Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project 23 March 2001, CERN Meeting del Consorzio INFN Status Reports on CPT Project, on.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Paolo Meridiani - INFN Roma11 ECAL perfomance: lessons learned and future plans P. Meridiani & C. Seez Physics Days 17/01/2007.
CHEP03 - UCSD - March 24th-28th 2003 T. M. Steinbeck, V. Lindenstruth, H. Tilsner, for the Alice Collaboration Timm Morten Steinbeck, Computer Science.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
Data Quality Monitoring of the CMS Tracker
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
CMS Software and Computing FNAL Internal Review of USCMS Software and Computing David Stickland Princeton University CMS Software and Computing Deputy.
C. Seez Imperial College November 28th, 2002 ECAL testbeam Workshop 1 Offline software for ECAL test beam The pre-processing model The offline software.
Test Of Distributed Data Quality Monitoring Of CMS Tracker Dataset H->ZZ->2e2mu with PileUp - 10,000 events ( ~ 50,000 hits for events) The monitoring.
CMS PRS Tracker b tau Software Lucia Silvestris INFN Bari Workshop on b/tau Physics at LHC 30 th May 2002.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
Event Data Model in ATLAS Edward Moyse (CERN) On behalf of the ATLAS collaboration CHEP 2004, Interlaken.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
DPA follow-up review, Malargüe, Nov/2000 DPA Data Processing and Analysis Task Follow-up Review Malargüe, November 14, 2000.
Root based event display Dmitry Romanov October 19, 2010.
1 Planning for Reuse (based on some ideas currently being discussed in LHCb ) m Obstacles to reuse m Process for reuse m Project organisation for reuse.
19 November 98 1 Jürgen Knobloch ATLAS Computing ATLAS Computing - issues for 1999 Jürgen Knobloch Slides also on:
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
Muon LPC Meeting, 14 Sep Overview of Muon PRS Activities Darin Acosta University of Florida.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
CMS Computing and Core-Software USCMS CB Riverside, May 19, 2001 David Stickland, Princeton University CMS Computing and Core-Software Deputy PM.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
Vertex finding and B-Tagging for the ATLAS Inner Detector A.H. Wildauer Universität Innsbruck CERN ATLAS Computing Group on behalf of the ATLAS collaboration.
Introduction to CMSSW Framework Concepts Simulation & Reconstruction Liz Sexton-Kennedy January 10, 2008.
VICOMTECH VISIT AT CERN CERN 2013, October 3 rd & 4 th O.COUET CERN/PH/SFT DATA VISUALIZATION IN HIGH ENERGY PHYSICS THE ROOT SYSTEM.
The CMS Simulation Software Julia Yarba, Fermilab on behalf of CMS Collaboration 22 m long, 15 m in diameter Over a million geometrical volumes Many complex.
28 July 2006 CERN REU Status Report 1 Lindsey Gray, University of Florida RCT Trigger Supervisor and Database Project Status Lindsey Gray Advisors: Dr.
CMS Computing and Core-Software Report to USCMS-AB (Building a Project Plan for CCS) USCMS AB Riverside, May 18, 2001 David Stickland, Princeton University.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Data Quality Monitoring for the CMS Resistive Plate Chamber Detector Anna Cimmino etc etc etc Università degli Studi di Napoli “ Federico II ” & INFN of.
Computing R&D and Milestones LHCb Plenary June 18th, 1998 These slides are on WWW at:
Friday the 18th of May, 2001US CMS Physics J.G. Branson1 Physics in (US) CMS James G. Branson UC San Diego US CMS Collaboration Meeting Riverside CA.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Calorimeter Simulation Infrastructure Norman Graf Arlington ‘03.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, June 14 th 2012.
USCMS Physics, May 2001Darin Acosta1 Status Report of PRS/  D.Acosta University of Florida Current U.S. activities PRS/  Activities New PRS organization.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
CWG13: Ideas and discussion about the online part of the prototype P. Hristov, 11/04/2014.
04/09/2007 Reconstruction of LHC events at CMS Tommaso Boccali - INFN Pisa Shahram Rahatlou - Roma University Lucia Silvestris - INFN Bari On behalf of.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
CMS TRACKER VISUALISATION TOOLS M.S. MENNEA, a G. ZITO, a A. REGANO a AND I. OSBORNE b a Dipartimento Interateneo di fisica di Bari & INFN sezione di Bari,
Introduction to FCC Software FCC Istanbul 11 March, 2016 Alice Robson (CERN/UNIGE) on behalf of / with thanks to the FCC software group.
Simulation Production System Science Advisory Committee Meeting UW-Madison March 1 st -2 nd 2007 Juan Carlos Díaz Vélez.
VI/ CERN Dec 4 CMS Software Architecture vs Hybrid Store Vincenzo Innocente CMS Week CERN, Dec
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
David Lange Lawrence Livermore National Laboratory
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Track reconstruction of cosmic ray real data with the CMS tracker Piergiulio Lenzi Dipartimento di Fisica & INFN Firenze on behalf of the Silicon Strip.
ALICE – First paper.
HERD Prototype Beam Test
An ODBMS approach to persistency in CMS
Commissioning of the ALICE HLT, TPC and PHOS systems
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
DQM for the RPC subdetector
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
ATLAS DC2 & Continuous production
BES III Software: Short-term Plan ( )
Presentation transcript:

Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project 23 March 2001, CERN Meeting del Consorzio INFN Status Reports on CPT Project, on Tracker b Tau organization and Software deliverables

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project CPT Project (1) Computing Physic reconstruction and selection Tridas Core and Computing Software Physics Reconstruction and Selection Tridas Filter Farm Martti Pimia David Stickland Paris Sphicas Sergio Cittolin... 6 Tasks 4 Tasks 2 Tasks

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project CPT Project (2) Computing Physic reconstruction and selection Tridas CCS PRS Trida s CAFE SPROM RPROM CPROM??

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project CPT Project (3) More detail on this project could be found in the different presentation in the last CMS week... A preliminary document on the Software Task and deliverables for the CPT project could be found on the Lucas Taylor page This document is a living document that will be used for define deliverables and priorities on the different part of the project.

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project Tracker - b tau Organization (as presented in TIB on 23 October) Beam Tests, DataBases, Module Quality & Integration Tests Simulation Reconstruction Alignment Data Handling B Tagging Tau Tagging Tasks Lists: Simulation, Reconstruction, Alignment, Data Handling, B Tagging, Tau Tagging Distributed Tasks: Beam tests, Databases, Module Quality & Integration Tests

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project Simulation Task Breakdown 1) Model of Geometry and Material (complete tracker, beam test setup) G3 and G4 2) Transport: tuning of tracker specific physics effects ( “ cutoff on delta rays, photons and low energy interactions, simhits) G3 and G4 3) Model of detector and electronics response (digi and zero soppression) Related tasks: detector HW, beam-test, (mis) -alignment, database storage, CCS simulation (& framework)

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project Reconstruction task breakdown Use same architecture for on-line and off-line reconstruction. Off-line reconstruction could/will use slower procedures (I.e. more data, more sophisticated algorithms, full coverage in eta -phi) 1) Cluster Reconstruction 2) Track Reconstruction 3) Vertex Reconstruction (primary and secondary vertex) Related tasks: beam-test, Module tests, alignment, data- handling, database, CCS Reconstruction (& framework) More details on ongoing and planned activities on Tracker b tau Web page (this comes from the first series of mini-workshops done in collaboration with e-gamma and muon groups)

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project Alignment Task Breakdown Includes software tools needed for Tracker Alignment and for the integration with the Muon-link System. 1) Tools for displace set of tracker modules 2) Different Alignment algorithms 3) Simulation of the Tracker Position Monitoring System 4) Specific Cluster Reconstruction for Position Monitoring System etc.. 5) Tracker Alignment Data Base Prototype 6) Software for the integration with the Muon-link System Related tasks: Simulation, Reconstruction, Beam Test, database, Detector hardware..

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project Data Handling Task Breakdown Software that lie at the interface between online-reconstruction software and hardware. Coordination between Software and data acquistition is crucial. 1) FED Clusterization (Online) and zero soppression 2) readout Software Partitions 3) ADC dynamic range definition (calibration) 4) Data synchronization in time 5) Data formatting 6) Data and Detector monitoring Related tasks: Reconstruction, Simulation, TK Electronic integration, HW (FED, ADC,..) Beam Tests, Tridas (& framework)

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project B Tagging Task Breakdown This task cover the b tagging at the different stages of the reconstruction and event selection (L3 Trigger, off-line). Tools for common issues with other sub-detectors will be done in close collaboration with the other PRS groups Related Tasks: Simulation, Reconstruction, Data-handling, All the other PRS Groups, CCS and Tridas. (on-line farms), Physics Analysis Next series of mini-workshops on b-tagging, tau tagging in collaboration with jet-met group.

23 March 2001, Firenze Meeting del Consorzio INFN Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project Tau Tagging Task Breakdown This task cover the tau tagging at the different stages of the reconstruction and event selection (L3 Trigger, off-line). Tools for common issues with other sub-detectors will be done in close collaboration with the other PRS groups Related Tasks: Simulation, Reconstruction, Data-handling, All the other PRS Groups, CCS and Tridas. (on-line farms), Physics Analysis