F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Status Update on Mechanical Prototype in Rome November 6,
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Update on GEM-based DHCAL for SiD Andy White For GEM/DHCAL Group September 21, 2005.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
G.Bencivenni LNF-INFN, GEM Training Session – CERN, 16, Feb THE LHCb EXPERIENCE WITH THE ASSEMBLY OF THE GEM (*) G. Bencivenni LNF - INFN Italy.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
TRD R&D at GSI  Results from test beam 2004  Plans for test beam Feb. 06  Measurements with X-ray stand C. Garabatos, GSI.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
T.Schneider/LHCb Muon EDR
HV connection for a Common GEM foil design Aiwu Zhang
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
1 Tungsten supply and assembly, test beam setup Market survey on tungsten supply Ideas on the frame design Experimental area Test beam setup Wolfgang Klempt/
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Large area detectors Aida WP 9.2 RD51 WG6
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
PNPI, R&D MUCH related activity ● Segmentation ● Simulation of the neutral background influence ● R&D of the detectors for MUCH ● Preparation to the beam.
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
LHCb Muon System TDR Outline: Introduction –Physics requirements –Background conditions Overview of the Muon System Physics Performance –L0 muon trigger.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
C. CombaretSept 2007 Thoughts on DHCAL slabs What we need : Around 40 detector plans stacked in 1 meter Large plans : around 2 m x 1 m (70cm x 70cm for.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
F. Murtas CERN-INFN Frascati December 2 th 2013 – He3 free detectors Italy Workshop 1 Front End Electronics for GEM detector  Neutron detectors and GEM.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
GEM Integrated PCB readout and cooling
Update on Pavia MM mechanical prototype
Mauro Savrie' INFN Ferrara
GRPC activity for EuDHCAL in IHEP-Protvino
GEM-based Digital Hadron Calorimetry for SiD
Beamstrahlung Monitor
(On Behalf of CMS Muon Group)
Beam Monitors with GEM detectors
Presentation transcript:

F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress  Material budget  Conclusions

F. Murtas LNF/INFN 9 July 2002 The frame with glue is placed on top of the streched gem foil and pressed. After 2 hours the frame is ready. We have preformed several trials with Araldite glues : Type working time 50% hardness Ciba min 3 h Ciba min 10 h Ciba min 2 h 1 frame glued with frames glued with x 24 GEM FRAMES

F. Murtas LNF/INFN 9 July and finally the cathode The three Gem frames are placed on top of the others without spacers... PROTOTIPE ASSEMBLING

F. Murtas LNF/INFN 9 July 2002 PSI TEST BEAM 2 chambers 20x24 with different geometry:  mm  mm Total current of 27  A on pads with divider with 7 independent hv channel 27  A 14  A detailed analysis next meeting

F. Murtas LNF/INFN 9 July 2002 MODULE 0 : NEW GEM FOIL 200 mm 240 mm 34 mm G10 Frame Holes for SMD decupling resistor

F. Murtas LNF/INFN 9 July 2002 MODULE 0 : FRAME DESIGN G10 frames of mm of thickness Holes for SMD decupling resistors Frame profile Glue Ciba 2012 Glue “Rail” Kapton foil 5mm Glue for the next frame

F. Murtas LNF/INFN 9 July 2002 ~ 1 Kg/cm Kapton foil Frame prototype BREAKING LOAD ~ 8 Kg/cm !

F. Murtas LNF/INFN 9 July 2002 GEM FRAMES PILEUP 200 mm 240 mm HV

F. Murtas LNF/INFN 9 July 2002 MODULE 0 : PCB PAD Gas inlet holes 7 ASDQ cards connector 5 ASDQ cards connector Next week test with foam

F. Murtas LNF/INFN 9 July x 240 mm 45 MODULE 0 : PCB CATHOD ready in 3 weeks HV connector for divider GEM frame Cathod

F. Murtas LNF/INFN 9 July 2002 Honeycomb or foam gas inletgas outlet A B HV FEE DOUBLE CHAMBER LAYOUT G3 G2 G1 F gas fitting HV top view side view hv divider

F. Murtas LNF/INFN 9 July 2002 MATERIAL BUDGET Material budget for one GEM chamber 2 MWPC Pannels with: - 1 PCB Pad G mm of thikness and 35  m Cu - 1 PCB Cathod G mm of thikness and 35  m Cu - 1 Ground/shielding.. G mm of thikness and 35  m Cu 3 Frames of 22 mm wide (36 mm for only one side) 1-3 mm thick 3 Gem Foils  m Kapton and 5+5  m Cu Total 5-6% X 0 2-3% 1% X % X % X 0 0.5% 4 % Double Gem Chamber about 16% 8 % X 0 (only detector )

F. Murtas LNF/INFN 9 July 2002 CONCLUSIONS  The 20x24 cm 2 prototype has been tested at PSI some hv instabilities with independent hv chnnels with divider (final solution) seems much better Final results on next meeting  Module 0 design and tools construction is going on  Material budget : X 0 foreseen ~ 16% 8% (only detector)  Module 0 ready for the end of Semptember

F. Murtas LNF/INFN 9 July tutte linguette di connessione da 6 mm di larghezza bus di alta tensione e’ da 4 mm di larghezza schema cornice 20 8

F. Murtas LNF/INFN 9 July Il foglio di kapton su cui e’ disegnato circuito deve avere dimensioni 340 x 340 mm. Il circuito che ha dimensioni 210 x 304 deve essere centrato com in figura

F. Murtas LNF/INFN 9 July 2002 Double Chamber layout Honeycomb gas inletgas outlet G3 G2 G1 F gas in/outlet gas fitting A B HV resistors FEE

F. Murtas LNF/INFN 9 July 2002 GEM FOIL LAYOUT 20 cm 24 cm