Statistical Process Control Operations Management Dr. Ron Tibben-Lembke.

Slides:



Advertisements
Similar presentations
© 1997 Prentice-Hall, Inc. S3 - 1 Principles of Operations Management Quality Via Statistical Process Control Chapter S3.
Advertisements

Candy Capability Operations Management Dr. Ron Lembke.
Operations Management Statistical Process Control Supplement 6
1 Managing Quality Quality defined Total cost of quality Strategic Quality –Total quality management (TQM) –Continuous improvement tools Quality assurance.
Chapter 9A Process Capability and Statistical Quality Control
Chapter 9A. Process Capability & Statistical Quality Control
Chapter Topics Total Quality Management (TQM) Theory of Process Management (Deming’s Fourteen points) The Theory of Control Charts Common Cause Variation.
Statistical Process Control. 4-2 Lecture Outline  Basics of Statistical Process Control  Control Charts  Control Charts for Attributes  Control Charts.
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Quality Management 09. lecture Statistical process control.
Statistical Process Control Operations Management Dr. Ron Lembke.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Chapter 18 Introduction to Quality
Statistical Process Control Operations Management Dr. Ron Tibben-Lembke.
Statistical Process Control
Statistical Process Control Managing for Quality Dr. Ron Lembke.
Statistical Process Control Dr. Ron Lembke. Statistics.
Statistical Process Control A. A. Elimam A. A. Elimam.
Candy Capability Dr. Ron Tibben-Lembke. Lotta Candy.
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
Process Improvement Dr. Ron Tibben-Lembke. Statistics.
CHAPTER 8TN Process Capability and Statistical Quality Control
Process Improvement Dr. Ron Tibben-Lembke. Quality Dimensions  Quality of Design Quality characteristics suited to needs and wants of a market at a given.
Module 3: Statistical Quality Control Operations Management as a Competitive Weapon.
MIM 558 Comparative Operations Management Dr. Alan Raedels, C.P.M.
Process Capability Operations Management Dr. Ron Tibben-Lembke.
Using Control Charts to Keep an Eye on Variability Operations Management Dr. Ron Lembke.
QUALITY CONTROL AND SPC
X-bar and R Control Charts
Statistics for Managers Using Microsoft® Excel 4th Edition
Statistical Process Control
Statistical Quality Control/Statistical Process Control
Statistical Applications in Quality and Productivity Management Sections 1 – 8. Skip 5.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 5: Process Performance and Quality Objectives: Understand.
© 2004 Prentice-Hall, Inc. Basic Business Statistics (9 th Edition) Chapter 18 Statistical Applications in Quality and Productivity Management Chap 18-1.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control Chapters A B C D E F G H.
Process Capability and SPC
© 2003 Prentice-Hall, Inc.Chap 13-1 Business Statistics: A First Course (3 rd Edition) Chapter 13 Statistical Applications in Quality and Productivity.
Process Capability and Statistical Process Control.
© 2002 Prentice-Hall, Inc.Chap 15-1 Statistics for Managers Using Microsoft Excel 3 rd Edition Chapter 15 Statistical Applications in Quality and Productivity.
© 2003 Prentice-Hall, Inc. Quantitative Analysis Chapter 17 Statistical Quality Control Chap 17-1.
Fall Exam #2 Key ISAT 211 Fall 2000 Sections 1 & 2.
Statistical Quality Control/Statistical Process Control
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Statistical Applications in Quality and Productivity Management.
Statistical Quality Control
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
Six Sigma Operations Management Dr. Ron Lembke. 6 sigma  DPMO: Defects Per Million Opportunities  DMAIC: Define, Measure, Analyze, Improve, and Control.
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
MGS8020 Measure.ppt/Mar 26, 2015/Page 1 Georgia State University - Confidential MGS 8020 Business Intelligence Measure Mar 26, 2015.
Inspection- “back-end quality control” BUT, Start by designing quality into the front end of the process- the design QFD (Quality Function Deployment)
Quality Control  Statistical Process Control (SPC)
Process Capability and Statistical Quality Control.
© 1998 Prentice-Hall, Inc. Statistics for Managers Using Microsoft Excel, 1/e Statistics for Managers Using Microsoft Excel Statistical Applications.
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 18-1 Chapter 18 Statistical Applications in Quality and Productivity Management Basic Business.
Process Capability Process limits (The “Voice of the Process” or The “Voice of the Data”) - based on natural (common cause) variation Tolerance limits.
POPULATION VERSUS SAMPLE
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Statistics for Managers Using Microsoft Excel 3rd Edition
Process Variability and Capability
Statistical Process Control
Operations Management Dr. Ron Lembke
Operations Management Dr. Ron Lembke
Presentation transcript:

Statistical Process Control Operations Management Dr. Ron Tibben-Lembke

Designed Size

Natural Variation

Theoretical Basis of Control Charts 95.5% of all  X fall within ± 2  Properties of normal distribution

Theoretical Basis of Control Charts Properties of normal distribution 99.7% of all  X fall within ± 3 

Design Tolerances  Design tolerance: Determined by users’ needs UTL -- Upper Tolerance Limit LTL -- Lower Tolerance Limit Eg: specified size +/ inches  No connection between tolerance and  completely unrelated to natural variation.

Process Capability and 6   A “capable” process has UTL and LTL 3 or more standard deviations away from the mean, or 3σ.  99.7% (or more) of product is acceptable to customers LTLUTL 33 66 LTLUTL

Process Capability LTLUTL LTL UTL CapableNot Capable LTLUTL LTLUTL

Process Capability  Specs: 1.5 +/  Mean: Std. Dev. =  Are we in trouble?

Process Capability  Specs: 1.5 +/ LTL = 1.5 – 0.01 = 1.49 UTL = = 1.51  Mean: Std. Dev. = LCL = *0.002 = UCL = = Process Specs

Capability Index  Capability Index (C pk ) will tell the position of the control limits relative to the design specifications.  C pk >= 1.0, process is capable  C pk < 1.0, process is not capable

Process Capability, C pk  Tells how well parts produced fit into specs Process Specs 33 33 LTLUTL

Process Capability  Tells how well parts produced fit into specs  For our example:  C pk = min[ 0.015/.006, 0.005/0.006]  C pk = min[2.5,0.833] = < 1 Process not capable

Process Capability: Re-centered  If process were properly centered  Specs: 1.5 +/ LTL = 1.5 – 0.01 = 1.49 UTL = = 1.51  Mean: 1.5 Std. Dev. = LCL = *0.002 = UCL = = Process Specs

If re-centered, it would be Capable Process Specs

Packaged Goods  What are the Tolerance Levels?  What we have to do to measure capability?  What are the sources of variability?

Production Process Make Candy PackagePut in big bags Make Candy Mix Mix % Candy irregularity Wrong wt.

Processes Involved  Candy Manufacturing: Are M&Ms uniform size & weight? Should be easier with plain than peanut Percentage of broken items (probably from printing)  Mixing: Is proper color mix in each bag?  Individual packages: Are same # put in each package? Is same weight put in each package?  Large bags: Are same number of packages put in each bag? Is same weight put in each bag?

Your Job  Write down package # Weigh package and candies, all together, in grams and ounces Write down weights on form  Optional: Open package, count total # candies Count # of each color Write down Eat candies  Turn in form and empty complete wrappers for weighing

Peanut Color Mix website  Brown 17.7%20%  Yellow 8.2%20%  Red 9.5%20%  Blue15.4%20%  Orange26.4%10%  Green22.7%10%

Classwebsite  Brown12.1%30%  Yellow14.7%20%  Red11.4%20%  Blue19.5%10%  Orange21.2%10%  Green21.2%10% Plain Color Mix

So who cares?  Dept. of Commerce  National Institutes of Standards & Technology  NIST Handbook 133  Fair Packaging and Labeling Act

Acceptable?

Package Weight  “Not Labeled for Individual Retail Sale”  If individual is 18g  MAV is 10% = 1.8g  Nothing can be below 18g – 1.8g = 16.2g

Goal of Control Charts  collect and present data visually  allow us to see when trend appears  see when “out of control” point occurs

Process Control Charts  Graph of sample data plotted over time UCL LCL Process Average ± 3  Time X

Process Control Charts  Graph of sample data plotted over time Assignable Cause Variation Natural Variation UCL LCL Time X

Attributes vs. Variables Attributes:  Good / bad, works / doesn’t  count % bad (P chart)  count # defects / item (C chart) Variables:  measure length, weight, temperature (x-bar chart)  measure variability in length (R chart)

p Chart Example You’re manager of a 500- room hotel. You want to achieve the highest level of service. For 7 days, you collect data on the readiness of 200 rooms. Is the process in control (use z = 3)? © 1995 Corel Corp.

p Chart Hotel Data No.No. Not DayRoomsReady Proportion /200 =

p Chart Control Limits n n k i i k   

p Chart Control Limits p X n i i k i i k      n n k i i k   

p Chart Control Limits # Defective Items in Sample i Sample i Size UCLpz p n p X n p i i k i i k         (1 - p) 1 1

p Chart Control Limits # Defective Items in Sample i Sample i Size UCLpz pp) n p X n p i i k i i k        (1 1 1 z = 2 for 95.5% limits; z = 3 for 99.7% limits # Samples n n k i i k    1

p Chart Control Limits # Defective Items in Sample i # Samples Sample i Size z = 2 for 95.5% limits; z = 3 for 99.7% limits LCLpz n n k p X n p i i k i i k i i k       11 1 and pp) n  (1 UCLpz pp) n p   (1

p Chart p p  n pp)  ( * ( ) p X n i i k i i k      n n k i i k   

p Chart  or &.0268 p p  n pp)  ( * ( ) p X n i i k i i k      n n k i i k   

p Chart UCL LCL

R Chart  Type of variables control chart Interval or ratio scaled numerical data  Shows sample ranges over time Difference between smallest & largest values in inspection sample  Monitors variability in process  Example: Weigh samples of coffee & compute ranges of samples; Plot

You’re manager of a 500- room hotel. You want to analyze the time it takes to deliver luggage to the room. For 7 days, you collect data on 5 deliveries per day. Is the process in control? Hotel Example

Hotel Data DayDelivery Time

R &  X Chart Hotel Data Sample DayDelivery TimeMeanRange Sample Mean =

R &  X Chart Hotel Data Sample DayDelivery TimeMeanRange Sample Range = LargestSmallest

R &  X Chart Hotel Data Sample DayDelivery TimeMeanRange

R Chart Control Limits Sample Range at Time i # Samples From Exhibit 6.13

Control Chart Limits

R R Chart Control Limits R k i i k      

R Chart Solution From 6.13 (n = 5) R R k UCLDR LCLDR i i k R R        (2.11)(3.894)8232 (0)(3.894) 

R Chart Solution UCL

 X Chart Control Limits UCLXAR X X k X i i k     2 1 Sample Range at Time i # Samples R R k i i i k    1

 X Chart Control Limits Sample Range at Time i # Samples Sample Mean at Time i From 6.13

Exhibit 6.13 Limits

R &  X Chart Hotel Data Sample DayDelivery TimeMeanRange

 X Chart Control Limits X X k R R k i i k i i k            

 X Chart Control Limits From 6.13 (n = 5) X X k R R k UCLXAR i i k i i k X            *  

 X Chart Solution From 6.13 (n = 5) X X k R R k UCLXAR LCLXAR i i k i i k X X             (058) 5813(058) (3.894) =   (3.894) = 8.060

 X Chart Solution*  X, Minutes Day UCL LCL

Thinking Challenge You’re manager of a 500- room hotel. The hotel owner tells you that it takes too long to deliver luggage to the room (even if the process may be in control). What do you do? © 1995 Corel Corp. N

 Redesign the luggage delivery process  Use TQM tools Cause & effect diagrams Process flow charts Pareto charts Solution MethodPeople Material Equipment Too Long

Dilbert’s View 11/27/06

Fortune Story  58 large companies have announced Six Sigma efforts  91% trailed S&P 500 since then, according to Qualpro, (which has its own competing system)  July 11, 2006

 Qualpro’s “Six Problems with Six Sigma” Six sigma novices get “low hanging fruit” “Without years of experience under the guidance of an expert, they will not develop the needed competence” Green belts get advice from people who don’t have experience implementing it Loosely organized methodology doesn’t guarantee results (and they do?) Six Sigma uses simple math – not “Multivariable Testing” (MVT) Six Sigma training for all is expensive, time-consuming Pressure to “do something” – low value projects

Six Sigma  Narrow focus on improving existing processes  Best and Brightest not focused on developing new products  Fortune July 11, 2006  Can be overly bureaucratic

Final Thought  Early 1980’s, IBM Canada, (Markham Ont.)  Ordered from new supplier in Japan.  Acceptable quality level 1.5% defects, a fairly high standard at the time.  The Japanese firm sent the order with a few parts packed separately, & the following letter... © 1995 Corel Corp.

Final Thought Dear IBM: We don’t know why you want 1.5% defective parts, but for your convenience we have packed them separately. Sincerely, © 1995 Corel Corp.