Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Advertisements

Homework of HLRF 1 Shigeki Fukuda KEK 2012/4/23 HLRF Homework1 in KILC12 (Fukuda) 1.
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Chapter 1 Quick review over Electronics and Electric Components Prepared By : Elec Solv.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Electrical, Electronic and Digital Principles (EEDP)
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
PIP Update Feb 11 th Agenda Summary Update – Current Activities – Updates (Tom Kubicki) – Additional Meetings/Notes.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
CommunicationElectronics Principles & Applications Third Edition Chapter 6 Radio Transmitters ©2001 Glencoe/McGraw-Hill Louis E. Frenzel.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
April 16, 2009Craig Drennan, AD/Proton Source/Booster1 Upgrading Electronics for the LLRF Electronics Design Efforts Craig Drennan, April 16,2009.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
BARC-IIFC collaboration meet RF Solid-state Power Amplifiers at 325 MHz RFSS, TPD, BARC.
Power Supply Design Howie Pfeffer Mu2e Extinction Technical Design Review 2 November 2015.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
Cost Optimization Models for SRF Linacs
ABS COMPONENTS AND OPERATION
Created by Tim Green, Art Kay Presented by Peggy Liska
S1G Experiment Schedule Plan
WP02 PRR: Master Oscillator and RF Reference Distribution
POWER AMPLIFIERS.
Electronics: Demod + 4Q FE
Amplifiers Classes Electronics-II
Low Level RF Status Outline LLRF controls system overview
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
Amplifiers Classes Electronics-II
Low Level RF Status Outline LLRF controls system overview
Presentation transcript:

Tom Kubicki

 Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates the tube amplifier components  Significant improvement in reliability  Each station uses 4 1kW SSD Amps, along with a combiner, provides up to 4kW of RF power  Components are modular, allows for quick repair and minimizes downtime

 Design based on Cubic Corp. 1kW amplifier used in the Main Injector RF Upgrade  Uses water-cooled heat sinks on the high power components  Design uses a pre-amplifier stage, 2 amplifier boards that each have 2 channels capable of 250W per channel, and an output combiner that sums all 4 outputs into one 1kW output (50 Ω system).

 Why build them here?  Cost of each amplifier built by Cubic would be ~$12K per amp.  All parts have been ordered, at a cost of ~$1.5K per amp.  Substantial cost savings!  Does not include labor, but that is “free”  84 Amplifiers to be built.

 Failure rate is essentially 0  No problem running 15Hz  Possibility to employ feedback for gain and phase regulation (local and global)  Far off into the future on this one, but impossible with current RF system  Plenty of additional drive power for additional beam requirements, and/or to provide beam loading compensation if necessary

 This has been ongoing since 2006, but really ramped up in late  As stated previously, all major parts have been ordered for the SSD amps.  Main amplifier board is stuffed, ferrites ordered, etc.  SSD control units: 20 have been built and tested. This is complete!  SSD Metering chassis: 10 units have been built and tested. 10 remaining, but have all the parts  Low priority on the remaining 10  All diode detectors built, 10 need to be calibrated

 To date, NIM modules used in the SSD rack and Modulator have been built and tested.  20 of each module built, includes spares and possible test station in the future  A few loose ends remaining, but have plenty of modules to complete East Gallery and most of West Gallery.  Booster SSD uses a Low-Level RF chassis, consisting of a phase shifter, variable gain amplifier (VGA), and output amplifier for increased gain.

 The LLRF chassis drives the 1kW SSD amps.  LLRF chassis provides phase adjustment, a linear RF output in proportion to the Solid State Drive Program  16 of these have been built and tested.  Parts have been ordered to build VGA’s, and the remaining LLRF chassis.  Stations 5 & 6 in the East gallery have been upgraded to solid-state.

 In near term, get cables pulled for upgrade to stations 1 & 2.  Cables can be phased-matched during normal operations.  Possible retrofit of Station 19, would get us 4 additional amps for either Station 1 or 2.  Order the rest of the cable needed, Heliax, RG- 58, etc.  List of cables required for tunnel and rack, RF engineers have been doing this

 Order NIM Power Supplies  Acquired 10 from surplus previously  Need 30 more  At a cost of $2.5K per supply, NIM supplies alone will cost an additional $75K!  One area with a large expenditure required!  Order 15 SSD Racks ($1.2K a rack, $18K)  Order any additional parts for SSD Rack (plumbing, connectors, etc.)

 BUILD AMPLIFIERS!!  Requires special jig for brazing heat sinks.  This item should be received shortly  May want to consider outside vendor to assemble the plumbing.  May be costly, but personnel is in short supply currently.  Would allow for more assembly line fabrication  May be necessary to meet future FY goals  Pre-fabrication of as many wires, cables, circuit boards, etc. as can be done

 In near term, one Screen Current Power Supply and Grid Bias Power Supply are being built for the Modulator.  Some parts remain to be ordered, but nothing show- stopping at the moment  20 of each supply will be built

 Labor estimate for SSD Amplifier Fabrication  Assumes heat sinks and as much pre-fabrication as possible (pre-assembly work)  Need at least 2 days for assembling first couple of amplifier modules (~ first 10), will progress faster once experienced.  Assuming 1.5 days on average, all 84 modules will require 126 days to be fabricated.  Very optimistic, will take longer depending on time to put heat sinks together.  Testing will (hopefully) be done in parallel with assembly.  T. Kubicki or J. Holm doing the testing?

 Testing of SSD Amps will take 1-2 days each.  Some are easier to calibrate than others.  Need RF tech(s) to build SSD relay racks.  5 have been built, just waiting for SSD amps.  Time consuming, depending on pre-assembly, can take up to 3 weeks to build one rack.  Verification of final assembly  At least one day to check out fully assembled rack at MI-60 test station

 Building Grid Bias and Screen Current Power Supplies  A lot of cables, wires need to be fabricated.  Assembly of components can begin.  Estimating ~3 weeks to fabricate either one Grid Bias or Screen Supply.  Very time consuming  Upgrading a Booster RF station  Takes about 2 days with prep work (i.e. cables cut, terminated, and phased matched)

 End of August  Have at least 1 SSD amplifier built and tested  Work out any “kinks” that may occur  At least One Grid Bias Supply and Screen Current Power Supply built and tested  Finish with the remaining NIM modules left to be tested  September-December ‘11  Have station 1 and 2 upgraded  Continue on building Amps, Power Supplies, Modulators, etc. Would like to see 20 SSD amps by Dec.  Assembly of SSD racks, cabling (rack and tunnel)

 January-March ‘12  Continue building racks, finish up with any remaining cables that need to be fabricated for the SSD rack.  Digital I/O cable  Have 40 amplifiers built and tested  Have at least 10 Grid Bias and Screen Current Power Supplies built and tested  April-June ‘12  All racks should be built by now

 Have at least 60 SSD amplifiers built and tested  Have at least 15 Grid Bias and Screen Current Power Supplies built and tested  East Gallery converted to Solid State by now, progression in the West Gallery  July-September ’12  Finish up with the remaining Solid State amplifiers  Finish up with the remaining Grid Bias and Screen Current Power Supplies  Finishing up converting the West Gallery to Solid State

 Needless to say, the RF group has a lot to do!  To meet FY 12 goals, we need additional personnel to assist.  Operations and other ongoing projects (NML, HTS, A0PI, etc.) still require our attention.  Additional Funding for FY 11 (we could use a chunk of the $1.4M) to help achieve FY 12 goal of an all Solid-State Booster RF System  Proven designs work well and are reliable, but much assembly work is left to do!  Questions/Comments