BLM Lower Sonoran Field Office Arizona. BLM Lower Sonoran Field Office Arizona.

Slides:



Advertisements
Similar presentations
RMP Workshop Objectives Visual, Travel & Special Designations Bureau of Land Management Carlsbad Field Office February 1 st and 2 nd, 2012 Presentation.
Advertisements

AN M3 EAGLE LLC PROPOSAL. Acting Field Manager Coeur d’Alene Field Office (208)
Gateway National Recreation Area Jamaica Bay Transportation Studies at Floyd Bennett Field, Jacob Riis Park, Riis Landing, and the Former Pennsylvania.
Lake-scale planning for management, conservation and restoration Objective: Bring together researchers, managers, NGO representatives and other interested.
Southeast Alaska Land Entitlement Finalization and Jobs Protection Act S. 340 and H.R. 740 Presentation for the Citizens’ Advisory Commission on Federal.
Thanks for joining us. We’ll be starting soon. To join the teleconference, dial , passcode # To download handouts : Click the Handouts.
An Introduction to Comprehensive Conservation Planning for National Wildlife Refuges U.S. Fish and Wildlife Service Pacific Region.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Environmental Impact Statement Process Development Services Department Carol Helland, Land Use Director/SEPA Official (DSD) David Pyle, Senior Land Use.
 Meeting Administration and Objectives  The Partnership  Understanding the Study Area  What We Heard  Alternatives to be Evaluated  Participant.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Bureau of Land Management NAIP Information Meeting July 19 th, 2006.
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
SOUTH COAST RESOURCE MANAGEMENT PLAN REVISION BUREAU OF LAND MANAGEMENT Palm Springs-South Coast Field Office California Desert District.
Draft RMP/EIS. Objectives Write a draft land use plan and EIS. Issue a draft land use plan and EIS for public review.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Planning for Travel and Transportation Management National Training Center Course # Unit Six Transportation System Development.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Joe Vieira Project Manager BLM Colorado Renewable Energy Team 6/28/2011.
US FOREST SERVICE REGIONAL ROUNDTABLE Planning Rule Revision Photographer: Bill Lea.
BLM-Alaska Overview Bud C. Cribley BLM-Alaska State Director Western Interstate Region Board of Directors Meeting Board of Directors Meeting May 21, 2014.
Travel Management Rule Implementation
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
+ Drummond Island Comprehensive Resource Management Plan.
Eastern Interior Resource Management Plan/ Environmental Impact Statement Update for the Resource Advisory Council — October 29, 2013.
Getting It… Developing Interagency Core Trail Data Standards National Park Service - Bureau of Land Management - USDA Forest Service Together.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
Resource Management Plan (RMP) Revision for the Las Vegas and Pahrump Field Offices Muddy Mountains.
Atlin/Taku Land Use Planning Update Presentation to Multiparty Workshop #3 March 6, 2009.
Modern-Day Factors Affecting the Management of the Chequamegon- Nicolet National Forest April 12, 2011Paul Strong, Forest Supervisor.
Phase 3 Environmental Documentation Process SEQUOIA NATIONAL FOREST AND GIANT SEQUOIA NATIONAL MONUMENT.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
SEQUOIA NATIONAL FOREST AND GIANT SEQUUOIA NATIONAL MONUMENT.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
The National Environmental Policy Act and Oil and Gas Development in Region 8 WESTAR Oil and Gas Conference October 22, 2008.
Welcome Opportunity to Learn – Public, Groups, Agencies and FS Patience Respect Ask.
Weaver Mountain Fuels Treatment Project BLM Phoenix Field Office N. 7 th Ave Phoenix, AZ.
Effects Analysis and Comparison. Objectives Accurately determine which impacts need to be evaluated in the land use plan. Develop a matrix comparing the.
Cave and Karst Management Through Land Use Planning James Goodbar Sr. Cave Specialist Bureau of Land Management Cody, Wyoming May 12-16, 2014 Aaron Stockton.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Col Charles Corcoran, 3 WG/CC Maj Gary Wallace, 3 OSS/ADO Ms.
Monitoring and Evaluation. Objective Identify appropriate monitoring techniques. Identify approaches to evaluating plan implementation and effectiveness.
United States Department of Interior Bureau of Land Management Winnemucca District Draft Resource Management Plan and Draft Environmental Impact Statement.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
JACK MORROW HILLS COORDINATED ACTIVITY PLAN Bureau of Land Management Rock Springs Field Office Supplemental Draft Environmental Impact Statement Public.
RESOURCE ADVISING IN SPECIAL MGMT. AREAS. TYPES OF SMA’S Designated Wilderness WSA - Wilderness Study Area National Monuments and similar areas Wild and.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Draft Supplemental Environmental Impact Statement for the Upper Las Vegas Wash Conservation Transfer Area Nevada BLM Southern Nevada District Office.
Energy Policy Act – 2005 West-Wide Energy Corridors.
Sage-Grouse Planning Strategy Northwest Colorado Greater Sage-Grouse Environmental Impact Statement Draft EIS Public Meetings October, Forest Service.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Session 21 (R) Utility Scale Solar Development Land and Permitting Issues March 30, 2016.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
THE L AND U SE P LANNING P ROCESS CHAPTER III – LAND USE PLANNING PROCESS in H – PLANNING FOR RECREATION AND VISITOR SERVICES 1. Overview of LUP.
Planning – LUP Process I. Introduction II. Inventory Procedures III.Planning A. Background to LWCs in Planning B. Factors to Consider When Protecting LWCs.
RUSHMORE CONNECTOR TRAIL WELCOME Rushmore Connector Trail Environmental Impact Statement Scoping Meeting June 14, Hill City June 16, Rapid.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
“The people’s forests” Public Participation in National Forest Planning Susan Jane Brown, Staff Attorney Western Environmental Law Center The National.
Scoping Meeting April 20th 6:00 pm
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Supplemental Environmental Impact Statement and
Fifth Standard Solar Project Complex
Photovoltaic Systems Engineering Utility Scale Development:
Presentation transcript:

BLM Lower Sonoran Field Office Arizona

BLM Lower Sonoran Field Office Arizona

Welcome !  Location of restrooms & telephones  Please turn-off or silence pagers and cell phones BLM Lower Sonoran Field Office Arizona

 Critique ideas, not people…show respect for the views of others  What is the rule on confidentiality?  Listen with an open mind – many different users  Avoid side conversations  Speak for yourself…in your own words  Thirty second soapbox?  Enjoy your time together BLM Lower Sonoran Field Office Arizona

 Welcome and introductions  Resource Management Plan presentation  Participant discussion - please hold questions until this portion of the agenda  Open House BLM Lower Sonoran Field Office Arizona

BLM Lower Sonoran Field Office Arizona

BLM Lower Sonoran Field Office Arizona

BLM Lower Sonoran Field Office Arizona  Encroaching urban-interface  New & changing land uses  Need to consolidate several planning documents  2001 Presidential Proclamation of SDNM

BLM Lower Sonoran Field Office Arizona

 1.4 million surface acres  Sonoran Desert Nat’l Mon. (486,400 acres)  Anza Nat’l Historic Trail  Six Wilderness Areas  Four endangered & four candidate species  High interest in utility- scale solar energy development BLM Lower Sonoran Field Office Arizona

Two Decision Areas:  Sonoran Desert National Monument – 486,400 acres  Lower Sonoran – 930,200 acres At the end of the process, there will be two Records of Decision BLM Lower Sonoran Field Office Arizona

 Extensive scoping in 2003 at 11 public meetings – received >6000 comments  Ongoing engagement with the Resource Advisory Council (RAC), government agencies, user interests, environmental groups and tribes. BLM Lower Sonoran Field Office Arizona

BLM Lower Sonoran Field Office Arizona Management Topics Renewable and traditional energy facilities T&E habitat, wildlife corridors and water developments Wilderness Characteristics Transportation and access Compatibility of livestock grazing with protecting monument objects in the SDNM Recreational target shooting

LS-SDNM DRMP/EIS Alternative ANo action: Current management (baseline for resource and land use allocations) Alternative BResource use and development emphasis Alternative CBalance of resource use and protection Alternative DResource protection emphasis Alternative EPreferred BLM Lower Sonoran Field Office Arizona Provide a range of reasonable combinations of resource uses and mgt practices developed to address issues identified during scoping that offer distinct choice among potential mgt strategies.

GIS analysis to identify potential conflicts?  Exclude from development  NLCS, WC, ACECs, Fred J. Weiler (PL 1015) Greenbelt, Sentinel Plain  Avoidance BLM Lower Sonoran Field Office Arizona Collaboration with Restoration Design Energy Project (RDEP). Solar PEIS and RDEP will amend RMPs, if necessary. Preferred alternative does not conflict with other ongoing analyses.

BLM Lower Sonoran Field Office Arizona

BLM Lower Sonoran Field Office Arizona Merit special mgt attention to protect resources and prevent irreparable damage (Appendix V)

BLM Lower Sonoran Field Office Arizona

BLM Lower Sonoran Field Office Arizona

BLM Lower Sonoran Field Office Arizona

 Designate as perennial, perennial/ephemeral, or ephemeral, as appropriate  Consider season of use adjustments  Further analyses for allotment management plan NEPA  Land Health Evaluation (LHE) completed for six SDNM allotments  Compatibility analysis completed (Append. E)  Finding – modified grazing practices would be compatible. BLM Lower Sonoran Field Office Arizona

 All 930,200 acres will remain open for recreational target shooting  Activity may be adaptively managed due to safety concerns or resource conflicts BLM Lower Sonoran Field Office Arizona Hunting would continue in accordance with federal, state and local laws

BLM Lower Sonoran Field Office Arizona Substantive Comments:  Reasonably question accuracy of:  Information;  Assumptions;  Methodology;  Present new information;  Provide reasonable alternatives;  Cause revision of alternative(s);  Be specific, detailed, factual.

Mail: BLM, N 7 th Ave, Phoenix, AZ Fax: ePlanning – Access now (we will help) if ready to comment or access by web address below later BLM Lower Sonoran Field Office Arizona

BLM Lower Sonoran Field Office Arizona RMP Timetable Aug 26, 2011 Draft Resource Mgt Plan released Oct 2011 Public meetings held Nov 25, 2011 Public Comment Period Ends; Prepare Proposed RMP May 2012 Proposed Resource Mgt Plan / Final EIS released June 2012 (30 days) Protest period (for those with “standing”) Sept Records of Decision signed Oct 2012 (30 days) Appeal period (implementation decisions)

 National Landscape Conservation System  Wildlife Habitat  Recreation  Livestock Grazing  Cultural Resources  Travel Management  Energy & Land Use  Minerals BLM Lower Sonoran Field Office Arizona BLM planning team are here to answer questions specific to DRMP

We are so pleased you joined us tonight. Thank you for sharing your evening to help improve management of our Public Land. BLM Lower Sonoran Field Office Arizona