2004.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Swedish American Hospital Heart and Vascular Center Philip Frederick Structural Option AE Senior Thesis 15 April 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Computer Associates International, Regional Office
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Student Health Center Jacob Brambley - AE (structural option)
Goizueta Foundation Center For Research And Doctoral Education Emory University, Atlanta, GA.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Green Concrete 1 1.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
North Hall | American University| Washington D.C.
Pearl Condominiums Philadelphia, PA
Abington Memorial Hospital Abington, Pennsylvania
David Anderson Mechanical Option
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
Wrangle Hill Elementary School New Castle, DE
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Lehigh Valley Heritage Center
Project Background Type of building: Mixed-use residential building
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Construction Management M I N I T A B H E A D Q U A R T E R S Erin E. Hess Construction Management Senior Thesis Presentation April 15, 2003 Alexander Constructors, Inc. Building Construction

Presentation Outline Project Description Cladding System Mechanical System Green Building Summary & Conclusions Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Presentation Outline

Project Description Headquarters for Minitab, Inc. Developer of data analysis software Location: State College, PA Construction: June 2001 – December 2002 Size: Site 16.8 acres Facility 88,000 SF Cost: $ 14 Million Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Project Description

Architecture Four Story Exposed Basement Full four-story atrium with glass elevators, pond, and waterfall 209 offices, 18 conference rooms, theater, exercise area with locker rooms, game room Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Project Description

Contractor Selection CM Proposal Alexander chosen based on Qualified Team Local Company Project Team Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Project Description

Thesis Project Goals Project Description Maintain clean architectural appearance Maintain superior energy efficiency Complete construction by November 2002 Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Project Description

Presentation Outline Project Description Cladding System Mechanical System Green Building Summary & Conclusions Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Presentation Outline

Existing Cladding System Exterior Insulation Finish System (EIFS) Prefabricated, panelized system Four foot, seamless mullion ribbon windows Glass fiber reinforced panels Prefabricated EIFS panels Ribbon windows GFRC panels Rear entrance constructed & finished on-site Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Project Description

Cladding System Desired Appearance Economic Performance Clean lines Economic Performance Energy efficient, maintain R-20 Life Cycle Cost Installation Maintenance & Repair Energy Savings Inflation Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Precast Concrete Panel Maintain Architectural Appearance Variety of finishes and colors Thermal Efficiency Add rigid insulation to precast assembly Maintenance Durable Cost efficient Resistant to moisture. Photo courtesy Tindall Corporation: Houston Co. Spec., Perry, GA Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Life Cycle Cost Analysis Thirty year study period Exterior façade area 23,000 SF Maintain insulation value of R-20 ASTM Standard Practice for Measuring Life Cycle Costs of Buildings and Building Systems Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

EIFS Installation Cost Exterior Insulation and Finish System (EIFS, Class PB) Cost per square foot Fiberglass batt insulation, 6 in. thick, 15 in. wide $0.60 EIFS Framing, 6 in. metal studs @ 16” o.c. Cement board sheathing, ¾ in. 4” Expanded polystyrene insulation board (EPS) EIFS base coat Reinforcing mesh Finish coat $15.75 Total unadjusted present value cost = $16.35 Total Installation Cost = $376,050 Location Adjustment (State College, PA) = 95.4 percent = $358,752 Time Adjustment (July 2001) = 96.1 percent = $344,761 TOTAL INSTALLATION COST = Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Precast Installation Cost Precast Concrete Cost per square foot Metal studs, non-loadbearing galvanized @ 16” o.c. $0.85 Fiberglass batt insulation, 6 in. thick, 15 in. wide $0.60 Flat precast concrete panel Thickness – 6 in. thick Panel size (ft) – 6 x 18 Finish – smooth gray Rigid insulation – 2 in. Type – low rise $10.45 Add’l 2 in. rigid insulation* $0.73 Total unadjusted present value cost = $12.63 Total Installation Cost = $300,370 Location Adjustment (State College, PA) = 95.4 percent = $286,553 Time Adjustment (July 2001) = 96.1 percent = $275,377 TOTAL INSTALLATION COST = Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Projected Life Cycle Cost (Present Value Dollars) Projected Maintenance Costs Projected Life Cycle Cost (Present Value Dollars) Cladding and Structural Framing Assembly Estimated Installation & Maintenance Costs (Year) Total Life Cycle Cost 15 20 25 30 EIFS (Class PB) cash outflow (initial costs and maintenance) 344,761 7,318 11,119 $ 363,198 Precast Concrete 275,377 22,079 6,183 $ 303,639 Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Life Cycle Cost Installation Maintenance Total Life Cycle Cost EIFS - $344,761 Precast - $275,377 Maintenance EIFS - $18,437 Precast - $28,262 Total Life Cycle Cost EIFS - $363,198 Precast - $303,639 Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Structural Impact Typical Structural Frame Panel Size Bays 24’-0” x 19’-9”/19’-5” Panel Size 24’-0” x 7’-3” Cladding Assembly Panel Size Weight (per Panel) EIFS Panel 4 in. EPS insulation Heavyweight reinforcing mesh 20 ga., 6 in. metal studs @ 16” o.c. 24’-0” x 7’-3” 581 lbs. Precast Panel 6 in. lightweight concrete (50 pcf) 4,408 lbs. Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Structural Impact Calculation of Additional Loading Tributary area = 242 SF Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Structural Impact Cladding System EIFS (lbs) PRECAST ROOF Dead Load 588.8 Live Load 26,620.0 THIRD/SECOND/ FIRST FLOORS 38,007.0 49,448.0 50,820.0 TOTAL LOADS 38,596.0 50,077.0 77,440.0 DESIGN LOAD: 1.2 DL + 1.6 LL 170,219 183,996 Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Structural Impact Design Load Increase Original Perimeter Columns 13,777 pounds per bay; 8% increase Original Perimeter Columns W12X45 Design Load Capacity = 350 kips Resized Perimeter Columns W12X50 Design Load Capacity = 393 kips; 12.3% increase Increased Steel 30 Perimeter columns, each 38 ft. in length Increase of 5 plf = 2.85 tons => $4,047. Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Schedule Analysis EIFS – Fork lift Cladding System Panelized EIFS Installation Detail ACTIVITY DURATION 1. Attached panel to fork lift rigging. 10 min. 2. Maneuver forklift to panel installation location. 5 min. 3. Align panel with pre-installed steel angle attachments. 15 min. 4. Level and attach panel to structural steel frame. 30 min. TOTAL EIFS PANEL INSTALLATION DURATION (per panel): 1 hour TOTAL ACTIVITY DURATION: 9 DAYS Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Schedule Analysis Precast – Crane Cladding System Precast Panel Installation Detail ACTIVITY DURATION 1. Attached panel to crane rigging. 15 min. 2. Maneuver panel to installation location. 30 min. 3. Align panel with pre-installed steel angle attachments. 4. Level and attach panel to structural steel frame. 60 min. TOTAL EIFS PANEL INSTALLATION DURATION (per panel): 2.25 hours TOTAL ACTIVITY DURATION: 19 DAYS Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Cladding System Summary Use of Precast Concrete Panel System First Cost Savings = $69,384 30-year Life Cycle Cost Savings = $59,559 Increased Structural Steel = $4,047 Overall Cost Savings $55,512 16% savings on exterior cladding budget 0.5% savings on project estimated cost Increased project schedule 10 days Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Cladding System

Presentation Outline Project Description Cladding System Mechanical System Green Building Summary & Conclusions Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Presentation Outline

Original Mechanical System Dedicated outdoor air system with parallel radiant panel system Ventilation system – temperature control, air quality, and latent (moisture) load Radiant panels address remainder of sensible load (temperature) Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Project Description

Mechanical System Redesign Original Design Estimated Cost = $1,500,000 Did not consider structural effects of locating boiler and chiller on roof – additional $200,000. Revised Estimated Cost = $1,700,000 Redesign 100% Outdoor air – geothermal system Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Mechanical System

Mechanical System 100% Outdoor Air – Geothermal System Energy-efficient Environmentally clean Cost effective Minitab Geothermal System 40,000 lf of pipe – 100 wells @ 400 ft. each 278 high-efficiency heat pumps Air to air heat recovery system Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Mechanical System

Geothermal System Individual heat pumps for each space above the ceiling in the corridor. Geothermal Well Field Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Mechanical System

Geothermal System Maintain energy efficiency Maintain indoor air quality Maintain service load requirements Eliminate structural and architectural redesign Cost Savings = $200,000 Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Mechanical System

Presentation Outline Project Description Cladding System Mechanical System Green Building Summary & Conclusions Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Presentation Outline

Green Building Atmosphere conducive to: “We hire the best people and then provide them with an environment that enables them to do their best work.” Atmosphere conducive to: Employee health Quality of life Productivity Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Green Building

Benefits of a Green Building Energy Efficient Advanced Technology Indoor Air Quality Minimize Waste Thermal Comfort Resource Efficiency Minimize waste: excavated material is crushed for use as backfill and parking lot base Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Green Building

LEED™ Certification Two leading categories of LEED™ rated buildings Owner Type – Profit Organization Building Type – Commercial Office Minitab is environmentally conscious Public respect Employee morale Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Green Building

LEED™ Certification Points required for LEED™ Certification 26 – 32 Category Total Possible Points Minitab 1. Sustainable Sites 14 3 2. Water Efficiency 5 4 3. Energy and Atmosphere 17 2-11 4. Materials and Resources 13 2 5. Indoor Environmental Quality 15 9 6. LEED Innovation Credits 1-4 TOTAL: 69 22-33 Points required for LEED™ Certification 26 – 32 Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Green Building

Green Building Associated Benefits Significant gains in worker health Improved satisfaction Increased productivity Higher profits Decreased employee turnover Added value to corporation and building. Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Green Building

Presentation Outline Project Description Cladding System Mechanical System Green Building Summary & Conclusions Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Presentation Outline

Summary & Conclusions Precast Panel Cladding Alternative Maintain Clean Appearance Maintain Energy Efficiency Increase Schedule by 10 days Overall Savings $55,512 15 % Geothermal Heat Pump Alternative Eliminate Design Conflicts No Effect First Cost Savings $200,000 12 % LEED™ Certification Improved Building Function Added value to corporation and building Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Summary & Conclusions

Acknowledgements AE Faculty AE Classmates Family & Friends Alexander Constructors, Inc. Minitab, Inc. Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Acknowledgements

Questions Questions Erin E. Hess Construction Management Senior Thesis Project Minitab Headquarters Questions